Open Access. Powered by Scholars. Published by Universities.®
Construction Engineering and Management Commons™
Open Access. Powered by Scholars. Published by Universities.®
- Discipline
-
- Architecture (11)
- Civil Engineering (11)
- Construction Engineering (11)
- Education (3)
- Manufacturing (3)
-
- Mechanical Engineering (3)
- Business (2)
- Electrical and Computer Engineering (2)
- Materials Science and Engineering (2)
- Physical Sciences and Mathematics (2)
- Accounting (1)
- Computational Engineering (1)
- Computer Engineering (1)
- Computer Sciences (1)
- Educational Administration and Supervision (1)
- Educational Assessment, Evaluation, and Research (1)
- Engineering Education (1)
- Government Contracts (1)
- Higher Education Administration (1)
- Law (1)
- Online and Distance Education (1)
- Operational Research (1)
- Operations Research, Systems Engineering and Industrial Engineering (1)
- Power and Energy (1)
- Public Administration (1)
- Public Affairs, Public Policy and Public Administration (1)
- Social and Behavioral Sciences (1)
- Institution
- Keyword
-
- Construction (14)
- Architecture (11)
- Building (11)
- Engineering (11)
- Plumbing (11)
-
- Construction management (3)
- PPP (3)
- Public Sector (3)
- Educational Buildings (2)
- Employees Roles (2)
- Ireland (2)
- AGC (1)
- Accounting (1)
- Architect (1)
- Bachelor's degree (1)
- Behavior (1)
- Build (1)
- Builders (1)
- Building information modeling (1)
- Building--Estimates (1)
- CM (1)
- CTB (1)
- Cement-treated base (1)
- Civil engineering (1)
- Commodity (1)
- Computer peripheral (1)
- Concrete walls (1)
- Construction contracts (1)
- Construction manager (1)
- Construction projects (1)
- Publication
- Publication Type
Articles 31 - 45 of 45
Full-Text Articles in Construction Engineering and Management
The Art And Science Of Discontinuous Innovation: A Case Study In Product Reinvention, Daniel C. Smoot
The Art And Science Of Discontinuous Innovation: A Case Study In Product Reinvention, Daniel C. Smoot
Theses and Dissertations
Divergence of new and old technologies is a source of tremendous innovation potential. As the dizzying pace of technological innovation accelerates indefinitely into tomorrow, not only do new paths diverge exponentially; doors already opened are increasingly abandoned for the allure of things undiscovered. Mature, late-stage life-cycle products left behind in today's fast-paced world open the floodgates to reinvention. This paper tests the hypothesis that innovativeness can be encouraged through the learning and application of universal innovation principles and processes. The implications of this research area are far-reaching. If innovation can be encouraged, then it can likely be taught. If it …
Risk-Based Decision Model For Determining The Applicability Of An Earned Value Management System In Construction, Mark D. Workman
Risk-Based Decision Model For Determining The Applicability Of An Earned Value Management System In Construction, Mark D. Workman
Theses and Dissertations
New policy mandated by the Undersecretary of Defense for Acquisition, Technology and Logistics has lowered the dollar thresholds of contracts requiring earned value management (EVM). This policy directed that a "risk-based decision" be made to determine if EVM should be used on firm-fixed price contracts under $20 million. Although not previously applicable to Military Construction (MILCON) building projects or other Air Force Civil Engineer (CE) managed contracts, the new threshold requires that CE projects be evaluated for risk. Therefore, the focus of this research was to analyze the risk factors associated with construction contracts in an attempt to build a …
The Role Of The Architect: Changes Of The Past, Practices Of The Present, And Indications Of The Future, Chad B. Jones
The Role Of The Architect: Changes Of The Past, Practices Of The Present, And Indications Of The Future, Chad B. Jones
Theses and Dissertations
For centuries the architect was the master builder; the one who was responsible for both the design and the construction of a project with sufficient construction expertise to oversee the project from inception to completion. Eventually, complexity of projects required a higher level of specialization leading to the separation of the designer and the builder. Since that separation, the role of the designer, or architect, has continued to shift and evolve. In recent history, the architect has been the one selected by a building owner, at the inception of the project, as the professional who is able to assist and …
Automated Manipulation For The Lotus Filament Winding Process, Jeffrey V. Anderson
Automated Manipulation For The Lotus Filament Winding Process, Jeffrey V. Anderson
Theses and Dissertations
The filament-winding process produces quality consistent composite parts for many industries. Filament winding allows for consistent quality parts by automating the winding process. A recent development of filament winding is the Lotus process. The Lotus process reverses conventional filament winding by leaving the mandrel stationary and winding composite fiber around the mandrel. The automated Lotus filament-winding machine is controlled by four-axis control manipulating the Lotus ring around a fixed mandrel. This allows Lotus filament winding to wind parts that do not have a linear axis. Lotus filament winding is in its early stages of development. As a second step in …
A Decision Model For Choosing Among Photovoltaic Technologies To Generate Electricity At Grid-Connected Air Force Facilities: A Value-Focused Approach, Mostyn O. Kellner
A Decision Model For Choosing Among Photovoltaic Technologies To Generate Electricity At Grid-Connected Air Force Facilities: A Value-Focused Approach, Mostyn O. Kellner
Theses and Dissertations
The United States is currently consuming fossil fuels faster than natural processes can replace them. Our nation's leaders recognize that a diverse energy portfolio including renewable energy is the key to maintaining our economy, security, and the environment. The federal government is by far the greatest energy consumer; thus, our nation's leaders have directed federal agencies to strive to increase the use of renewable energy at federal facilities. Solar electricity technologies, in the form of photovoltaics, have great potential in the renewable energy mix. Although a major strategy should be integrating photovoltaics into the design of new facilities, an important …
Estimating Required Contingency Funds For Construction Projects Using Multiple Linear Regression, Jason J. Cook
Estimating Required Contingency Funds For Construction Projects Using Multiple Linear Regression, Jason J. Cook
Theses and Dissertations
Cost overruns are a critical problem for construction projects. The common practice for dealing with cost overruns is the assignment of an arbitrary flat percentage of the construction budget as a contingency fund. This research seeks to identify significant factors that may influence, or serve as indicators of, potential cost overruns. The study uses data on 243 construction projects over a full range of project types and scopes gathered from an existing United States Air Force construction database. The author uses multiple linear regression to analyze the data and compares the proposed model to the common practice of assigning contingency …
Behavior Of Filament Winding Fiber Reinforced Polymer Structural Members, Mohamed Soliman Samy Aguib
Behavior Of Filament Winding Fiber Reinforced Polymer Structural Members, Mohamed Soliman Samy Aguib
Archived Theses and Dissertations
Fiber-reinforced polymeric (FRP) composites are being considered for structural members in construction as lighter, more durable alternatives to steel and concrete. Unlike steel and similar isotropic materials where mechanical properties are independent of the applied load directions composites are anisotropic materials by nature. Pultredud FRP structural members that are considered unidirectional members are subjected to premature failure due to discontinuity of fiber in the transverse and through the thickness of the members in a shape of delamination failure. Proposed box-section structural member by utilizing filament-winding process using· woven roving mats instead of roving strands to reorganize the fibers in produced …
Correlating Factors Between Student Participation And Student Learning Via A Service Learning Project In Secondary Education: A Case Study, Shawn V. Jensen
Correlating Factors Between Student Participation And Student Learning Via A Service Learning Project In Secondary Education: A Case Study, Shawn V. Jensen
Theses and Dissertations
In this study a service-learning project was conducted with secondary students in a construction technology based course. Three research questions were considered; (1) does service learning projects help to engage student participation, (2) can students learn the course curriculum while participating in a service learning project, and (3) is there a correlation between student participation and student learning as it pertains to service learning projects? The data was collected through surveys, observations, interviews, and evaluations. The researcher concluded the following from the study; 92% of the students were actively participating in the two week service project, 76% of the students …
Addressing The Challenges That Are Emerging In The Continued Increase In Ppp Use In The Republic Of Ireland, Louis Gunnigan, David Eaton
Addressing The Challenges That Are Emerging In The Continued Increase In Ppp Use In The Republic Of Ireland, Louis Gunnigan, David Eaton
Conference papers
The Irish Government’s Public-Private Partnership (PPP) programme of pilot projects is now reaching its conclusion and PPP has become established as a key element in the strategy for provision of public sector facilities. Compiled through a literature review as part of a PhD level research project, this paper examines organisational culture differences between the public and private sectors and assesses the potential affect of these differences on the future development of the Irish PPP programme. By relating organisational culture differences to the emerging challenges relating to risk, value and innovation, it is evident that the lack of a partnering environment …
A Hybrid Course In Fundamentals Of Building Construction Using Combination Archived Video And Live Session Distance Learning, Vernon W. Lewis Jr., Carol L. Considine, June Ritchie
A Hybrid Course In Fundamentals Of Building Construction Using Combination Archived Video And Live Session Distance Learning, Vernon W. Lewis Jr., Carol L. Considine, June Ritchie
Engineering Technology Faculty Publications
A course in the Fundamentals of Building Construction has been a curricular requirement of the Civil Engineering Technology Program (CET) since its inception. This course was taught traditionally as an on-campus class. Over the last ten years, the CET program has expanded to contain an extensive distance learning component, with at least half of the enrollment located off campus. The model for the typical distance-learning class is to meet for three hours, once a week, with a fully interactive (voice) live class. In consideration of the demand of a growing distance learning system, it was decided to restructure this class …
A Critical Appraisal Of The Roles Of Public Sector Employees In The Provision Of Educational Buildings Under A Public Private Partnership (Ppp) In The Republic Of Ireland, Louis Gunnigan, David Eaton
A Critical Appraisal Of The Roles Of Public Sector Employees In The Provision Of Educational Buildings Under A Public Private Partnership (Ppp) In The Republic Of Ireland, Louis Gunnigan, David Eaton
Conference papers
Public-Private Partnership (PPP) has now become established as a key element in the Irish Government’s strategy in the provision of school buildings. Specific guidelines have been implemented to define the public sector role in a PPP in Ireland and these guidelines represent a significant change in role from those in the traditional schools procurement process. Through a literature review, this paper maps the PPP process and establishes the new tasks that public sector employees must carry out in the adoption of PPP. The new knowledge, skills and competence (KSC) required to carry out these tasks are noted. Whilst existing literature …
A Critical Appraisal Of The Roles Of Public Sector Employees In The Provision Of Educational Buildings Under A Public Private Partnership (Ppp) In The Republic Of Ireland, Louis Gunnigan, David Eaton
A Critical Appraisal Of The Roles Of Public Sector Employees In The Provision Of Educational Buildings Under A Public Private Partnership (Ppp) In The Republic Of Ireland, Louis Gunnigan, David Eaton
Conference papers
Public-Private Partnership (PPP) has now become established as a key element in the Irish Government’s strategy in the provision of school buildings. Specific guidelines have been implemented to define the public sector role in a PPP in Ireland and these guidelines represent a significant change in role from those in the traditional schools procurement process. Through a literature review, this paper maps the PPP process and establishes the new tasks that public sector employees must carry out in the adoption of PPP. The new knowledge, skills and competence (KSC) required to carry out these tasks are noted. Whilst existing literature …