Open Access. Powered by Scholars. Published by Universities.®
Construction Engineering and Management Commons™
Open Access. Powered by Scholars. Published by Universities.®
- Discipline
- Keyword
-
- Construction Scheduling Schedule Management Building Information Modeling (BIM) Digital Twins Artificial Intelligence (AI) Lean Construction Organizational Capability Construction Project Management Predictive Scheduling Construction Digital Transformation (2)
- Amazon FBA (1)
- Amazon FBM (1)
- Building ITotal Quality Management (TQM); Industrialized Building Systems (IBS); sustainable project performance; environmental sustainability; waste reduction; energy efficiency; sustainable procurement; digital project management; reverse logistics; PLS-SEM; mixed-methods research.nformation Modeling (BIM); Lean Construction; BIM–Lean Integration; Capability Maturity Model; Socio-Technical Systems; Construction Project Performance; Mixed-Methods Research; Partial Least Squares Structural Equation Modeling (PLS-SEM). (1)
- Building Information Modeling (BIM); Lean Construction; BIM–Lean Integration; Capability Maturity Model; Socio-Technical Systems; Construction Project Performance; Mixed-Methods Research; Partial Least Squares Structural Equation Modeling (PLS-SEM). (1)
-
- Decision Matrix (1)
- Fulfillment (1)
- Integrated Construction Risk Assessment Framework (ICRAF) Construction Risk Assessment Building Information Modeling (BIM) Digital Twins Artificial Intelligence (AI) Lean Construction Monte Carlo Simulation Bayesian Networks Lifecycle Decision Support Construction Project Management (1)
- Integrated Construction Uncertainty Quantification Framework (ICUQF) Construction Risk Management Bayesian Networks Fuzzy Logic Digital Twins Building Information Modeling (BIM) Monte Carlo Simulation Artificial Intelligence Internet of Things (IoT) Lifecycle Decision Support (1)
- Integrated Knowledge Management (IKM); Tacit Knowledge; Explicit Knowledge; Knowledge Transfer; Knowledge Sharing; Knowledge Capture; Knowledge Retrieval; Cross-Project Knowledge Reuse; Lessons Learned; Organizational Learning; Construction Project Management; Knowledge Retention; Construction Industry; Qualitative Evidence Synthesis; Building Information Modeling (BIM). (1)
- Inventory Management (1)
- Product Acquisition (1)
- Project Management (1)
- Shipping Methods (1)
- Supply Chain Management (1)
- Publication
- Publication Type
Articles 1 - 16 of 16
Full-Text Articles in Construction Engineering and Management
Integrating Tacit And Explicit Knowledge Across Construction Projects: A Qualitative Evidence Synthesis Of Knowledge Transfer, Lessons Learned, And Organizational Learning, Felix M. Delmonte
Integrating Tacit And Explicit Knowledge Across Construction Projects: A Qualitative Evidence Synthesis Of Knowledge Transfer, Lessons Learned, And Organizational Learning, Felix M. Delmonte
Mechanical and Civil Engineering Faculty Publications
Abstract
Construction projects rely on knowledge distributed among temporary, multidisciplinary teams, firms, and lifecycle stages. Practical judgment often remains with experienced participants, while written accounts may omit the conditions and reasoning needed for later use. This research examines how construction scholarship explains the movement of project knowledge from capture through sharing and retrieval to reuse on another project. It treats these activities as distinct, and considers tacit expertise alongside explicit records, with attention to who contributes knowledge, who needs it, and where it must travel. The planned approach is a qualitative synthesis of published, peer-reviewed research from 2022–2026. The available …
Multidimensional Total Quality Management And Its Effects On Sustainability And Performance In Industrialized Building System Projects, Felix Delmonte
Multidimensional Total Quality Management And Its Effects On Sustainability And Performance In Industrialized Building System Projects, Felix Delmonte
Mechanical and Civil Engineering Faculty Publications
This study develops and tests a multidimensional total quality management (TQM) framework to explain how distinct quality practices influence environmental sustainability, construction quality, cost and schedule performance, waste reduction, energy efficiency, stakeholder satisfaction, and overall project performance in industrialized building system (IBS) projects. Soft and hard TQM dimensions such as leadership commitment, customer focus, employee involvement, training and continuous improvement, process management, supplier quality, and data driven decision making are operationalised and linked to eight outcome constructs. Partial least squares structural equation modelling (PLS SEM) is used to estimate direct effects and to examine mediation by waste reduction and energy …
Developing And Validating A Socio-Technical Bim-Lean Integration Maturity Model For Predicting Construction Project Performance, Felix Delmonte
Developing And Validating A Socio-Technical Bim-Lean Integration Maturity Model For Predicting Construction Project Performance, Felix Delmonte
Mechanical and Civil Engineering Faculty Publications
This study proposes a socio-technical, multi-level maturity model that integrates BIM and Lean to explain variation in project performance across cost, schedule, productivity, quality, safety, and sustainability, and outlines a sequential mixed-methods design-science programmed for instrument development and validation. Combining systematic review, semi-structured expert interviews, Delphi consensus, exploratory and confirmatory factor analysis, multi-criteria weighting, and PLS-SEM, the approach separates adoption, subsystem capability, and integration maturity, and treats integration as an emergent property of aligned infrastructure, human capability, governance, and continuous-improvement routines. Measurement development emphasizes reflective multi-item constructs for BIM technical capability, Lean production governance, system integration quality, socio-technical alignment, and …
An Integrated Bim, Ipd And Lean Capability Maturity Model For Construction, Felix Delmonte
An Integrated Bim, Ipd And Lean Capability Maturity Model For Construction, Felix Delmonte
Mechanical and Civil Engineering Faculty Publications
This study proposes an integrated BIM–IPD–Lean maturity construct that conceptualizes digital information management, contractual governance, and production system discipline as interdependent socio-technical capabilities and develops a validated measurement architecture to relate this higher order construct to project performance. A mixed methods strategy is described that uses qualitative interviews and expert panels to generate items and maturity level descriptions, followed by pilot testing and rigorous psychometric evaluation (EFA, AVE, Composite Reliability, CFA/PLS-SEM) to establish convergent and discriminant validity for BIM, IPD, and Lean subscales. Hypotheses anticipate a positive association between integrated maturity and quality, time, cost, safety, productivity, sustainability, and stakeholder …
Integrated Construction Uncertainty Quantification Framework Icuqf, Felix Delmonte
Integrated Construction Uncertainty Quantification Framework Icuqf, Felix Delmonte
Mechanical and Civil Engineering Faculty Publications
This study develops ICUQF, an integrated uncertainty framework for digitally instrumented construction megaprojects that unite probabilistic simulation, fuzzy reasoning, Bayesian networks, AI-driven anomaly detection, BIM-linked digital twins, and organizational learning into a single operational architecture. The framework classifies uncertainty into aleatory variability, epistemic gaps, data-centric and model-centric risks, and cognitive or cultural sources, mapping each class to computational treatments such as Monte Carlo engines for stochastic variability, fuzzy intervals and p-boxes for imprecise expert judgments, and hierarchical Bayesian models for coherent evidence aggregation and online updating. ICUQF specifies data pipelines that connect IoT sensing, edge processing, cloud storage, and Common …
Integrated Construction Risk Assessment Framework, Felix Delmonte
Integrated Construction Risk Assessment Framework, Felix Delmonte
Mechanical and Civil Engineering Faculty Publications
An integrated risk assessment architecture for construction projects synthesizes data governance, BIM, Digital Twins, and hybrid analytics into a continuous feedback loop that links sensing, semantic modelling, probabilistic simulation, and organizational learning. The framework distinguishes aleatory from cognitive uncertainty and prescribes layered methods: Monte Carlo and Bayesian updating for measurable variability; fuzzy inference and consensus aggregation for linguistic and expert judgements; and graph-based discovery for dynamic cyber-physical topologies represented as time-varying graphs 𝐺𝑡. Governance primitives, aligned with ISO 19650, enforce provenance, interoperability, and staged readiness thresholds that prevent premature prescriptive outputs until model convergence criteria are met. BIM and GIS …
Scheduling As An Organizational Capability, Felix Delmonte
Scheduling As An Organizational Capability, Felix Delmonte
Mechanical and Civil Engineering Faculty Publications
This study synthesizes evidence on schedule governance as an organizational capability integrating Lean practices, BIM, Digital Twin, and AI to convert scheduling into continuous, data driven decision making that links front line observations to executive risk appetite and funding choices, showing how 4D/5D BIM, clash detection, automated material takeoff, and IoT enabled twins shorten planning horizons, reduce design errors by up to 80%, improve timeline adherence by 20%–30%, and, when AI is applied, further cut delays by about 18% and procurement costs by approximately $2.5 million; a four layer Integrated Lean–Digital Framework is proposed to align strategic intent, collaborative digital …
Amazon Fba Vs Fbm; A Strategic Approach To Determine Which Method Can Effectively Utilize Project Management Principles To Enhance Your Success As A New Amazon Seller., Tiffany Renee White
Amazon Fba Vs Fbm; A Strategic Approach To Determine Which Method Can Effectively Utilize Project Management Principles To Enhance Your Success As A New Amazon Seller., Tiffany Renee White
Theses and Dissertations
Navigating the complexities of a platform such as Amazon demands a strategic approach guided by project management principles. A comparative analysis of Fulfillment by Amazon (FBA) and Fulfillment by Merchant (FBM) methods were completed by focusing on how project management principles optimize product acquisition, supply chain management, and shipping methods for Amazon sellers. The objectives of this study included the identification of top product acquisition tools, the evaluation of inventory management software, assessing shipping methods, and determining the most effective fulfillment process for Amazon seller success. A mixed-methods approach was applied, involving an Amazon seller survey, literature review, data analysis, …
A Step-By-Step Guide To Identify The Most Reliable Inventory Management System For Small Businesses Using Discrete Event Simulation And Pros And Cons Analysis: A Case Study At Camid-Florida Tech, Djalma Batista Oliveira Filho
A Step-By-Step Guide To Identify The Most Reliable Inventory Management System For Small Businesses Using Discrete Event Simulation And Pros And Cons Analysis: A Case Study At Camid-Florida Tech, Djalma Batista Oliveira Filho
Theses and Dissertations
According to the Department of Labor Statistics (2022), 20.6% of small businesses fail in their first year of operation, 42.6% fail after five years, and over 62.6% fail by their tenth year. One factor that can affect continued viability is the lack of knowledge and experience among small and medium-sized firms in inventory management. Despite the fact that inventory control is one of these businesses' most ignored management responsibilities, the expense of procuring inventory often accounts for a considerable portion of their budget. Due to poor inventory management or an inability to appropriately supervise their inventory, small firms may have …
Effects Of Process Parameters On The Dimensional Accuracy Of Fused Deposition Modeled Parts, Ethan Eugene Bair
Effects Of Process Parameters On The Dimensional Accuracy Of Fused Deposition Modeled Parts, Ethan Eugene Bair
Theses and Dissertations
Fused deposition modelling (FDM) is one of the most common additive manufacturing techniques used with applications ranging from rapid prototyping at a professional scale to simple part creation at a hobbyist scale. FDM printing has very little in terms of information based on how accurate printed parts can be. This issue, which is common amongst many different types of additive manufacturing techniques, is something that has not been studied in FDM printed parts in high volumes. Research based on the effects of process parameters on mechanical properties has been conducted in high proportions. This study focused on FDM machines using …
Quantifying Responsiveness In The Vaccine Industry To Evaluate And Improve Pandemic Response, Connor Hill
Quantifying Responsiveness In The Vaccine Industry To Evaluate And Improve Pandemic Response, Connor Hill
Theses and Dissertations
In the wake of the pandemic Severe Acute Respiratory Syndrome Coronavirus 2 (SARS-CoV-2) we can look at many aspects of the global response, including social, scientific, and governmental. Current research in the areas of vaccine development and manufacturing find the process of developing a new vaccine takes an especially long time and is unresponsive. Understanding the factors that influence responsiveness can help organizations be better prepared to address the needs of society should another pandemic strike. Responsiveness can be linked to product, process, and volume. The vaccine development and manufacturing process historically takes years to reach distribution for public use. …
Airport Taxiway Traversal And Safety Optimization Using Combinatorics, Thore Groenlund Rasmussen
Airport Taxiway Traversal And Safety Optimization Using Combinatorics, Thore Groenlund Rasmussen
Theses and Dissertations
The demand for air travel has increased dramatically in the last decade, putting large strain on airports and their limited resources. Expanding the available resources at an airport is not always an option either due to location, budget or time. This forces the administrators of an airport system to use the limited resources as efficiently as possible. This thesis proposes a tool for air traffic controllers and pilots that can be used when planning taxiway systems. Taking inspiration from Dijkstra’s Algorithm, an algorithm is proposed to safely move aircraft from the terminal to the runway. Applying constraints to the algorithm …
Exploratory Analysis Of Accuracy Monitoring Techniques In Vehicle Detection Systems For Intelligent Transportation Systems Applications And Maintenance, Manasi Sanjay Palod
Exploratory Analysis Of Accuracy Monitoring Techniques In Vehicle Detection Systems For Intelligent Transportation Systems Applications And Maintenance, Manasi Sanjay Palod
Theses and Dissertations
The goal of transportation management is to ensure the mobility of people and goods, in a reliable and efficient manner. Operation and maintenance of transportation infrastructure is key to accomplish their objectives. Intelligent Transportation Systems (ITS) applications rely on massive detection networks that collectively demand significant maintenance resources. Resource constraints force transportation agencies to look for innovative ways to optimize their operational and maintenance costs while serving their users at intended performance levels. The system inputs come from vehicle detection system (VDS), acting as field data collection devices, enabling traffic monitoring and management through response to specific conditions. This research …
Simulation Based Cost-Benefit Analysis For The Inspection Of Highway Bridges Using Small Unmanned Aerial Systems, Rashmi Kadamkulangara Balagopalan
Simulation Based Cost-Benefit Analysis For The Inspection Of Highway Bridges Using Small Unmanned Aerial Systems, Rashmi Kadamkulangara Balagopalan
Theses and Dissertations
Visual inspections remain significantly important in surveying the present decay and deterioration status of bridge inspections. These inspections are critical to conduct patch-up remedies and maintenance assignments to guarantee the continued serviceability of structures. Given the high inventory of bridges nationwide (over of 600,000 bridges), increasing costs of bridge inspections are becoming a concern for departments of transportation (DOTs). The conventional inspection method is costly due to various factors. For example, the current approach often requires specialized equipment (e.g., bucket trucks) to conduct underside bridge inspections that significantly affect safety levels on the field and overall costs, and inspectors need …
Extraction Of Phase-Resolved Wave Data From X-Band Radar Imagery, Alexandra Simpson
Extraction Of Phase-Resolved Wave Data From X-Band Radar Imagery, Alexandra Simpson
Link Foundation Ocean Engineering and Instrumentation Fellowship Reports
Typically, phase-resolved measurements of the sea surface are limited to single-point time series from in situ sensors, or arrays of multiple in situ sensors. The deployment of such devices is costly and time intensive, and the wave data they provide is limited in its spatial coverage and directional accuracy. Several remote sensing options, including optical video and X-Band marine radars, offer the possibility of full 2D reconstruction of the phase-resolved directional sea on spatial scales of kilometers. Ocean waves are visible in radar imagery as the ubiquitous backscatter from short wind ripples is modulated by the longer gravity waves. However, …
High-Level Multi-Objective Model For Microgrid Design, Siamak Talebi
High-Level Multi-Objective Model For Microgrid Design, Siamak Talebi
Theses and Dissertations
Recently, there is vast inclination toward using renewable energy in rural areas away from the main electricity generation plants. Small airports located in rural areas are good candidates to apply sustainable energy for electrical power needs. Because of the intermittency of the renewable sources, it is important to have energy storage to guarantee an uninterrupted and stable power supply for end users. In this work, a high-level micro grid model is proposed considering making decisions about different factors such as different renewable sources capacity, storage and system capacity. A multi-objective model of a microgrid high-level design is used to formulate …