Open Access. Powered by Scholars. Published by Universities.®
Civil and Environmental Engineering Commons™
Open Access. Powered by Scholars. Published by Universities.®
- Discipline
-
- Transportation Engineering (2393)
- Environmental Engineering (164)
- Civil Engineering (137)
- Bioresource and Agricultural Engineering (106)
- Geological Engineering (87)
-
- Physical Sciences and Mathematics (73)
- Geotechnical Engineering (41)
- Environmental Sciences (40)
- Construction Engineering and Management (39)
- Hydraulic Engineering (28)
- Earth Sciences (24)
- Structural Engineering (20)
- Chemical Engineering (17)
- Chemistry (17)
- Water Resource Management (16)
- Materials Science and Engineering (15)
- Social and Behavioral Sciences (14)
- Life Sciences (13)
- Environmental Chemistry (12)
- Medicine and Health Sciences (11)
- Environmental Monitoring (9)
- Geology (9)
- Mining Engineering (9)
- Other Civil and Environmental Engineering (9)
- Analytical Chemistry (8)
- Atmospheric Sciences (8)
- Geomorphology (8)
- Hydrology (8)
- Keyword
-
- Engineering (341)
- Kentucky transportation (332)
- Kentucky (164)
- Safety (67)
- Bridges (56)
-
- Highways (39)
- Transportation (36)
- Design (33)
- Statistics (33)
- Accidents (32)
- Earthquake (32)
- Pavement (31)
- Construction (30)
- Durability (30)
- Maintenance (30)
- Alluvium (28)
- Seismic Analyses (28)
- Earthquake Mitigation (27)
- Modified Mercalli Scale (25)
- Safety Belt (25)
- Traffic accidents (24)
- Highway safety (23)
- Concrete (22)
- Bridge (21)
- Crashes (20)
- Evaluation (20)
- Reflectivity (20)
- Skid Resistance (20)
- Steel (20)
- Truck route access (19)
- Publication Year
- Publication
-
- Kentucky Transportation Center Research Report (1820)
- Kentucky's Annual Forum on Transportation (503)
- Theses and Dissertations--Civil Engineering (161)
- Coal Combustion and Gasification Products Journal Archive (85)
- Kentucky Transportation Center Presentations (50)
-
- Civil Engineering Faculty Publications (37)
- Theses and Dissertations--Biosystems and Agricultural Engineering (22)
- Chemistry Faculty Publications (14)
- Kentucky Transportation Center Faculty and Researcher Publications (14)
- University of Kentucky Doctoral Dissertations (13)
- Civil Engineering Faculty Patents (9)
- Theses and Dissertations--Mining Engineering (8)
- Kentucky Transportation Center Technical Assistance Report (7)
- KWRRI Research Reports (5)
- Theses and Dissertations--Chemical and Materials Engineering (4)
- Theses and Dissertations--Earth and Environmental Sciences (4)
- University of Kentucky Master's Theses (4)
- Markey Cancer Center Faculty Publications (3)
- Progress in Scale Modeling, an International Journal (3)
- Theses and Dissertations--Computer Science (3)
- Theses and Dissertations--Mechanical and Aerospace Engineering (3)
- Biosystems and Agricultural Engineering Faculty Publications (2)
- Center for Applied Energy Research Faculty and Staff Publications (2)
- Civil Engineering Research Data (2)
- Earth and Environmental Sciences Faculty Publications (2)
- Earth and Environmental Sciences Research Data (2)
- Information Science Faculty Publications (2)
- Plant and Soil Sciences Faculty Publications (2)
- UK CARES Faculty Publications (2)
- Architecture Faculty Publications (1)
- Publication Type
- File Type
Articles 1201 - 1230 of 2796
Full-Text Articles in Civil and Environmental Engineering
Truck Route Access Evaluation: Paradise Power Plant, Muhlenberg County, Site #1113, Kenneth R. Agent, Brian Aldridge, Lisa Aultman-Hall, David Cain, Nicole Lefever, Nikiforos Stamatiadis, Joel M. Weber
Truck Route Access Evaluation: Paradise Power Plant, Muhlenberg County, Site #1113, Kenneth R. Agent, Brian Aldridge, Lisa Aultman-Hall, David Cain, Nicole Lefever, Nikiforos Stamatiadis, Joel M. Weber
Kentucky Transportation Center Research Report
The Freight Movement and Intermodal Access in Kentucky Study (SPR 98-189) is being conducted on behalf of the Kentucky Transportation Cabinet (KYTC). There are two major objectives of the study: evaluation of the access for trucks between intermodal or other truck generating sites and the National Highway System (NHS); and furthering the understanding of freight commodity flows throughout the state. This report summarizes the access evaluation for The Paradise Power Plant facility located in Muhlenberg County in the Pennyrile Area Development District (ADD) and KYTC Highway District # 2. The location of the site is shown in Figure 1. Work …
Truck Route Access Evaluation: Kenmor Stone And Ruth Brothers Quany, Olive Hill, Site #2620, Joel Weber, Kenneth R. Agent, Brian Aldridge, Lisa Aultman-Hall, David Cain, Nicole Lefever, Nick Stamatiadis
Truck Route Access Evaluation: Kenmor Stone And Ruth Brothers Quany, Olive Hill, Site #2620, Joel Weber, Kenneth R. Agent, Brian Aldridge, Lisa Aultman-Hall, David Cain, Nicole Lefever, Nick Stamatiadis
Kentucky Transportation Center Research Report
This is a study undertaken on behalf of the Kentucky Transportation Cabinet (KYTC). There are two main objectives of the Freight Movement and Intermodal Access in Kentucky Study (SPR 98-189): evaluation of the access for trucks between intermodal or other truck generating sites and the National Highway System (NHS); and furthering the understanding of freight commodity flows throughout the state. This report summarizes the access evaluation for Kenmor Stone and Ruth Brothers Quarry located in Carter county in the FIVCO Area Development District (ADD) and KYTC Highway District #9. The location of the sites is shown in Figure 1. Work …
Field Performance Report On 1219 Mm Hdpe Pipe On Us 127, Owen County, L. John Fleckenstein, David L. Allen
Field Performance Report On 1219 Mm Hdpe Pipe On Us 127, Owen County, L. John Fleckenstein, David L. Allen
Kentucky Transportation Center Research Report
This report documents the installation and performance of a 1219 mm (48-inch) corrugated smooth lined polyethylene (HDPE) pipe installed during reconstruction of US 127 in Owen County. The pipe installed was manufactured by Advanced Drainage Systems, Inc., and is designated as ADS N-12. pipe.
The culvert was installed in a 6-meter (20-foot) high embankment. The culvert pipe was installed in two sequences. The first half of the structure was bedded and backfilled with No. 8 stone and the second half of the structure was bedded and backfilled with pipe sand (crushed limestone).
The pipe appears to be performing well. The …
Experimental Analysis And Analytical Modeling Of Bridges With And Without Diaphragms, James J. Griffin, Issam E. Harik, David L. Allen
Experimental Analysis And Analytical Modeling Of Bridges With And Without Diaphragms, James J. Griffin, Issam E. Harik, David L. Allen
Kentucky Transportation Center Research Report
Two prestressed concrete (P/C) I-girder bridges along the coal haul route system of Southeastern Kentucky were constructed with a 50 degree skew angle. One of the bridges has concrete intermediate diaphragms, while the other bridge has no intermediate diaphragms. Bridges of similar design along coal haul routes have experienced unusual concrete spalling at the interface of the diaphragms and the bottom flange of the girders. The purpose of this report is to identify the cause of the damage, and to evaluate the effectiveness of intermediate diaphragms.
Experimental static and dynamic field testing was conducted on both bridges. All field tests …
A Methodology For Evaluating Large Truck Access To Intermodal And Other Facilities, Lisa Aultman-Hall, Michael Hill, Kenneth R. Agent
A Methodology For Evaluating Large Truck Access To Intermodal And Other Facilities, Lisa Aultman-Hall, Michael Hill, Kenneth R. Agent
Kentucky Transportation Center Research Report
In a recent project for the Kentucky Transportation Cabinet (KYTC), researchers were tasked with developing a method to objectively evaluate the access for large trucks between intermodal or other truck traffic generating sites and the National Highway System (NHS). The routes evaluated were the actual roadway segments used by large volumes of trucks traveling between the intermodal or other facilities and the NHS. This choice to evaluate specific heavily used roadway segments, as opposed to evaluating an entire highway or roadway corridor was based on the recommendation of the state-wide Intermodal Advisory Panel which advised the Cabinet on intermodal issues. …
Evaluation Of Condition-Responsive Work Zone Traffic Controls At The I-75 Clays Ferry Bridge, Jerry G. Pigman, Kenneth R. Agent, Joel Weber
Evaluation Of Condition-Responsive Work Zone Traffic Controls At The I-75 Clays Ferry Bridge, Jerry G. Pigman, Kenneth R. Agent, Joel Weber
Kentucky Transportation Center Research Report
The objective of this study was to document the effectiveness of the application of advanced technologies for the real-time control and management of traffic in the work zone at the I 75 Clays Ferry Bridge reconstruction project. A description is given for each of the condition-responsive traffic control devices used on the project. A summary of the usage of each system is given along with a rating of its performance and effectiveness. The evaluation includes an analysis of accident data in the vicinity of the Clays Ferry Bridge for the period of January 1990 through June 1997. The possibility of …
Evaluation Of Kentucky's Driver License Point System, Kenneth R. Agent, Nick Stamatiadis, Jerry G. Pigman
Evaluation Of Kentucky's Driver License Point System, Kenneth R. Agent, Nick Stamatiadis, Jerry G. Pigman
Kentucky Transportation Center Research Report
The objectives of this study were to: a) summarize the characteristics of drivers in Kentucky involved in traffic crashes and b) evaluate and recommend improvements to Kentucky's driver license point system. Comparisons of driving record were made by driver age and sex. The relationship between violations and traffic crashes was analyzed. The change in driving record after various interventions was investigated. Based on a review of the point systems used in other states and the analysis of the driver's license file, a revised point system was recommended for use in Kentucky.
Intelligent Transportation Systems Strategic Plan (Phase I Report), Joseph D. Crabtree, Ted H. Grossardt, Donald G. Hartman, Jerry G. Pigman, Jennifer R. Walton, Joel M. Weber, Study Advisory Committee
Intelligent Transportation Systems Strategic Plan (Phase I Report), Joseph D. Crabtree, Ted H. Grossardt, Donald G. Hartman, Jerry G. Pigman, Jennifer R. Walton, Joel M. Weber, Study Advisory Committee
Kentucky Transportation Center Research Report
This interim report on an Intelligent Transportation Systems Strategic (ITS) Plan has been developed as documentation of the process of offering a vision for ITS and recommending an outline for organizational structure, infrastructure, and long-term planning for ITS in Kentucky. This plan provides an overview of the broad scope of ITS and relationships between various Intelligent Vehicle Highway Systems (IVHS) functional areas and ITS user service areas. Three of the functional areas of ITS have been addressed in this interim report with sections devoted to mission, vision, goals, and potential technology applications. Within each of the three areas, recommendations have …
Seismic Isolation Of A Highly Skewed, Prestressed Concrete Girder Bridge, Bradley Neil Robson, Issam E. Harik, David L. Allen
Seismic Isolation Of A Highly Skewed, Prestressed Concrete Girder Bridge, Bradley Neil Robson, Issam E. Harik, David L. Allen
Kentucky Transportation Center Research Report
A relatively new approach for designing or retrofitting highway bridges in seismic zones involves isolating the superstructure from the substructure. Through experimental and analytical investigations, this study evaluates the effectiveness of isolating one particular bridge: a highly skewed, prestressed concrete, slab-on-girder bridge. Dynamic testing of the bridge was performed using the pullback, quick-release method. A three dimensional finite element model of the bridge was created. It was refined, or calibrated, to match experimentally determined natural frequencies and mode shapes. Time-history analyzes, using site-specific acceleration records, were conducted for the seismically isolated bridge model and an identical, non-isolated bridge model.
For …
Evaluation Of Corrugated Steel Pipe Culverts On Ky 61, Cumberland County, L. John Fleckenstein, David L. Allen, Brad W. Rister
Evaluation Of Corrugated Steel Pipe Culverts On Ky 61, Cumberland County, L. John Fleckenstein, David L. Allen, Brad W. Rister
Kentucky Transportation Center Research Report
In February of 1998, the Kentucky Transportation Cabinet requested that the Kentucky Transportation Center investigate three corrugated metal pipe culverts on the relocation project of KY 61. The pipes were installed in June and July of 1997. The embankments over the three pipes were completed In October of 1997. Based on the information that was gathered, it appears that the pipes were manufactured according to specifications. The gage of the pipe is on the lower end of acceptance. The pipes appear to have been well aligned and properly bedded. Some of the dents and buckles in the pipe may have …
A Report On County Road Program Finance, Patsy Anderson, Kris Koehler
A Report On County Road Program Finance, Patsy Anderson, Kris Koehler
Kentucky Transportation Center Research Report
This report reflects the findings of a study of county road finance in Kentucky. Statistics contained in the report were derived from financial statements submitted by the counties to the Kentucky Department of Local Government.
Investigation And Analysis Of Heavy Truck Accidents, Jerry G. Pigman, Kenneth R. Agent
Investigation And Analysis Of Heavy Truck Accidents, Jerry G. Pigman, Kenneth R. Agent
Kentucky Transportation Center Research Report
The objectives of this study were to investigate and analyze traffic accidents involving trucks and to study the relationship between heavy loads and truck braking efficiency. Field tests were made to determine the effect of increased loads on the ability of a truck to brake to a stop and determine if the trucks could meet the requirements of the Federal Motor Carrier Safety Regulations. The test combination truck with a gross weight of up to 151,180 was able to meet both braking distance and maximum G requirements. The test single-unit truck failed to meet requirements only at the maximum weight …
Performance Evaluation Of Recycled Pcc Pavement Used As A Crushed Stone Base And Dense Grade Aggregate, Mike Shull, David L. Allen, L. John Fleckenstein, Clark Graves, David Q. Hunsucker
Performance Evaluation Of Recycled Pcc Pavement Used As A Crushed Stone Base And Dense Grade Aggregate, Mike Shull, David L. Allen, L. John Fleckenstein, Clark Graves, David Q. Hunsucker
Kentucky Transportation Center Research Report
Kentucky Highway Investigative Task No. 24, "Recycled Concrete Pavement", (SSP-059-7965) involved the use of Recycled/Crushed Portland Cement Concrete (RPCC) for use as Crushed Stone Base (CSB) on the Thomas More Parkway in Kenton County, Kentucky. The Parkway, which connects Dudley Road to South Loop Road in front of the Thomas More College campus, was the first roadway to be built in Kentucky using recycled Portland Cement Concrete for crushed stone base. The Kentucky Transportation Center was requested to evaluate the material's performance versus the normal limestone CSB and make appropriate recommendations. Both field and laboratory testing were required, along with …
Evaluations Of Wall Structures In Kentucky (Kyspr-85-107), L. John Fleckenstein, Brad W. Rister, David L. Allen
Evaluations Of Wall Structures In Kentucky (Kyspr-85-107), L. John Fleckenstein, Brad W. Rister, David L. Allen
Kentucky Transportation Center Research Report
Approximately 209 retaining wall structures were visually evaluated under this study for long-term performance. The inspection included concrete crib, single-barrel and double-barrel culvert wing, metal bin, Gabion, rigid concrete, Keystone block, tiedback, mechanically stabilized earth (M.S.E.), Tech Wall, and sound walls. Significant structural distress was observed in several of the wall systems. This report discusses the performance of each wall system and makes recommendations on the future use of these systems.
Survey And Visual Inspection Of Keystone Block Wall And Embankment Slide At Mist Lake Plaza In Lexington, Kentucky, L. John Fleckenstein, David L. Allen
Survey And Visual Inspection Of Keystone Block Wall And Embankment Slide At Mist Lake Plaza In Lexington, Kentucky, L. John Fleckenstein, David L. Allen
Kentucky Transportation Center Research Report
The Kentucky Transportation Center was requested by Bhate Engineering Corporation and A.B. Shopping Center Properties, Inc. to evaluate and monitor apparent movement in the Keystone Block retaining structure and the earth embankment located next to the Walmart Department Store at Mist Lake Plaza in Lexington, Kentucky. In June 1997, a report (KTC-97-11) was submitted which summarized work that had been conducted prior to June of 1997. The initial report included results of the inspection of the surface drainage, inspection of subsurface storm water drainage, inspection of the embankment, and inspection and photo-logging of visible wall distress. In June 1997, several …
Use Of Hydrated Lime Byproduct For Stabilization Of Subgrade Soils, Tony L. Beckham, Tommy C. Hopkins
Use Of Hydrated Lime Byproduct For Stabilization Of Subgrade Soils, Tony L. Beckham, Tommy C. Hopkins
Kentucky Transportation Center Research Report
In January 1998, Minteck Resources requested that the Kentucky Transportation Center at the University of Kentucky perform a feasibility study to determine if a hydrated lime byproduct produced at the Carbide/Graphite facility in Calvet City, Kentucky can be used as a substitute for hydrated lime as a soil subgrade stabilizing agent. According to personnel of Carbide/Graphite Group, Incorporated, the byproduct contains a high percentage of hydrated lime.
Kentucky Traffic Accident Facts 1998 Report, Kentucky Transportation Center, Kentucky State Police
Kentucky Traffic Accident Facts 1998 Report, Kentucky Transportation Center, Kentucky State Police
Kentucky Transportation Center Research Report
KENTUCKY’S TRAFFIC ACCIDENT FACTS report for 1998 is based on accident reports submitted to the Accident Unit housed in the Kentucky State Police Information Services Branch, Records Section. As required by Kentucky Revised statutes 189.635, “every law enforcement agency whose officers investigate a vehicle accident of which a report must be made...shall file a report of the accident...within ten days after investigation of the accident upon forms supplied by the bureau.” The stated purpose of this requirement is to utilize date on traffic accidents” for such purposes as will improve the traffic safety program in the Commonwealth.” Data contained in …
1998 Highway Cost Allocation Update: Technical Report, Samantha S. Jones, Jerry G. Pigman
1998 Highway Cost Allocation Update: Technical Report, Samantha S. Jones, Jerry G. Pigman
Kentucky Transportation Center Research Report
This update of the highway cost allocation study is the eighth in a recent series begun in the early 1980's by the Kentucky Transportation Cabinet and the Kentucky Transportation Center. The primary objectives were to determine the level of revenue contribution and cost responsibility for each class of highway user. The base year of the study is FY 97; the most recent time period for which revenue and cost data were available. Highway user or travel activity for calender year 1996 was the most recent available. A basic premise of the study was that only state maintained highways were of …
Truck Route Access Evaluation: Medusa Aggregates, Warren County, Site #2628, Brian Aldridge, Kenneth R. Agent, Lisa Aultman-Hall, David Cain, Nikiforos Stamatiadis, Joel M. Weber
Truck Route Access Evaluation: Medusa Aggregates, Warren County, Site #2628, Brian Aldridge, Kenneth R. Agent, Lisa Aultman-Hall, David Cain, Nikiforos Stamatiadis, Joel M. Weber
Kentucky Transportation Center Research Report
The Freight Movement and Intermodal Access in Kentucky Study (SPR 98-189), undertaken by the Kentucky Transportation Center (KTC) on behalf of the Kentucky Transportation Cabinet (KYTC), has two main objectives. These objectives include the evaluation of access for trucks between intermodal or other truck generating sites and the National Highway System (NHS) and furthering the understanding of freight commodity flows throughout the state. This report summarizes the access evaluation for one facility located in Warren County in the Barren River Area Development District (ADD) and KYTC Highway District #3. The location of the site is shown in Figure 1 while …
Embankment Construction Using Shale, Tommy C. Hopkins, Tony L. Beckham
Embankment Construction Using Shale, Tommy C. Hopkins, Tony L. Beckham
Kentucky Transportation Center Research Report
Shales have been used extensively in the construction of highway embankments, and other earthen structures, because of the vast amounts of these materials located in many areas of the country and the lack of economical and alternate available materials. Because shales exhibit a wide range of engineering properties and behaviors, many problems have occurred. Numerous shale embankment failures have occurred generally some 1 to 10 years after construction. Settlements of 1 to 3 feet (0.3 - 0.9 m) have been observed in many old embankments and required numerous asphaltic overlays. Shale embankments that settle continuously have been observed to fail …
Truck Route Access Evaluation: Fulton County, Hickman Riverport Area, Site No. 16, Lisa Aultman-Hall, Kenneth R. Agent, Brian Aldridge, David Cain, Nikiforos Stamatiadis, Joel M. Weber
Truck Route Access Evaluation: Fulton County, Hickman Riverport Area, Site No. 16, Lisa Aultman-Hall, Kenneth R. Agent, Brian Aldridge, David Cain, Nikiforos Stamatiadis, Joel M. Weber
Kentucky Transportation Center Research Report
There are two main objectives of the Freight Movement and Intermodal Access in Kentucky Study (SPR 98-189) that is being undertaken by the Kentucky Transportation Center for the Kentucky Transportation Cabinet (KYTC): 1) evaluation of the access for trucks between intermodal or other truck generating sites and the National Highway System (NHS); and 2) furthering the understanding of freight commodity flows throughout the state. This report summarizes the access evaluation for one cluster of facilities located in Fulton county in the Purchase Area Development District (ADD) and KYTC Highway District #1. The location of the site in the town of …
Evaluation Of The Et2000 Guardrail End Treatment, Kenneth R. Agent, Jerry G. Pigman, Darrell Mcalister, Tim Gatewood
Evaluation Of The Et2000 Guardrail End Treatment, Kenneth R. Agent, Jerry G. Pigman, Darrell Mcalister, Tim Gatewood
Kentucky Transportation Center Research Report
The objectives of this study were to monitor and report the performance of the ET2000 guardrail end treatment design in traffic accidents. Data for a total of 34 collisions involving the ET2000 were identified. In most cases, an accident report was obtained and the damaged guardrail was inspected. The involved vehicle was inspected when available. Proper or improper performance of end treatments in the collisions were judged based on whether it performed as designed.
Field performance of the ET2000, as documented in traffic accidents, shows that, considering all the impacts, this end treatment has performed properly. In several instances the …
Evaluation Of Road Weather Information System: Interim Report, Joel M. Weber, R. Clark Graves, Jerry G. Pigman
Evaluation Of Road Weather Information System: Interim Report, Joel M. Weber, R. Clark Graves, Jerry G. Pigman
Kentucky Transportation Center Research Report
The objectives of this study are to monitor and evaluate the Roadway Weather Information System (RWIS). Six RWIS sites have been installed at locations selected by the Kentucky Department of Highways. Each site includes sensors which measure temperature, precipitation, relative humidity, wind speed, pavement temperature, surface condition, and chemical concentration. The data can be accessed remotely using a Windows-based software program. The data are also stored in a central database for future use.
A preliminary reliability study has been completed for five of the sites, and data are being collected for a more extensive reliability assessment. The accuracy of the …
Annual Assessment Of Customer Needs And Satisfaction, Patsy Anderson, Kris Hockensmith
Annual Assessment Of Customer Needs And Satisfaction, Patsy Anderson, Kris Hockensmith
Kentucky Transportation Center Research Report
The Kentucky Transportation Cabinet, both through its own quality initiative and a statewide "Empower Kentucky" campaign, has a commitment to achieve new levels of quality in the development, construction and maintenance of highways. In order to gage progress, there is a need to establish a baseline of customer satisfaction with the current highway system, and determine needs as perceived by the users of the highway system. As a result, the University of Kentucky Transportation Center, Technology Exchange Unit, was contracted to conduct a customer needs and satisfaction survey. The objectives of this study are to:
A. Ascertain Kentucky highway users' …
Kentucky Transportation Cabinet: Annual Assessment Of Customer Needs And Satisfaction: Mail Survey, Patsy Anderson, Kris Hockensmith
Kentucky Transportation Cabinet: Annual Assessment Of Customer Needs And Satisfaction: Mail Survey, Patsy Anderson, Kris Hockensmith
Kentucky Transportation Center Research Report
The Kentucky Transportation Cabinet, both through its own quality initiative and a statewide "Empower Kentucky" campaign, has a commitment to achieve new levels of quality in the development, construction and maintenance of highways. In order to gage progress, there is a need to establish a baseline of customer satisfaction with the current highway system, and determine needs as, perceived by the users of the highway system. As a result, the University of Kentucky Transportation Center, Technology Exchange Unit, was contracted to conduct a customer needs and satisfaction survey. The objectives of this study are to:
A. Ascertain Kentucky highway users' …
Roadway Incident Emergency Response: Workshop Summary And Detour Maps, Jerry G. Pigman, Kenneth R. Agent, David H. Cain
Roadway Incident Emergency Response: Workshop Summary And Detour Maps, Jerry G. Pigman, Kenneth R. Agent, David H. Cain
Kentucky Transportation Center Research Report
Delays associated with incidents and accidents on heavily traveled highways have been recognized as a major inconvenience and a burden on the driving public. Heavy traffic volumes on interstates in Kentucky result in significantly increased probability for delay occurrences. When there is an occurrence which disrupts traffic, the adverse effects are widespread. High volumes of trucks use the north-south corridors in the state and delays can produce significant costs to both shippers and users of products being shipped.
Many efforts are underway to address the problems associated with congestion; including improved traffic management techniques and applications of advanced technology. A …
Stabilization Of Subgrade Soil Using Hydrated Lime Product, Tony L. Beckham, Tommy C. Hopkins
Stabilization Of Subgrade Soil Using Hydrated Lime Product, Tony L. Beckham, Tommy C. Hopkins
Kentucky Transportation Center Research Report
The Carbide/Graphite Group Inc. requested the University of Kentucky, Kentucky Transportation Center to do a feasibility study to determine if a hydrated lime product produced at their Calvet City, Kentucky facility can be used as a soil subgrade stabilizing agent.
Analysis Of Traffic Accident Data In Kentucky (1992 - 1996), Kenneth R. Agent, Jerry G. Pigman
Analysis Of Traffic Accident Data In Kentucky (1992 - 1996), Kenneth R. Agent, Jerry G. Pigman
Kentucky Transportation Center Research Report
This report includes an analysis of traffic accident data in Kentucky for the years of 1992 through 1996. A primary objective of this study was to determine average accident statistics for Kentucky highways. Average and critical numbers and rates of accidents were calculated for various types of highways in rural and urban areas. These data can be used in Kentucky's procedure to identify locations that have abnormal rates or numbers of accidents.
The other primary objective of this study was to provide data which can be used in the preparation of the problem identification portion of Kentucky's Annual Highway Safety …
Stabilization Of An Airport Subgrade Using Hydrated Lime And Fly Ash, Tony L. Beckham, Tommy C. Hopkins
Stabilization Of An Airport Subgrade Using Hydrated Lime And Fly Ash, Tony L. Beckham, Tommy C. Hopkins
Kentucky Transportation Center Research Report
A 457-m (1,500-ft) runway pavement extension is planned for the Georgetown-Scott County Airport (Marshall Field). The clay subgrade of the existing paved runway was stabilized with six percent (dry weight) hydrated lime. A request was made by the Kentucky Transportation Cabinet, Division of Aeronautics, to determine the feasibility of replacing a percentage of the hydrated lime stabilizer with fly ash for the extended runway subgrade. Kentucky Highway Investigative Task No. 27 was issued by the Transportation Cabinet to fund a laboratory study to determine the effects of partially replacing lime with Type F fly ash (FA). Using fly ash to …
1997 Safety Belt Usage Survey And Evaluation Of Effectiveness In Kentucky, Kenneth R. Agent
1997 Safety Belt Usage Survey And Evaluation Of Effectiveness In Kentucky, Kenneth R. Agent
Kentucky Transportation Center Research Report
The objective of this study was to establish 1997 safety belt and child safety seat usage rates in Kentucky. The 1997 survey documents the continuing results from enacting a statewide mandatory safety belt law in 1994. Data were collected at 100 sites and combined based on vehicle miles traveled for a given type of highway, rural or urban location, and county population category. Also included in the report is an analysis of accident records evaluating the effectiveness of safety belts.
The data show that the usage rate has stabilized at a level slightly below the high value which occurred in …