Open Access. Powered by Scholars. Published by Universities.®

Management and Operations Commons

Open Access. Powered by Scholars. Published by Universities.®

Theses and Dissertations

Discipline
Institution
Keyword
Publication Year

Articles 121 - 138 of 138

Full-Text Articles in Management and Operations

A Model-Based Methodology For Evaluating The Unit-Level Air Combat Mission Planning (Acmp) Process, Thomas L. Gaylord, George L. Sowell Sep 1992

A Model-Based Methodology For Evaluating The Unit-Level Air Combat Mission Planning (Acmp) Process, Thomas L. Gaylord, George L. Sowell

Theses and Dissertations

This study modeled the USAF unit-level Air Combat Mission Planning (ACMP) process and developed a methodology for evaluating the effectiveness of changes to the process. The study also reports relevant mission planning lessons learned from Desert Storm and demonstrates application of the developed evaluation methodology. An exploratory multidisciplinary literature review builds a research foundation for the evaluation methodology. Foundation areas reviewed include unit-level operations, command and control, planning, decision theory, decision aiding, and model-based problem solving. The conceptual model of the planning process defines sixteen functions starting from receipt of tasking and concluding with execution departure. For each of the …


Estimating The Operating And Support Cost Difference Between Royal Australian Air Force C-130e And C-130h Hercules Aircraft, Terrence J. Sidey Sep 1992

Estimating The Operating And Support Cost Difference Between Royal Australian Air Force C-130e And C-130h Hercules Aircraft, Terrence J. Sidey

Theses and Dissertations

This research investigated the operating and support cost (O & S cost) of Royal Australian Air Force (RAAF) C-130E and C-130H aircraft. The purpose was twofold: to provide information about the relative O & S cost of the RAAF's old and "new" C-130 aircraft; and to increase knowledge and understanding of aircraft O & S costing within the RAAF. Preliminary research indicated that RAAF O & S costing was rudimentary and that suitable O & S data would be difficult to obtain. Accordingly, an analogous O & S cost system -- the U.S. Air Force (USAF) SABLE cost model and …


The Development Of A Performance Measurement Concept For The Royal Australian Air Force, David R. Mcdonald Sep 1992

The Development Of A Performance Measurement Concept For The Royal Australian Air Force, David R. Mcdonald

Theses and Dissertations

he Royal Australian Air Force (RAAF) needed to develop performance measurements (PMs) to support its Program Management and Budgeting (PMB) System. This research assessed the use of the concepts of the Theory of Constraints (TOC) to develop those PMs. The literature indicated that: traditional accounting PMs were not always suitable in an environment of continuous improvement; Activity Based Costing did not provide the required measures; and non-financial PMs were supplanting the older measures. Further, governments faced unique problems in developing PMs, particularly in defining the outcomes to be measured. Using the Critical Theory and Action Research methodologies, and a case …


An Outline For A Manufacturing Planning And Control System For A Repair/ Overhaul/Rebuilding Environment, Peter H. Miyares Mar 1992

An Outline For A Manufacturing Planning And Control System For A Repair/ Overhaul/Rebuilding Environment, Peter H. Miyares

Theses and Dissertations

This study outlines a structure for a manufacturing planning and control (MPC) system for a repair/overhaul/rebuilding environment. Included an examination of the organizational components that must be incorporated into the system and the planning functions for which the system can be used. The study compares and contrasts the differences between an MPC system for a maintenance organization and a manufacturing organization and concludes that the MPC system for a maintenance organization must account for the greater degree of variability that occurs within the process. The proposed system is composed of an information system which collects data from throughout an organization …


Structured Hypermedia Application Development Model (Shadm): A Structured Model For Technical Documentation Application Design, Peter W. Cassell Dec 1991

Structured Hypermedia Application Development Model (Shadm): A Structured Model For Technical Documentation Application Design, Peter W. Cassell

Theses and Dissertations

This research was conducted to determine how a Royal Australian Air Force technical maintenance publication could be transformed into a task oriented hypermedia application and to develop a model that could be used for future similar transformations. The model was developed following in-depth analysis of the existing USAF F-15E maintenance publication set and validation was conducted using a prototype developed in HyperWriter, a commercial hypermedia product. The prototype model was based around the performance of three maintenance tasks on an aircraft sub-subsystem and incorporated online user access to the necessary support data for task completion. Publication managers, producers, and users …


An Analysis Of The Information Requirements Of Conus Based Deputy Commanders For Maintenance, Daniel J. Green Dec 1991

An Analysis Of The Information Requirements Of Conus Based Deputy Commanders For Maintenance, Daniel J. Green

Theses and Dissertations

The purpose of this research was to identify the information requirements of Air Force Deputy Commanders for Maintenance. It had three basic objectives: (1) identify the critical success factors that they monitor on a continuous basis, (2) identify similarities in those requirements for all DGMs and across major commands, and (3) determine if the application of information technology would enhance their decision making. Surveys were sent to all CONUS based Deputy Commanders for Maintenance. The study found that there were nine critical success factors that were used by a majority of all respondents. In addition, nine command-specific critical success factors …


An Investigation Of Project Management Techniques For Scheduling Raaf Depot Level Maintenance, Kerry M. Bayley Sep 1991

An Investigation Of Project Management Techniques For Scheduling Raaf Depot Level Maintenance, Kerry M. Bayley

Theses and Dissertations

This research investigates scheduling performances of commercial project management software. It is based on difficulties that the Royal Australian Air Force experienced in evaluating microcomputer-based packages in maintenance task scheduling of aircraft undergoing Depot Level Maintenance. A literature review found only one paper quantifying commercial software performances. No standard performance metrics or test data were found. Several packages were evaluated using a common set of 110 single-project resource- constrained networks. The performance measure used was closeness to optimally minimum Total Durations. No package performed best on all problems. On average, the best produced schedules 5.2% longer than optimal, with 95 …


An Evaluation Of Logistics Support For F-16 Aircraft Owned By Foreign Countries, Paul J. Lyons Sep 1991

An Evaluation Of Logistics Support For F-16 Aircraft Owned By Foreign Countries, Paul J. Lyons

Theses and Dissertations

The purpose of this thesis was to examine the logistics support provided by the United States Air Force (USAF) for F-16 aircraft owned by foreign countries. The research drew from historical trends and personal experiences to examine the ability of the U.S. to provide logistics support for F-16 aircraft owned by U.S. allies. The study found that timely, efficient support of FMS customers possessing F-16 aircraft does not appear to be a principal concern of the USAF logistics system. Complexity of processes, untimely responses, and failure to consider customer needs are common failings on the part of the USAF.


Study On In-Theater Maintenance Support For Poaf F-16, Rui J. Gomes Sep 1991

Study On In-Theater Maintenance Support For Poaf F-16, Rui J. Gomes

Theses and Dissertations

The purpose of this study was to evaluate the capacity to generate a desired level of sorties of the F-16 weapon system. This capacity depends on the maintenance concept and structure, that defines a specific level of in-theater resources available. The theater is intended to reflect Portuguese Air Force logistic operations planned for the F-16, with one operational base and a possible Centralized Intermediate Repair Facility (CIRF), not co-located. The TSAR simulation program and one USAF database was used to perform the evaluation were defined and compared. The study focused on the unscheduled maintenance tasks and repairable items, in particular …


Challenges To United States Tactical Air Force Aircraft Maintenance Personnel: Past, Present And Future, Barbara L. Harris Sep 1991

Challenges To United States Tactical Air Force Aircraft Maintenance Personnel: Past, Present And Future, Barbara L. Harris

Theses and Dissertations

This study assessed the challenges Tactical Air Force (TAF) aircraft maintenance personnel face as a result of the TAF reorganization. The goal was to provide aircraft maintenance managers a basis for evaluating and meeting those challenges. To accomplish this, emphasis was placed on documenting the concepts, events, and conditions which led to changes in military aircraft maintenance from the birth of aviation to the present. Current issues such as the proposed move to two-level maintenance and the formation of the TAF composite and Objective Wings were also addressed. Research was conducted through the review of available historical documents, complemented by …


Inaccurate Data Entry Into The Air Force Maintenance Data Collection System, Jon R. Determan Sep 1991

Inaccurate Data Entry Into The Air Force Maintenance Data Collection System, Jon R. Determan

Theses and Dissertations

This research investigated the data collection environment under the Core Automated Maintenance System (CAMS), a computerized information system used in the Air Force's aircraft maintenance complexes. The research measured maintenance personnel's perception of the nature, extent, and causes of data inaccuracies occurring in the CAMS data collection environment. The nature was differentiated as being either intentional or accidental. Maintenance personnel felt that difficulty in entering information into CAMS accounted for the largest percentage of intentional errors and that insufficient training on CAMS accounted for the largest percentage of accidental errors. A comparison of this research to the results of earlier …


An Evaluation Of The Implementation Of Two-Levels Of Maintenance At Strategic Air Command Intercontinental Ballistic Missile Bases, Alan H. Russell Sep 1991

An Evaluation Of The Implementation Of Two-Levels Of Maintenance At Strategic Air Command Intercontinental Ballistic Missile Bases, Alan H. Russell

Theses and Dissertations

As a result of the 1979 Defense Management Review, Headquarters, Strategic Air Command has initiated programs of alternative levels of maintenance in order to trim excess costs. This study investigates the suitability of the SAC program which changed selected base-level strategic missile maintenance tasks from three to two-levels of maintenance. Using an opinion oriented questionnaire, this research surveyed a sample of missile maintenance personnel on their perceptions of the SAC program which implemented an alternative to intermediate-level maintenance. Analysis of survey results show respondents tended to believe the SAC program has not added benefit to their mission effectiveness. Other studies …


Efficient Aircrew Scheduling In An Operational Test And Evaluation Organization, Charles P. Modrich Sep 1991

Efficient Aircrew Scheduling In An Operational Test And Evaluation Organization, Charles P. Modrich

Theses and Dissertations

The original intent of this research was to locate or develop tools which would improve the efficiency of the aircrew scheduling process in the 4950 Test Wing. However, late in the research it became apparent that several factors observed by the researcher complicate the implementation of more efficient methods. Therefore, the focus of the research became the documentation of those factors. A case study methodology was used in answering the investigative questions. This was an exploratory study conducted in a field setting environment. Direct observation and the use of structural interviews with scheduling personnel were the methods of data collection. …


An Analysis Of Total Quality Management In Aeronautical Systems Division, Mark D. Caudle Sep 1991

An Analysis Of Total Quality Management In Aeronautical Systems Division, Mark D. Caudle

Theses and Dissertations

This study investigated the major schools of thought on various aspects of quality management and quality improvement. Areas covered included definitions of waste and quality, views on the cost of quality, tools and techniques used for quality improvement, and management philosophies and frameworks for continuous improvement. In addition, this study analyzed the structure and training content of the current Total Quality Management program at Aeronautical Systems Division (ASD). Pre- and post-test surveys on employee attitudes toward organizational effective were analyzed from the Advanced Cruise Missile System Program Office (SPO), the F-15 SPO, and the ASD Deputy Chief of Staff for …


Analysis Of Department Of Defense Organic Depot Maintenance Capacity Management And Facility Utilization Factors, Marlies Dewoody Sep 1991

Analysis Of Department Of Defense Organic Depot Maintenance Capacity Management And Facility Utilization Factors, Marlies Dewoody

Theses and Dissertations

This study investigated the effects of mandated depot capacity utilization rates on throughput, inventory, and operating expense. The measures of merit analyzed were work in process inventories, leadtime, and throughput. Since the services do not use a common computer system to track/compute capacity data, a computer simulation provided the data used to meet the research objectives. The simulation modeled a serially interdependent system subject to statistical fluctuations. Variability in the system was reduced by reducing the spread around the processing time mean. Buffer inventories were placed in front of each process to protect the process from variability. Constrained systems were …


Determining Production Capability In Aircraft Maintenance: A Regression Analysis, Charles R. Jung Sep 1991

Determining Production Capability In Aircraft Maintenance: A Regression Analysis, Charles R. Jung

Theses and Dissertations

This research analyzed twenty-three maintenance constraint and three production output performance measures for nine SAC aircraft systems. SAS System for Elementary Statistical Analysis is used to analyze twenty-one months of ex post facto maintenance data. Correlation analysis is used to identify maintenance constraints that assist in explaining aircraft maintenance production capability. Forward stepwise regression is used to build predictive models of maintenance production capability for each of the nine aircraft systems. The twenty-three maintenance constraint measures are regressed against three productivity output measures: Mission Capable Rate, Total Not Mission Capable Supply Rate and Total Not Mission Capable Maintenance Rate. The …


An Analysis Of Measures Used To Evaluate The Air Force Critical Item Program, Robert R. Lee Sep 1991

An Analysis Of Measures Used To Evaluate The Air Force Critical Item Program, Robert R. Lee

Theses and Dissertations

The purpose of this study was to evaluate the potential of two measures, percent defects and cycle time, to measure the overall performance of the Air Force Critical Item Program (CIP). The need for such study was generated from the current absence of any measurement system available to evaluate the CIP. This research used these two measures with actual data, evaluated the correlation between aircraft availability and percent defects and cycle time, and analyzed management perceptions addressing the usefulness of these measures for field use. Performance of this analysis resulted in support for these measures by over two thirds of …


The Effect Of Defense Management Review Decision 904, Stock Funding Depot Level Reparables, On Cash Flow Within The Reparable Support Division Of The Air Force Stock Fund, Deborah A. Elliot Aug 1991

The Effect Of Defense Management Review Decision 904, Stock Funding Depot Level Reparables, On Cash Flow Within The Reparable Support Division Of The Air Force Stock Fund, Deborah A. Elliot

Theses and Dissertations

This study investigated what the potential cash flow condition of the Reparable Support Division of the Air Force Stock Fund might be after final implementation of the procedures outlined in Defense Management Review Decision 904, Stock Funding Depot Level Reparables. The operation of the future Reparable Support Division was modelled using the General Purpose Simulation Software (GPSS/H) package and future cash flow conditions were projected through use of this model. Recommendations were then made based on the results of these projections and based on other data gathered during the course of the research process.