Open Access. Powered by Scholars. Published by Universities.®

Engineering Commons™

Open Access. Powered by Scholars. Published by Universities.®

Construction

Discipline
Institution
Publication Year
Publication
Publication Type
File Type

Articles 631 - 660 of 902

Full-Text Articles in Engineering

Bs News Dec 1997

Bs News

Building Services Engineering

No abstract provided.


Bs News Oct 1997

Bs News

Building Services Engineering

No abstract provided.


Bs News Sep 1997

Bs News

Building Services Engineering

No abstract provided.


Development Of A Critical Path Method Specification And A Training Program For Use Of Cpm For Kytc, Donn E. Hancher, Raymond F. Werkmeister, Sion L. Tesone Jul 1997

Development Of A Critical Path Method Specification And A Training Program For Use Of Cpm For Kytc, Donn E. Hancher, Raymond F. Werkmeister, Sion L. Tesone

Kentucky Transportation Center Research Report

The Critical Path Method scheduling technique is outlined as it applies to KYTC projects. Special Provision 82 (94) and its requirements are outlined.


Bs News Jul 1997

Bs News

Building Services Engineering

No abstract provided.


Bs News Jun 1997

Bs News

Building Services Engineering

No abstract provided.


Bs News May 1997

Bs News

Building Services Engineering

No abstract provided.


Bs News Apr 1997

Bs News

Building Services Engineering

No abstract provided.


Bs News Mar 1997

Bs News

Building Services Engineering

No abstract provided.


Bs News Feb 1997

Bs News

Building Services Engineering

No abstract provided.


Bs News Jan 1997

Bs News

Building Services Engineering

No abstract provided.


A Cultural Resource Investigation Of Two Louisiana-Pacific Corporation Parcels, Susie Van Kirk Dec 1996

A Cultural Resource Investigation Of Two Louisiana-Pacific Corporation Parcels, Susie Van Kirk

Susie Van Kirk Papers

During the month of October, November, and December 1996, a Cultural Resources Investigation was conducted on two Louisiana-Pacific Corporation parcels located at Big Lagoon, Humboldt County, California (see Map 1). The survey was requested by Jamie Heltsley of Ron Hunt Surveying & Forestry, Arcata, California. Proposed project plans include the combining of four separate assessors parcels into two assessor's parcels.

The purposes of this investigation were to (1) locate and record project area cultural resources; (2) to evaluate the significance of study area cultural resources; (3) to assess potential impacts to cultural resources resulting from project related operations; (4) to …


Bs News Oct 1996

Bs News

Building Services Engineering

No abstract provided.


Bs News Sep 1996

Bs News

Building Services Engineering

No abstract provided.


Bs News Jul 1996

Bs News

Building Services Engineering

No abstract provided.


Cost Estimating And Forecasting For Highway Work In Kentucky [1996], James D. Stevens, Jennifer R. Walton Jun 1996

Cost Estimating And Forecasting For Highway Work In Kentucky [1996], James D. Stevens, Jennifer R. Walton

Kentucky Transportation Center Research Report

There is a need for better cost estimating and forecasting for highway work in the Commonwealth of Kentucky. KRS45.245 grants the Interim Joint Committee on Transportation oversight of the biennial highway plan, including a review of all authorized highway project phases that exceed their estimates by 15%. In recent years, the Kentucky Transportation Cabinet has suffered the loss of many resources necessary to produce good cost estimates.

Estimates developed using current methods are not sufficiently accurate to preclude cost overruns in excess of 15%. Over the 1992 and 1994 bienniums, 362 overruns totaling $162,487,511 have been submitted to the Committee. …


Bs News Jun 1996

Bs News

Building Services Engineering

No abstract provided.


Bs News May 1996

Bs News

Building Services Engineering

No abstract provided.


Bs News Apr 1996

Bs News

Building Services Engineering

No abstract provided.


Bs News Mar 1996

Bs News

Building Services Engineering

No abstract provided.


Bs News Feb 1996

Bs News

Building Services Engineering

No abstract provided.


Cost Scale-Up Factors For Airport Construction, Donald S. Remer, Christopher Wong '96 Jan 1996

Cost Scale-Up Factors For Airport Construction, Donald S. Remer, Christopher Wong '96

All HMC Faculty Publications and Research

Engineers must often make a quick "ballpark" cost estimate of a new plant, facility, or piece of equipment before the detailed design phase. One easy way to obtain such an estimate is to base the cost on a known cost for a similar plant, facility, or piece of equipment by using the ratio of the capacities or sizes of the known and proposed item raised to an exponent R. This predesign cost-estimating approach is especially useful for doing sensitivity analyses and feasibility studies for which a high degree of accuracy is not required. This cost-capacity or power-factor model was …


Bs News Jan 1996

Bs News

Building Services Engineering

No abstract provided.


Bs News Oct 1995

Bs News

Building Services Engineering

No abstract provided.


Bs News Sep 1995

Bs News

Building Services Engineering

No abstract provided.


Bs News Jun 1995

Bs News

Building Services Engineering

No abstract provided.


Bs News Jun 1995

Bs News

Building Services Engineering

No abstract provided.


Bs News Jun 1995

Bs News

Building Services Engineering

No abstract provided.


Bs News May 1995

Bs News

Building Services Engineering

No abstract provided.


Bs News Apr 1995

Bs News

Building Services Engineering

No abstract provided.