Open Access. Powered by Scholars. Published by Universities.®
- Discipline
-
- Civil and Environmental Engineering (1728)
- Mechanical Engineering (1643)
- Electrical and Computer Engineering (1610)
- Construction Engineering and Management (1026)
- Aerospace Engineering (755)
-
- Computer Engineering (722)
- Biomedical Engineering and Bioengineering (643)
- Operations Research, Systems Engineering and Industrial Engineering (590)
- Materials Science and Engineering (586)
- Manufacturing (545)
- Electrical and Electronics (501)
- Industrial Engineering (416)
- Power and Energy (412)
- Bioresource and Agricultural Engineering (372)
- Other Mechanical Engineering (319)
- Other Engineering (310)
- Other Computer Engineering (272)
- Electro-Mechanical Systems (245)
- Physical Sciences and Mathematics (227)
- Biomedical Devices and Instrumentation (213)
- Computer-Aided Engineering and Design (204)
- Architecture (202)
- Applied Mechanics (180)
- Signal Processing (175)
- Systems and Communications (159)
- Other Electrical and Computer Engineering (154)
- Robotics (145)
- Industrial Technology (141)
- Computer and Systems Architecture (140)
- Keyword
-
- Construction (171)
- Irrigation (167)
- Design (112)
- Performance Based Design (100)
- Sustainability (97)
-
- Solar (90)
- Fire Dynamics Simulator (FDS) (78)
- RSET (76)
- ASET (74)
- Concrete (68)
- Materials Engineering (65)
- Life Safety Code (64)
- Construction Management (60)
- Power (60)
- CubeSat (57)
- Manufacturing (53)
- Safety (53)
- Interdisciplinary (52)
- Robotics (52)
- Simulation (52)
- Efficiency (50)
- Cal Poly (49)
- Machine Learning (48)
- Arduino (47)
- Composites (46)
- Energy (46)
- Automation (45)
- Education (45)
- Optimization (40)
- Composite (37)
- Publication Year
- Publication
-
- Master's Theses (1789)
- Construction Management (1001)
- Electrical Engineering (990)
- Mechanical Engineering (953)
- Materials Engineering (401)
-
- Industrial and Manufacturing Engineering (365)
- BioResource and Agricultural Engineering (362)
- Civil and Environmental Engineering (345)
- Computer Engineering (304)
- Biomedical Engineering (298)
- Aerospace Engineering (280)
- Fire Protection Engineering: Culminating Experience Project Reports (194)
- College of Engineering Summer Undergraduate Research Program (132)
- Industrial Technology and Packaging (131)
- Computer Science and Software Engineering (98)
- Architectural Engineering (74)
- STAR Program Research Presentations (68)
- Office of the Provost Scholarship (52)
- Liberal Arts and Engineering Studies (37)
- Physics (22)
- Office of the Dean (CENG) Scholarship (17)
- General Engineering (15)
- Graphic Communication (9)
- Architectural Engineering: Graduate Reports (6)
- Biomedical Engineering: Graduate Reports and Projects (6)
- City and Regional Planning (6)
- Agricultural Education and Communication (5)
- Feminist Pedagogy (3)
- City and Regional Planning Studios and Projects (2)
- Mechanical Engineering Lab Manuals (2)
- Publication Type
- File Type
Articles 2641 - 2670 of 7978
Full-Text Articles in Engineering
Reduce, Reuse, Reengineer, Neil Ryan Robertson, Anthony James Beers
Reduce, Reuse, Reengineer, Neil Ryan Robertson, Anthony James Beers
Architectural Engineering
Our senior project is a research exploration of renewable energy. We recognized there is a major need in the world for the advancement of green power sources. For our project, we wanted to go beyond what we have learned in our Cal Poly architectural engineering classes and to use some of our own creativity to investigate the possibilities of renewable energy from a structural perspective. The guiding question we asked ourselves was, “as architectural engineering students, how could we shift our world to use more renewable energy?” To start our journey off, was the original inspiration from the work of …
Pedestrian Bridge In Tanzania, Maja Sagaser, Karina Rosales
Pedestrian Bridge In Tanzania, Maja Sagaser, Karina Rosales
Architectural Engineering
This senior project originated to address the need of the community of Same, Tanzania. There is a deep and wide ravine which floods, making the path many adults and children take to the Majevu Primary School increasingly difficult and dangerous. This report encapsulates all of the steps taken to complete an approved final design for a footbridge to be constructed over this ravine. It includes the project overview, the architectural and structural design process, as well as the important considerations. There are also structural drawings that include plans, elevations, and details.
Steel Test Set-Up For Non-Ductile Concrete Shear Walls, Colin S. Ridgley
Steel Test Set-Up For Non-Ductile Concrete Shear Walls, Colin S. Ridgley
Architectural Engineering
The purpose of this project was to provide a robust test set-up for the thesis work being conducted by graduate students, Jerry Luong & Rory de Sevilla. Their research aims to evaluate the feasibility of using fiber-reinforced polymer wraps and splay anchors to retrofit non-ductile concrete shear walls through a series of tests on reinforced concrete walls.
Four key constraints governed the design of the test set-up. First, the wall can be cyclically, laterally loaded to develop data for comparison with theoretical analysis methods. Second, the wall can be axially loaded to simulate interaction effects and prevent a sliding failure …
Analog Single Sideband-Pulse Width Modulation Processor For Parametric Acoustic Arrays, Vikrant A. Marathe
Analog Single Sideband-Pulse Width Modulation Processor For Parametric Acoustic Arrays, Vikrant A. Marathe
Master's Theses
Parametric acoustic arrays are ultrasonic-based loudspeakers that produce highly directive audio. The audio must first be preprocessed and modulated into an ultrasonic carrier before being emitted into the air, where it will self-demodulate in the far field. The resulting audio wave is proportional to the double time-derivative of the square of the modulation envelope. This thesis presents a fully analog processor which encodes the audio into two Pulse Width Modulated (PWM) signals in quadrature phase and sums them together to produce a Single Sideband (SSB) spectrum around the fundamental frequency of the PWM signals. The two signals are modulated between …
Microscope System, Virginia Brannaman, Gavin Shavey, Ricardo Lasa
Microscope System, Virginia Brannaman, Gavin Shavey, Ricardo Lasa
Biomedical Engineering
This project aims to improve upon the current microscope stand for the Olympus compound microscope in the Microcirculation and Vascular Regeneration (MaVR) laboratory in order to minimize angular deflection of the microscope objective with respect to surgical stage.
Modifying Casting Parameters To Improve The High Temperature Ductility Of Investment Cast Nickel-Based Superalloy Pwa 1455, Lars Alexander Hedin, Cole Magnum Introligator
Modifying Casting Parameters To Improve The High Temperature Ductility Of Investment Cast Nickel-Based Superalloy Pwa 1455, Lars Alexander Hedin, Cole Magnum Introligator
Materials Engineering
PCC Structurals, an industry leader in superalloy investment castings, has observed inconsistencies in the stress rupture performance of polycrystalline nickel-based superalloy PWA 1455. PCC has changed their casting parameters to reduce the thermal gradient during cooling but have been unable to correlate these changes with an increase in stress rupture elongation. Metallographic examination of past samples indicated microstructures composed of non- equiaxed dendritic grains with mean diameter of .021 inches along the test axis. A similar study on polycrystalline superalloys has indicated that excessive superheat temperatures above the liquidus can result in large grains identical to those observed, limiting the …
Effect Of Solder Joint Flux Residue On Medical Guide Wire Performance, Rebecca Lisberg, Enlly Bugarin Rodriguez
Effect Of Solder Joint Flux Residue On Medical Guide Wire Performance, Rebecca Lisberg, Enlly Bugarin Rodriguez
Materials Engineering
The effect of residual soldering flux on the mechanical properties of 304 stainless-steel core medical guide wires was analyzed. A soldering process joins the metallic components of the distal end of a medical guide wire product. Acidic soldering flux is used to prepare the surfaces of the metallic substrates. Manufacturing protocol utilizes an ultrasonic bath to remove excess flux from the soldered joints. Sample groups underwent different levels of cleaning: no cleaning, partial cleaning, and full ultrasonic bath cleaning to obtain varying residual flux levels. Experimental sample groups underwent corrosion acceleration in an environmental chamber at 37°C and 85% relative …
Grammar-Based Procedurally Generated Village Creation Tool, Kevin Matthew Graves
Grammar-Based Procedurally Generated Village Creation Tool, Kevin Matthew Graves
Computer Engineering
This project is a 3D village generator tool for Unity. It consists of three components: a building, mountain, and river generator. All of these generators use grammar-based procedural generation in order to create a unique and logical village and landscape each time the program is run.
Creating A Pull Planning Guide For Industry Use, Michael B. Avila
Creating A Pull Planning Guide For Industry Use, Michael B. Avila
Construction Management
The construction industry is quickly making Pull Planning sessions a commodity only the largest companies can afford due to expensive consultants and the common perception of a complicated process. Pull Planning does not need to be complicated but can be quickly implemented by all types of companies utilizing extensive research completed on The Last Planner System. The benefits of Pull Planning include creating buy-in to the plan, making hand-offs known, and creating reliability and trust from the key Players on a project. As the demand for a more productive construction project rises, it is increasingly important for the scheduling methods …
Journeyman International - Rubagabaga Evc And Ace - Rwanda, Africa, Jake M. Stom
Journeyman International - Rubagabaga Evc And Ace - Rwanda, Africa, Jake M. Stom
Construction Management
Rubagabaga EVC and ACE, or Empowering Villages Center and Agricultural Center of Excellence, is an interdisciplinary project based senior project completed by California Polytechnic State University, San Luis Obispo students. College of Architecture and Environmental Design students Jake Stom, Mackenzie Diaz, Julia De Hart, and Jenna Williams completed the design and preconstruction services with the help of non-profit humanitarian organization, Journeyman International. The deliverable aims to serve the client, Empowering Villages, by providing the complete design of a community center and agricultural training facility near Kaseke Village in Rwanda. The goal is to provide the local community with development efforts …
Parents For Joy, Atascadero All-Inclusive Playground, Harrison R. Tucker
Parents For Joy, Atascadero All-Inclusive Playground, Harrison R. Tucker
Construction Management
Parents for Joy is an organization that was created in 2014 by a group of parents and families living around the Atascadero community who have children with special needs. The group raised over one million dollars to build a playground that enhances the safety of both children and adults with special needs, regardless of what needs they possess. Nick Volluci and Harrison Tucker, the author, were chosen to assist on this project in order to provide a high quality and methodical product that catered to the special requirements set forth by the owners, Parents for Joy and the City of …
Coffey Park - Is It Worth Rebuilding Homes Or Should Fire Victims Look To Modular Housing?, Shelby A. Hession
Coffey Park - Is It Worth Rebuilding Homes Or Should Fire Victims Look To Modular Housing?, Shelby A. Hession
Construction Management
In October 2017, Coffey Park, a neighborhood within the city of Santa Rosa, CA, experienced mass destruction from the Tubbs Fire. Most of the neighborhood was burnt down, leaving fire victims with empty lots that they need to decide what to do with. For the average person, being well versed in the construction process and the different methods that can be used in the recovery process is rare. This paper is a tool to provide those in fire recovery with all of the information they will need in one place. Both modular and traditional stick-built housing are explored in this …
Revision Of The Archicad Manual For Cm 115, Emma Wagner
Revision Of The Archicad Manual For Cm 115, Emma Wagner
Construction Management
Each CM 115: Fundamentals of Construction Management section contains a quarter long project, the goal of which is to familiarize the students with a modeling software. More so, the goal of the project is to introduce them to a set of construction documents- how to get started, what is included, what they need to pay attention to as a construction manager, and most importantly, to implement what they learn from their written coursework completed during class. This manual was written to help students complete this assignment to the best of their ability, producing a piece of work that shows they …
A Case Study On The Ciob Global Student Challenge - Project Overview, Jacob Ryan Navarre
A Case Study On The Ciob Global Student Challenge - Project Overview, Jacob Ryan Navarre
Construction Management
An international construction competition called the Chartered Institute of Building (CIOB) Global Student Challenge has been introduced recently and is starting to gain attention in the United States. The competition is based on the utilization of a virtual construction simulation program called MERIT. Virtual construction simulations have been around for decades, yet, are still somewhat new to the construction industry and construction education programs. This past year, a group of California Polytechnic State University students studying Construction Management participated in the competition as the university’s first ever team. This paper will examine the competition as a whole, providing details on …
Case Study: Using Geofoam On A School Project In Encinitas, Ca, Matthew D. Gaebe
Case Study: Using Geofoam On A School Project In Encinitas, Ca, Matthew D. Gaebe
Construction Management
This paper is a case study that identifies why Geofoam was used as in-fill material for a construction project located at a high school in Encinitas, CA. The Geofoam was installed under a stairway that connects to a structural retaining wall. The concrete formwork was connected directly to the foam and the stairs were poured in place onsite. The foam acted as the on-grade material, so the concrete stairs did not have to be self-supporting. The purpose of this study is to understand the benefits of using Geofoam, as the in-fill material, as opposed to other traditional materials. An analysis …
Logistics Of Construction In Agbokpa, Ghana, Fletcher David Podosek
Logistics Of Construction In Agbokpa, Ghana, Fletcher David Podosek
Construction Management
In August of 2019, three Cal Poly CM students will travel to the remote fishing village of Agbokpa in Ghana. Our project is to install a water filtration system that will create potable water for the villagers that currently have to walk miles to obtain clean water. We will be laying nearly 1000 ft of pipe, installing a solar powered pump, and building a water filtration system hours away from any electricity. A project of this type requires a great deal of logistical planning in order to ensure that all aspects of the project is thought of and planned for. …
Integration Of Digital Forms For Improved Safety And Quality Control: A Case Study, Andrew Cisterman
Integration Of Digital Forms For Improved Safety And Quality Control: A Case Study, Andrew Cisterman
Construction Management
The integration of new technology into the construction industry is commonly practiced in an attempt to improve standards and quality. iAuditor is an inspection checklist app which provides clients with the tools to build custom and dynamic forms to fit the needs of its client base. This paper examines the effectiveness of integrating this new software and observe the difficulties of integrating such new practices into a company’s safety and quality control programs. Additionally, this paper evaluates ways the aforementioned software could be improved to better meet the needs of its users as well as assess ways it could be …
Develop An Mep Based Scheduling Learning Module With Industry Support And Guidance To Understand The Impact On The General Contractor, Andy S. Rios
Construction Management
The Construction Management (CM) program at Cal Poly, San Luis Obispo is recognized as one of the best construction programs in country. The curriculum does an extraordinary job at teaching how to utilize software and technology to create a project schedule. The one thing that the curriculum lacks is learning sequencing of events when it comes to scheduling, and where to look to obtain this information. Although learning sequencing for scheduling is hard to teach because it comes with years of industry experience, it is important to have a basic understanding of how things come together to create a functioning …
Ciob Global Student Challenge - Integration Into Professional Financial Training, George M. King
Ciob Global Student Challenge - Integration Into Professional Financial Training, George M. King
Construction Management
As anyone in the construction industry knows, a construction business is one of the most risky to start compared to any other industry. This does not mean that it should be avoided by potential entrepreneurs, just viewed with a more cautious eye than other industries. Those considering entering the industry should have experience and confidence in their ability to perform prior to the establishment of a company. One way to gain this experience is through years of work in the respective sector. Another, more experimental method, is through the use of competitive virtual training. The latter requires less training time …
Framing Exterior Partitions For The Great Northern Services Housing Project, Patrick Pierre Shami
Framing Exterior Partitions For The Great Northern Services Housing Project, Patrick Pierre Shami
Construction Management
In the wake of a fire in Weed, CA that destroyed 150 homes, Great Northern Services (GNS), a nonprofit organization, reached out to Cal-Poly San Luis Obispo about a service-learning opportunity. This opportunity involved designing a single-family home and prefabricating the exterior partitions in San Luis Obispo. In Fall 2017, interdisciplinary teams of students delivered design proposals in the Integrated Project Delivery studio. The selected design was then finalized into a permitted set of drawings, and planning for the prefabrication began. The extent of the prefabrication was limited to the framing and sheathing of the exterior walls. The length of …
Workflow For Modeling Prefabricated Building Assemblies In Autodesk Revit, Matthew Truss
Workflow For Modeling Prefabricated Building Assemblies In Autodesk Revit, Matthew Truss
Construction Management
In 2008, by request of the National Institute of Standards and Technology (NIST), the National Research Council† (NRC) put together a committee of experts to advise a plan that would advance the “competitiveness and productivity of U.S. construction industry in the next 20 years.” Two of those recommendations included the widespread deployment of building information modeling (BIM) and greater use of prefabrication, preassembly, modularization, and off-site fabrication techniques. Case studies on the subject overwhelmingly report faster project delivery, improved quality, and safer working conditions. However, current data indicates that labor productivity has still been significantly lacking, perhaps showing that investment …
Ghana Clean Water Initiative – Risk Management, Mason Nolan
Ghana Clean Water Initiative – Risk Management, Mason Nolan
Construction Management
In August of 2019 several Cal Poly Students will be traveling to a remote fishing village located off of Lake Volta in Ghana. This project is being completed by Cal Poly's MCAA chapter alongside the NECA chapter. These students will be constructing a community center, a water filtration system, and ice making and refrigeration facilities. The project will rely heavily on solar power as there is no grid in the village the project is taking place in. This project inherently has many risks associated with it and needs a risk management plan to combat these risks. The three ways these …
Prefabrication Of Exterior Partitions For Great Northern Services, John Christofer Claudio Espino
Prefabrication Of Exterior Partitions For Great Northern Services, John Christofer Claudio Espino
Construction Management
In the wake of a fire in Weed, CA that destroyed 150 homes, a non-profit organization called Great Northern Services (GNS) reached out to Cal-Poly San Luis Obispo about a service-learning opportunity that involved designing a single-family home and pre fabricating the exterior partitions in San Luis Obispo. In Fall 2017, interdisciplinary teams of students delivered design proposals in the Integrated Project Delivery studio. The selected design was then finalized into a permitted set of drawings and planning for the prefabrication began. The extent of the prefabrication was limited to the framing and sheathing of the exterior walls. The length …
Framing Exterior Partitions For The Great Northern Services Housing Project, Michael-Jeremiah R. Eseed
Framing Exterior Partitions For The Great Northern Services Housing Project, Michael-Jeremiah R. Eseed
Construction Management
In the wake of a fire in Weed, CA that destroyed nearly 150 homes, a non-profit organization called Great Northern Services (GNS) reached out to Cal-Poly San Luis Obispo about a service-learning opportunity that involved designing a single-family home and prefabricating the exterior partitions in San Luis Obispo. In Fall 2017, interdisciplinary teams of students delivered design proposals in the Integrated Project Delivery studio. The selected design was then finalized into a permitted set of drawings and planning for the prefabrication began. The extent of the prefabrication was limited to the framing and sheathing of the exterior walls. The length …
Journeyman International: Bihongora Library In Rwanda, Africa, Sarah N. Nelson
Journeyman International: Bihongora Library In Rwanda, Africa, Sarah N. Nelson
Construction Management
My senior project is an interdisciplinary effort between students from the College of Architecture and Environmental Design at California Polytechnic State University, San Luis Obispo and Journeyman International. Our team was given the task to design, engineer, and produce preconstruction services for a library in Bihongora, Rwanda. My main deliverables as the construction manager consist of a construction estimate with quantity take-offs, a construction schedule, and a project site plan. There is a great need for literacy in Rwanda, among both children and adults, so by building a library we are hoping to provide the locals in the community with …
Cost Impact Of Converting A Fleet Of Diesel Concrete Mixer Trucks To Compressed Natural Gas, Shea Fredrick Blackman
Cost Impact Of Converting A Fleet Of Diesel Concrete Mixer Trucks To Compressed Natural Gas, Shea Fredrick Blackman
Construction Management
Sustainable practices in the built environment are becoming more and more sought after. With LEED gold and platinum becoming the new standard in commercial construction, contractors in all areas of construction are looking for ways to build more sustainably. When creating a strategy for achieving sustainability, transportation has been identified as an area of the construction industry that can help significantly reduce carbon footprint, especially concrete mixer trucks. One question presents itself: Will the cost impact of converting a fleet of concrete mixer trucks from diesel to compressed natural gas outweigh the environmental benefits? This case study will examine the …
Optimizing Internships In Construction Management Based On Student's Interests And Experience, Austin Meneses Logan
Optimizing Internships In Construction Management Based On Student's Interests And Experience, Austin Meneses Logan
Construction Management
The growing norm for students in the field of Construction Management is to have at least one internship under their belt prior to entering the industry for a full-time career. The goal of this research paper is to analyze student feedback from their previous internships to draw conclusions on how companies should structure their internship programs based on student interests and level of experience. Research was done evaluating current Construction Management students with previous internship experience at California Polytechnic State University San Luis Obispo. This research paper will be beneficial for industry companies to better tailor their internship programs to …
Journeyman International: Peace Academy Of The Sciences And The Arts, Alyssa L. Mathias
Journeyman International: Peace Academy Of The Sciences And The Arts, Alyssa L. Mathias
Construction Management
For years, K-12 education has been taught through separate, individual subjects such as Math, English, Art, and Science. Primary education has remained stagnant while our society is constantly evolving with technological advances and innovation. The Peace Academy of the Sciences and Arts in San Luis Obispo, California are a group of visionaries and educators challenging traditional learning styles. They are striving to offer an education that focuses on holistic learning and integrating all subjects into big ideas to create competent, compassionate leaders for the future. My senior project is a collaboration between Journeyman International, the Peace Academy, a student in …
Habitat For Humanity Global Village: Trinidad And Tobago, Morghan L. Heim
Habitat For Humanity Global Village: Trinidad And Tobago, Morghan L. Heim
Construction Management
For my senior project I chose to help build a home for Habitat for Humanity Global Village in Trinidad and Tobago. Habitat’s mission is to provide shelter for those in need, and they do so in many countries around the world. I experienced working in another country with a lack of building codes and equipment. The experience challenged me and taught me many lessons in working with teams and in foreign places. Our team was set out to construct the foundation of a home, but due to weather impacts and lack of equipment, our group did not completely finish the …
Journeyman International - Kilimbi Community Center And Eco-Lodge - Rwanda, Africa, Chris Audi
Journeyman International - Kilimbi Community Center And Eco-Lodge - Rwanda, Africa, Chris Audi
Construction Management
This project based senior project is an interdisciplinary partnership with a non-profit called Journeyman International (JI) and students from the College of Architecture and Environmental Design (CAED) at Cal Poly San Luis Obispo (Cal Poly). Journeyman International worked Empowering Villages and our design team to design a community center, eco-lodge, and guest houses to enable the local population to take advantage of a tourism heavy area creating jobs and income. Empowering Villages objective is to empower, train, and build up the people they work with and hope to someday see Villages around the world become self-sufficient by working with locals …