Articles 61 - 90 of 146

Full-Text Articles in Architectural Engineering

A Critical Analysis Of How Large Irish Architectural Practices Responded To Initial Covid-19 Restrictions And The Affect Implementing Remote Working Had On Bim Processes, Policies, And People, Bim Tudublin, John Mcenroy Jan 2021

A Critical Analysis Of How Large Irish Architectural Practices Responded To Initial Covid-19 Restrictions And The Affect Implementing Remote Working Had On Bim Processes, Policies, And People, Bim Tudublin, John Mcenroy

Capstone Reports

The unprecedent events which transpired in the 88-day period from the 31st of December 2019 to the 27th of March 2020 have changed the world in which we live and work. The outbreak of Coronavirus disease 19 (COVID-19) and the ensuing pandemic which has evolved are descripted as one in a hundred-year events. This paper researched and critically analyses the operations which large Irish Architecture firms initiated during this period in order to facilitate the ability of its employees working from a remote location, focusing on how the People, Processes and Policies of BIM (3 Ps of BIM); adapted to …


Tanzanian Concrete Masonry Walls, Edward J. Kaminski Dec 2020

Tanzanian Concrete Masonry Walls, Edward J. Kaminski

Architectural Engineering

Walls that replicate masonry walls used in Tanzania are constructed and tested. The results from testing was compared with the respective predictions made using code guidelines from ASCE 7 and TMS 402.


Investigation Of Modeling Strategies For Slender Lightly Reinforced Concrete Shear Walls, Jenna Marie Williams, Tracy Destiny Doan Aug 2020

Investigation Of Modeling Strategies For Slender Lightly Reinforced Concrete Shear Walls, Jenna Marie Williams, Tracy Destiny Doan

Architectural Engineering: Graduate Reports

A large number of pre-1980’s non-ductile reinforced concrete (RC) structures in California utilizing RC shear walls to resist seismic lateral forces have been identified as deficient by industry practitioners. These non-ductile wall systems are typically lightly reinforced and lack adequate boundary element detailing. Analytical studies suggest these walls are susceptible to brittle, compression-controlled failure modes due to damage from concrete crushing and bar buckling. Furthermore, poor behavior of lightly reinforced concrete walls was observed in many recent earthquakes, for example in Chile (1985), New Zealand (2010/2011) and Mexico (2017). This has generated concern among engineers in high seismic regions around …


Folded! High-Rise, Alejandra Bravo, Riley Joseph Denis Jun 2020

Folded! High-Rise, Alejandra Bravo, Riley Joseph Denis

Architectural Engineering

The authors of this report are undergraduate Architectural Engineering students at California Polytechnic State University in San Luis Obispo. This report documents their experience in an interdisciplinary studio of high‐rise building design and the process by which they produced a schematic design of a high‐rise residential building in San Francisco. It will address the organization of the studio, the development of concept as well as form and structure, the studies and structural analyses, as well as the review process and the competitions the final proposals were entered in, and include some final takeaways from each Architectural Engineering group member.


Analysis Of Burning Wood In The Transient State And The Application To Structural Design, Roberta Veliz, Kimberly Guzman Jun 2020

Analysis Of Burning Wood In The Transient State And The Application To Structural Design, Roberta Veliz, Kimberly Guzman

Architectural Engineering

Determining the extent of the contribution of exposed timber on compartment fire dynamics in open floor plans is a complex process. Designers traditionally used compartmentalization design methods which create spaces where flashover is likely, given the fuel load and ventilation conditions. However, due to the large geometric dimensions and spread of fuel, fires in open floor plans are more likely to remain as localized or traveling fires. As such, an understanding of not only ignition potential but also flame spread is critical to characterizing the contribution of exposed timber. An integral step in characterizing the potential contribution is through an …


Wine History Project Pavilion, Douglas Mcarthur Jun 2020

Wine History Project Pavilion, Douglas Mcarthur

Architectural Engineering

The Wine History Pavilion Project is a continuing endeavor of Cal Poly students working on an exhibitive, traveling structure for the San Luis Obispo community. The project started during the 2019 Fall Quarter in the interdisciplinary Integrated Project Delivery (IPD) Studio and has progressed to the detailed design stage for its eventual fabrication and installation. This report discusses the detailed design stage that 4th year Architectural Engineering student, Douglas McArthur, worked on.


The Aloe: High Rise Schematic Design And Analysis, Tony Duc Nguyen, Lilliann Lan Lai Jun 2020

The Aloe: High Rise Schematic Design And Analysis, Tony Duc Nguyen, Lilliann Lan Lai

Architectural Engineering

The authors of this document are architectural engineering (ARCE) undergraduate students from California Polytechnic State University, San Luis Obispo (Cal Poly). They joined the 2020 Skyscraper Collaboratory as part of the ARCE course 415: Interdisciplinary Capstone Project. This course emphasizes the analysis and evaluation of interdisciplinary challenges associated with integrating the design and construction processes to deliver a project with respect to the design, quality, and performance expectations for a client or presented criteria. The course was taught in collaboration with industry partners and associates from the global architectural, urban planning, and engineering firm Skidmore, Owings & Merrill (SOM). Instruction …


Piazza Di Ulivo: Arce Patio Redesign, Sophia Kim-Oanh Ha, David Colman Jun 2020

Piazza Di Ulivo: Arce Patio Redesign, Sophia Kim-Oanh Ha, David Colman

Architectural Engineering

Piazza de Ulivo was Phase 1 of a multi-quarter initiative to redesign and bring life to a patio space adjacent to Engineering West (Building 21) in Spring of 2020. Located within the central courtyard of Engineering West (Hasslein Garden), the patio space previously contained a senior project pergola that collapsed and has been removed. The remaining elements from this previous structure were an inverted moment frame consisting of five concrete columns and beams joining them. Additionally, a wooden bench with concrete pedestals remained under the shade of the existing olive tree. Desire within the Architectural Engineering (ARCE) department for the …


Why Are Residential Property Developers In Ireland Not Using Bim?, Bim Tudublin, Simon Burke Jan 2020

Why Are Residential Property Developers In Ireland Not Using Bim?, Bim Tudublin, Simon Burke

Capstone Reports

The aim of this paper is to establish the level of BIM adoption by larger-scale residential property developers in Ireland and investigate the benefits and challenges of implementing BIM for residential housing. While BIM is a relatively new concept in Ireland for housing, developers and investors in larger scale developments are beginning to recognize areas where BIM can add value to their projects. The research also indicates that while there is evidence of successful BIM implementation for housing resulting in savings in cost and time, widespread adoption is hindered by a lack of knowledge and skills, costs of implementation, lack …


A Comparative Study Of Cadworx Plant 2018 And Revit 2020 With Ez-Iso Add-In, For The Production Of Piping Isometrics, Bim Tudublin, Killian Lynch Jan 2020

A Comparative Study Of Cadworx Plant 2018 And Revit 2020 With Ez-Iso Add-In, For The Production Of Piping Isometrics, Bim Tudublin, Killian Lynch

Capstone Reports

BIM software evaluation and selection is a complex process. In this paper, a comparative study of Revit 2020 with Ez-ISO add-in, and CADWorx Plant 2018, was carried out. The aim of this study was to determine if a MEP contractor could consolidate software usage into one package, thereby reducing costs for pipework modelling and isometric production. A comprehensive evaluation was developed based on a literature review. A multicriteria decision-making method was used in conjunction with the software evaluation to ensure sound choices were made. An online survey of senior BIM professionals was conducted to validate the analysis and findings. The …


A Critical Appraisal Of Findings And Solutions To Overcome Erroneous Bim Model Production And Information Delivery Workflows, Bim Tudublin, Ryan Forde Jan 2020

A Critical Appraisal Of Findings And Solutions To Overcome Erroneous Bim Model Production And Information Delivery Workflows, Bim Tudublin, Ryan Forde

Capstone Reports

There are many varying definitions of Building Information Modelling, all of which reflect its transformative capabilities and impact on the construction sector. BIM is an emerging technological and procedural shift within the AEC industry (Succar, 2009). BIM is not just a technological change, but also a procedural and workflow change (Charles Eastman, 2018). Despite the growth of BIM adoption and increasing levels of maturity regarding BIM standards, numerous issues still arise at a micro level during project execution. BIM invokes the need for workflows, frameworks and processes that imparts knowledge, heightens trust, increases efficiency and consistency while reducing fragmentation and …


A Critical Examination Of The Use Of Business Intelligence (Bi) In The Optioneering Of Generative Design Models: A Case Study., Bim Tudublin, Davitt Lamon Jan 2020

A Critical Examination Of The Use Of Business Intelligence (Bi) In The Optioneering Of Generative Design Models: A Case Study., Bim Tudublin, Davitt Lamon

Capstone Reports

This research outlines the development of a generative des ign workflow for the architectural space planning of a 1,200 sq.m office located in Dublin, Ireland, and the application of statistical analysis and data visualisation for the optioneering of gen erated models. First, the paper defines a computational desig n model with the potential to generate a variety of office layouts, including circulation routes and desk locations. It then identifies three unique performance metrics that evaluate each design option. Finally, the study applies a multi objective genetic algorithm (MOGA) to explore the high dimensional design space of all potential options and …


Peak Pressures On Low Rise Buildings: Cfd With Les Versus Full Scale And Wind Tunnel Measurements, Aly Mousaad Aly, Hamzeh Gol-Zaroudi Jan 2020

Peak Pressures On Low Rise Buildings: Cfd With Les Versus Full Scale And Wind Tunnel Measurements, Aly Mousaad Aly, Hamzeh Gol-Zaroudi

Faculty Publications

This paper focuses on the processes of wind flow in the atmospheric boundary layer, to produce realistic full-scale pressures for the design of low-rise buildings. CFD with LES turbulence closure is implemented on a scale 1:1 prototype building. A proximity study was executed computationally in CFD with LES that suggests new recommendations on the computational domain size, in front of a building model, apart from common RANS-based guidelines (e.g. COST and AIJ). Our findings suggest a location of the test building, different from existing guidelines, and the inflow boundary proximity influences pressure correlation and reproduction of peak loads. The CFD …


Can The Integration Of Bim And Gis Enhance Information Management For Large Scale Linear Infrastructure Projects?, Bim Tudublin, Brendan Kennedy Jan 2020

Can The Integration Of Bim And Gis Enhance Information Management For Large Scale Linear Infrastructure Projects?, Bim Tudublin, Brendan Kennedy

Capstone Reports

The integration of BIM and GIS is the subject of considerable research, particularly as the two coalesce for the purpose of information management. Large scale infrastructure projects require best practice in terms of how information is managed given the volume of information generated throughout the project lifecycle and the numerous parties requiring access to project content. This paper investigates whether the integration of BIM and GIS can enhance information management on large scale linear infrastructure projects. The research comprised a literature review and interviews with a number of BIM/GIS professionals actively working on linear infrastructure projects across the world. Some …


Forensic Investigation Of Building Failure – The Harbour Cay Condominium Disaster, John Airis Dec 2019

Forensic Investigation Of Building Failure – The Harbour Cay Condominium Disaster, John Airis

Publications and Research

When a building suffers collapse, the U.S. Occupational Safety and Health Administration (OSHA) is tasked with conducting an investigation into the cause. Often OSHA will request technical assistance from the National Institute for Standards and Technology to assist in the forensic technical aspects determining a most probable cause. This forensic effort entails many actions. The Harbour Cay Condominium disaster occurred on March 28, 1981 in Cocoa Beach, Florida. It was a total collapse of a five story reinforced concrete structure during the last stage of roof construction, resulting in 11 deaths and 24 injuries. The investigation report revealed structural design …


Centres Of Excellence And Roadmaps For Digital Transition: Lessons For Ireland’S Construction Industry, Barry Mcauley, Alan Hore, Roger West Sep 2019

Centres Of Excellence And Roadmaps For Digital Transition: Lessons For Ireland’S Construction Industry, Barry Mcauley, Alan Hore, Roger West

Conference papers

Like most sectors in today’s working world, construction businesses are challenged to work in an increasingly digitised world with sophisticated demands from intelligent clients. So much has been written about the inefficiencies of the construction industry, its fragmentation, lack of collaboration, low margins, adversarial pricing, poor productivity, financial fragility, lack of research and development, poor industry image and relatively weak use of digital solutions. The Irish government recognises the importance of digital innovation to address many of the challenges the construction industry faces. With recent high profile reports of escalating spend on signature public sector projects and weak productivity performance …


Improving The Sustainability Of The Built Environment By Training Its Workforce In More Efficient And Greener Ways Of Designing And Constructing Through The Horizon2020 Bimcert Project, Barry Mcauley, Avril Behan Sep 2019

Improving The Sustainability Of The Built Environment By Training Its Workforce In More Efficient And Greener Ways Of Designing And Constructing Through The Horizon2020 Bimcert Project, Barry Mcauley, Avril Behan

Conference papers

The construction industry consumes up to 50% of mineral resources excavated from nature, generates about 33% of CO2 present in the atmosphere and is responsible for 40% of total global energy through both construction and operation of buildings. The realisation that current pervasive construction practices now face globalization, sustainability, and environmental concerns, as well as ever-changing legislation requirements and new skills needed for the information age has resulted in technologies such as Building Information Modelling (BIM) becoming a key enabler in navigating these barriers. To assist in overcoming these barriers, a number of funding initiatives have been put in place …


From Roadmap To Implementation: Lessons For Ireland’S Digital Construction Programme, Barry Mcauley, Alan Hore, Roger West Sep 2019

From Roadmap To Implementation: Lessons For Ireland’S Digital Construction Programme, Barry Mcauley, Alan Hore, Roger West

Conference papers

As part of their Future of Construction initiative in 2018 the World Economic Forum published an action plan to accelerate Building Information Modelling adoption. The WEF report highlighted actions that companies, industry organisations and governments are advised to implement to accelerate BIM adoption and better capitalise on delivering better project outcomes. According the authors of the report BIM is seen as the centrepiece of the construction industry’s digital transformation, however they acknowledged that BIM adoption globally remain slow. Anecdotal experience would suggest that BIM usage in Ireland is also very low and that a similar initiative or an adaptation of …


Pedestrian Bridge In Tanzania, Maja Sagaser, Karina Rosales Jun 2019

Pedestrian Bridge In Tanzania, Maja Sagaser, Karina Rosales

Architectural Engineering

This senior project originated to address the need of the community of Same, Tanzania. There is a deep and wide ravine which floods, making the path many adults and children take to the Majevu Primary School increasingly difficult and dangerous. This report encapsulates all of the steps taken to complete an approved final design for a footbridge to be constructed over this ravine. It includes the project overview, the architectural and structural design process, as well as the important considerations. There are also structural drawings that include plans, elevations, and details.


Steel Test Set-Up For Non-Ductile Concrete Shear Walls, Colin S. Ridgley Jun 2019

Steel Test Set-Up For Non-Ductile Concrete Shear Walls, Colin S. Ridgley

Architectural Engineering

The purpose of this project was to provide a robust test set-up for the thesis work being conducted by graduate students, Jerry Luong & Rory de Sevilla. Their research aims to evaluate the feasibility of using fiber-reinforced polymer wraps and splay anchors to retrofit non-ductile concrete shear walls through a series of tests on reinforced concrete walls.

Four key constraints governed the design of the test set-up. First, the wall can be cyclically, laterally loaded to develop data for comparison with theoretical analysis methods. Second, the wall can be axially loaded to simulate interaction effects and prevent a sliding failure …


The Timber Buckling Restrained Brace Frame, Jessica Resta Apr 2019

The Timber Buckling Restrained Brace Frame, Jessica Resta

Architectural Engineering

With the increasing awareness on the topic of earthquake resistance, efficient, cost-effective, and environmentally friendly solutions in the structural field are on the rise. The purpose of this report is to investigate the Timber Buckling Restrained Brace (TBRB), a new lateral-resisting element made of steel and lumber, applicable in residential and small commercial units. In addition to the TBRBs’ materials being readily available, the braces are easy to manufacture, reducing overall costs of production and transportation. The brace, made partly of wood, has also a low environmental impact when compared to other lateral force resisting elements like concrete shearwalls or …


Post-Earthquake Assessment And Numerical Modeling Of Freestanding Heritage Structures, M. Khalid Saifullah, Christine E. Wittich Jan 2019

Post-Earthquake Assessment And Numerical Modeling Of Freestanding Heritage Structures, M. Khalid Saifullah, Christine E. Wittich

Department of Civil and Environmental Engineering: Faculty Publications

Historic and heritage structures are particularly vulnerable to earthquakes, where damage or collapse can not only lead to loss of a structure but also the loss of irreplaceable heritage. Many heritage structures can be classified as freestanding (detached) structures, including unreinforced masonry walls, classical multi-drum columns, and statue-pedestal systems. However, the seismic response of freestanding structures (sliding, rocking, rock-slide, overturning) is poorly predicted by existing methods due to geometric non-linearities as well as sensitivity to interface conditions and modeling parameters. Previous studies have focused on analytical modeling of simplified systems and/or experimentation under controlled laboratory conditions. In contrast, this paper …


Epics Gaqt: Nandi Clean Kitchen Study, Yichen Fan Dec 2018

Epics Gaqt: Nandi Clean Kitchen Study, Yichen Fan

Engagement & Service-Learning Summit

No abstract provided.


My Catalyst, Gabrielle Gambino Lyon Jul 2018

My Catalyst, Gabrielle Gambino Lyon

Celebration of Learning

Over the course of my internship and shadow program with Pepper Lawson Construction and Ziegler Cooper Architects, I was able to explore the various career paths involved in the design, construction, and civil engineering fields. My work on the construction site of a high-rise apartment building located in the heart of Houston, TX allowed me first-hand experience working and learning alongside project engineers, contractors, building developers, and the construction team.

This project was the perfect confluence of my main areas of interest: structural, mechanical, civil, and environmental engineering, as well as architecture. My daily work consisted of on-site walk throughs, …


Structural Analysis Of The High Bay Steel Reaction Frames, Jerry Hue Truong Luong, Garrett Michael Brown Jun 2018

Structural Analysis Of The High Bay Steel Reaction Frames, Jerry Hue Truong Luong, Garrett Michael Brown

Architectural Engineering

No abstract provided.


Solar And Rain Catching Canopy. Urban Oasis, Afolabi Ibitoye, Langston Clark, Elena Zimareva, Evan Banks, Alexander Aptekar May 2018

Solar And Rain Catching Canopy. Urban Oasis, Afolabi Ibitoye, Langston Clark, Elena Zimareva, Evan Banks, Alexander Aptekar

Publications and Research

The Urban Oasis is designed to work within existing “pocket parks” in New York City as a combined rainwater collector, personal electronics charging station and resting designation for New Yorkers. Intended to not only lessen the demand on the city power grid by using renewable energy to charge devices, the urban oasis is also intended to mitigate grey water overfill in New York’s combined sewer system and, in general, serve as a model for responsible environmental stewardship in urban areas.

The important technical aspects of the canopy specifically analyzed were:

a) how much rainwater could the canopy be expected to …


Highly Vented Truss Wall Honeycomb Structures, David J. Sypeck Dec 2017

Highly Vented Truss Wall Honeycomb Structures, David J. Sypeck

Publications

A vented honeycomb structure with a plurality of honeycomb cells arranged in a hierarchical order and having a plurality of truss walls, each truss wall including a plurality of members. The vented honeycomb structure is fabricated by joining a plurality of sheets of trusses using any one of an expansion, a corrugation, and a slotting process. Fabrication can also occur by deposition, casting, additive, extrusion, or aligning and joining methods. The honeycomb cells, truss walls, truss wall openings, and truss wall members can be functionally graded.


Bridge Build, Andrew Little Nov 2017

Bridge Build, Andrew Little

Student Scholarship

Bridge build design that includes not only a building process, but a research paper to make the best build possible as well.


What Lessons Can Be Learned From The Delivery Of The First Building On The Grangegorman Campus Using Building Information Management (Bim)?, Pat O'Sullivan, Avril Behan Nov 2017

What Lessons Can Be Learned From The Delivery Of The First Building On The Grangegorman Campus Using Building Information Management (Bim)?, Pat O'Sullivan, Avril Behan

Conference papers

There is an acceptance that BIM, via data management, can be integrated with FM to reduce costs during the Operations and Maintenance stage of a project. However, what has not been documented is the ‘on the ground’ reality which can be reviewed as a lessons learnt exercise to improve the implementation of BIM FM for future projects. This case study sets out to explore the realities of a client’s adoption of BIM based upon the actual experience of the Greenway Hub. Rather than relying on anecdotal evidence the research was based upon the real practices and experiences of the Dublin …


The Prevalence Of Six Sigma Trends In The Construction Industry In Pakistan, Muhammad M. Hassan Jul 2017

The Prevalence Of Six Sigma Trends In The Construction Industry In Pakistan, Muhammad M. Hassan

Masters Theses & Specialist Projects

Economic development in any country or area depends heavily on the performance of the construction industry. This is because the subsequent development of infrastructure increases economic activity, living standards, direct foreign investments, and business opportunities. The construction industry in Pakistan also plays a significant role in its economic activity, and the government’s focus towards increasing infrastructure development provides the construction industry with growth prospects. It is observed that quality management practices in the Pakistan construction industry are highly inadequate to enhance quality. The construction industry there is highly challenged with inadequate delays in projects and project quality. The need for …