Post-Project Risk Perception And Systems Management Reaction,
2010
Old Dominion University
Post-Project Risk Perception And Systems Management Reaction, Baqer Alali
Engineering Management & Systems Engineering Theses & Dissertations
The objective of this research is to identify whether risk management in projects has any role in risk management in systems. Projects, systems, and risk management are three integral concepts in the management of various enterprises and agencies. Risk management is a common concept in systems and project processes. To avoid failures or crisis during their life cycles, projects and systems managers practice risk management. Projects and systems have well defined life cycles during which the risk is defined, controlled, and managed. Risk management is conducted in each phase of projects and systems. Projects are initiated to close certain operational …
Developing A Lean Value Model For Product Development,
2010
Missouri University of Science and Technology
Developing A Lean Value Model For Product Development, Salik Yadav, Venkat Allada
Engineering Management and Systems Engineering Faculty Research & Creative Works
This paper presents a value quantification model for multistage product development using lean principles. the proposed value model considers four main stages of product development (PD) including conceptual development, systems design, detailed design and prototyping. the model determines an optimal solution for each of the design variables to maximize the value at each of the PD stages. the value at each of the PD stages is formulated as a function of the six factors: (a) importance of customer requirements (b) cost of customer's ownership, (c) parts/service availability, (d) weighted average cost of capital, (e) information evolution and (f) risk reduction. …
Validating Module Heuristics On Large Scale Products,
2010
Missouri University of Science and Technology
Validating Module Heuristics On Large Scale Products, Rachel Day, Robert B. Stone, Katie Grantham Lough
Mechanical and Aerospace Engineering Faculty Research & Creative Works
Decreasing time and costs is a major objective in many businesses today. Including modularity in the early design phases can effectively decrease time spent on and costs associated with a project. the task of identifying modules within a product early in the design process (when decisions are less expensive) is made less daunting by using the techniques of functional modeling and module heuristics. This paper discusses the results of the initial efforts to verify the module heuristics on large products (products with functional models consisting of more than 30 sub-functions) since the module heuristics were originally developed on small products. …
Testing The Test: Validity And Reliability Of Senior Exit Exam,
2010
California Polytechnic State University - San Luis Obispo
Testing The Test: Validity And Reliability Of Senior Exit Exam, Lizabeth Schlemer, Daniel Waldorf
Industrial and Manufacturing Engineering
A senior exit exam is considered an excellent direct measure of student learning for ABET assessment, but the usefulness of the information gathered is related to the validity and reliability of the test itself. The Industrial and Manufacturing Engineering Department at California Polytechnic State University, San Luis Obispo has used a content exam for several years. This paper will discuss test development, administration, and the role it plays in the assessment process. In addition, the test is evaluated using the standard psychometric techniques of reliability and validity. The results of the evaluation are used to refine the test. The importance …
Lean Inventory Management System For Boeing Missile Defense,
2010
California Polytechnic State University - San Luis Obispo
Lean Inventory Management System For Boeing Missile Defense, Danielle Partridge
Industrial and Manufacturing Engineering
Lean inventory management is influential for business. One of the wastes businesses aim to reduce, using lean principles, is inventory. Inventory management provides the essential tools for eliminating extra inventory and cost that is tied up in capital.
Boeing’s Ground Based Missile Defense inventory area was failing at meeting their proprietary lean manufacturing goals. There was a need for an inventory system that included: lean principles, inventory management and user-friendly capability. The goal of this project’s inventory management database process was to minimize inventory investment while still meeting functional requirements. The deliverables for this project met the needs of Boeing’s …
Ergonomic Methods To Improve Safety In The Construction Sector And Reduce Costs,
2010
California Polytechnic State University - San Luis Obispo
Ergonomic Methods To Improve Safety In The Construction Sector And Reduce Costs, Mona Barjasteh
Industrial and Manufacturing Engineering
Many small construction companies have difficulty providing a safe working environment for their employees because of their lack of resources. There is a need to provide a manual for small construction companies employing 10 or fewer workers with the best ergonomic solutions of the top most common injuries. Accidents in the construction field are very high with nearly 175,00o nonfatal injuries and 1,121 deaths in 2002. The nonfatal cases occur 7.1 times per 100 full time workers, while serious injuries occur 2.8 times per 100 full time workers. This information reveled the importance of focusing on minor injuries in order …
Statistical Quality Control In The Health Care Industry,
2010
California Polytechnic State University - San Luis Obispo
Statistical Quality Control In The Health Care Industry, Roberto Arce
Industrial and Manufacturing Engineering
In recognition to the increased length of stay of discharge patients, deteriorating patient care and staff satisfaction in a emergency department (ED), this project was set to improve these measures without reducing staff, adding new workers, and without increasing the number of beds. Lean methods such as value stream mapping (VSM) formed the basis of the project. This tool helped identify the patient process flow through the (ED) as well as the valued added and non-value added steps of the process. This project describes value stream map development in the emergency department at a community hospital. A current-state value stream …
An Alternative To Stretch Wrap Using Triple Bottom Line,
2010
Cal Poly State University
An Alternative To Stretch Wrap Using Triple Bottom Line, Christian Guirola
Industrial and Manufacturing Engineering
Packaging products has always been a major sector of industries. Mass producing manufacturing companies use wooden pallets to store and transport items; these products are stacked and then secured by wrapping stretch wrap around them. The main issue with this packaging method is that millions of pounds of waste is produced. Some of the other effects include green house gas emissions during its production, limited recycling, and high packaging costs. In order to reduce the amounts of stretch wrap used by industries and distribution centers, there was a need to research and evaluate alternate methods to secure products on pallets. …
Development And Assessment Of A Pcb Layout And Manufacturong Laboratory Module In Introductory Electric Circuits For Ee And Non-Ee Majors,
2010
California Polytechnic State University - San Luis Obispo
Development And Assessment Of A Pcb Layout And Manufacturong Laboratory Module In Introductory Electric Circuits For Ee And Non-Ee Majors, Albert Liddicoat, Jianbiao Pan, James G. Harris, Gary Perks, Linda Shepherd
Industrial and Manufacturing Engineering
In standard introductory electric circuits laboratories for electrical engineering (EE) majors and non-EE majors, prototype boards are typically used to construct and test electric circuits. Students typically do not learn how to design and manufacture Printed Circuit Boards (PCB) that are commonly used in more sophisticated design projects and other engineering applications. This paper will present the development and assessment of a PCB layout and manufacturing laboratory module that has been used in introductory electric circuits laboratories for EE and non-EE majors. The feasibility of integrating the new PCB layout and manufacturing module into the electric circuit course will be …
Assessing Curriculum Improvement Through Senior Projects,
2010
California Polytechnic State University - San Luis Obispo
Assessing Curriculum Improvement Through Senior Projects, Jianbiao Pan, Albert Liddicoat, James G. Harris, Linda Shepherd
Industrial and Manufacturing Engineering
Senior project and/or capstone design courses are intended to provide a culminating design experience for students and to demonstrate their understanding of engineering knowledge and their ability to apply that knowledge to practical problems. It is expected that the quality and attributes of students’ senior design projects can be used as a good measure of determining how well the curriculum prepares students to engage in engineering design as well as a measure of faculty teaching and student learning. This paper reports the results of a study designed to assess whether the new computer engineering curriculum implemented at Cal Poly over …
Increasing Production Capacity At A Start Up Biomedical Company,
2010
California Polytechnic State University - San Luis Obispo
Increasing Production Capacity At A Start Up Biomedical Company, Traci J. Otsuji
Industrial and Manufacturing Engineering
The following senior project was first introduced during a summer internship at a biomedical company called Asthmatx Inc. Asthmatx is responsible for the development and manufacturing of a catheter‐based device for moderate to severe cases of asthma. Upon the approval of FDA, Asthmatx had planned to ramp up their production capacity significantly in order to accommodate the potential growth.
The first step in the process improvement was a facility reconfiguration that involved the adjustment of process sequencing and the implementation of ergonomic catheter channels. Next, time studies were conducted to gain more accurate time standards of the production process. After …
Process Improvement For The Department Of Surgery Sierra Vista Medical Center,
2010
California Polytechnic State University - San Luis Obispo
Process Improvement For The Department Of Surgery Sierra Vista Medical Center, Jessica Paz
Industrial and Manufacturing Engineering
This report proposes and analyzes process improvement methods for the Surgical Services Department at Sierra Vista Regional Medical Center. The department currently operates with an average of 25% of elective cases starting on time. This can be attributed to a number of inefficiencies that occur throughout the hospital.
The following Industrial Engineering methods were utilized to improve patient flow: creation of a data collection system to quantify delays use of simulation and facility redesign techniques to determine feasibility and benefits of moving towards a surgical center model development of a user interfaced database to record and analyze …
Police Operations Simulation,
2010
California Polytechnic State University - San Luis Obispo
Police Operations Simulation, Robert Mcgee
Industrial and Manufacturing Engineering
In this report, the author explains the process of creating the Police Operations Simulation, shows step-by-step how it works, and statistically analyzes the results from SLOPD’s own proposed and current schedules. The data-gathering from the department and the simulation itself will receive the bulk of the coverage in this report, followed by sample results from SLOPD and a business plan for future sale to other departments.
Using the given numbers, it appears that the proposed schedule will result in significantly improved coverage for the city of San Luis Obispo. While any increase in the number officers on patrol tends to …
Mapping The Medical Device Development Process,
2010
California Polytechnic State University - San Luis Obispo
Mapping The Medical Device Development Process, Scott T. Ham
Industrial Technology and Packaging
This project examined the use of process mapping as a tool to show the process of developing medical devices from a broad perspective that includes research, innovation, development, regulation, and marketing. The medical device development cycle, on a broad scope, is not well defined. The lack of a universal language with which to describe this process has made it difficult to understand and communicate. In this project, data was collected from peer-reviewed sources, summarized in a literature review, drawn out by hand into a series of lower-level process maps and finally assembled into a single process map. This project is …
Maintenance Service Request Process Optimization For The Cliffs Resort At Shell Beach,
2010
Cal Poly State University
Maintenance Service Request Process Optimization For The Cliffs Resort At Shell Beach, John Birch
Industrial and Manufacturing Engineering
This process optimization project utilizes a new idea to have an Access 2007 database automatically send a text message to a given cellular telephone. The hotel’s maintenance service request process is outdated and inefficient, relying solely on paper and human memory for success. Initiation, tracking, and recording the maintenance service requests need to be automated to optimize this process. The solution is a working database which employs said automation using Access 2007 in combination with a separate program created to facilitate the automatic text messaging. Implementing this database will result in higher customer satisfaction for the hotel.
Ground Support Equipment For Northrop Grumman Massive Heat Transfer Experiment,
2010
California Polytechnic State University, San Luis Obispo
Ground Support Equipment For Northrop Grumman Massive Heat Transfer Experiment, Michael A. Manuel, Christopher J. Sparber, Greg A. Trent
Aerospace Engineering
California Polytechnic State University students designed, built, and certified ground support equipment for the Northrop Grumman Massive Heat Transfer Experiment. The Cal Poly design team built the 10000, 20000, and 30000 assemblies to meet Northrop Grumman requirements. The requirements included interface limitations, design load factors, delivery, and testing specifications. The design process consists of requirements generation, conceptual design, preliminary design, design reviews, manufacturing, and certification. The hardware was successfully completed and is used at the Johnson Space and Kennedy Space Center.
Irrigation Leak Detection: Using Flow Rate Sensors To Detect Breaks In An Irrigation System,
2010
California Polytechnic State University - San Luis Obispo
Irrigation Leak Detection: Using Flow Rate Sensors To Detect Breaks In An Irrigation System, Adam Openshaw, Kalvin Vu
Computer Engineering
This report details the exploration and invention of a mechanism that can detect breaks in an irrigation system. With the ultimate goal of conserving water, we have designed an inexpensive, self sustaining flow rate monitor that can be used to identify anomalies in an irrigation system and wirelessly communicate the status of the system to a base station. Our implementation can also determine the direction of the anomaly based on the nature of the anomaly itself. This means that multiple monitors can be used to pinpoint the location of a break within the system in addition to merely detecting its …
Multi-Robot System Control Architecture (Mrsca) For
Agricultural Production,
2010
University of Nebraska-Lincoln
Multi-Robot System Control Architecture (Mrsca) For Agricultural Production, Santosh Pitla, Joe D. Luck, Scott A. Shearer
Department of Agricultural and Biological Systems Engineering: Presentations and White Papers
Coordinating multiple autonomous robots for achieving an assigned collective task presents a complex engineering challenge. In this paper multi robot system control architecture (MRSCA) for the coordination of multiple agricultural robots is developed. The two important aspects of MRSCA; coordination strategy and inter-robot communication were discussed with typical agricultural tasks as examples. Classification of MRS into homogeneous and heterogeneous robots was done to identify appropriate form of cooperative behavior and inter-robot communication. The framework developed, proposes that inter-robot communication is not always required for a MRS. Three types of cooperative behaviors; No-cooperation, modest cooperation and absolute cooperation for a MRS …
Acuta Enews June 2010, Vol 39, No. 6,
2010
University of Nebraska - Lincoln
Acuta Enews June 2010, Vol 39, No. 6
ACUTA Newsletters
In this Issue
Extremely Strong Program Planned for San Francisco Seminar
From the President..........Matt Arthur, Washington Univ. in St. Louis, ACUTA President
Can Wireless Replace the RSTN?.... Gary Audin, Delphi, lnc.
Add Names from Your Campus to Your ACUTA Roster
Multi-Event Discount: Attend More in 2010 and Save More!
ACUTA Resources Are Better than Ever
Hurricane Preparedness Checklist
FYI: Useful lnformation from the Campus...................Student Monitor
Board Report............ George Denbow, Univ. of Texas, ACUTA Secretary/Treasurer
lnfo Links .......... Randy Hoyes, Univ of Northern lowa
Washington Update Newsletter
Welcome New Members
Check lt Out: Press Releases...Job Postings...RFls/RFPs...Special Deals
An Evaluation Of The Ability Of Rfid Tags To Withstand Distribution Of Fresh Produce In The Rpc Pooling System,
2010
California Polytechnic State University - San Luis Obispo
An Evaluation Of The Ability Of Rfid Tags To Withstand Distribution Of Fresh Produce In The Rpc Pooling System, Jay A. Singh, S. P. Singh, K. Desautels, K. Saha, E. Olsen
Industrial Technology and Packaging
This study focused on the ability of radio frequency identification (RFID) tags applied on reusable plastic containers (RPCs) to withstand repeated abuse due to physical distribution and storage environment related hazards. It also studied the effect of the chemical cleaning environments that RPCs are commonly exposed to in the pooling/rental systems commonly used to distribute fresh produce. RPCs are being successfully deployed in the US, Europe and Asia to ship fresh produce from growers to retailers. The increasing demand for traceability and tracking of fresh produce from ‘farm to fork’ requires these containers to be monitored and identified in the …
