Open Access. Powered by Scholars. Published by Universities.®
![Digital Commons Network](http://assets.bepress.com/20200205/img/dcn/DCsunburst.png)
Physical and Environmental Geography Commons™
Open Access. Powered by Scholars. Published by Universities.®
- Keyword
- Publication Type
Articles 1 - 4 of 4
Full-Text Articles in Physical and Environmental Geography
Quantifying Spatial Heterogeneity Of Wild Blueberries And Crop Water Stress Monitoring Using Remote Sensing Technologies, Kallol Barai
Quantifying Spatial Heterogeneity Of Wild Blueberries And Crop Water Stress Monitoring Using Remote Sensing Technologies, Kallol Barai
Electronic Theses and Dissertations
The wild blueberry is one of the major crops of Maine, with significant economic value and potential health benefits. Due to global climate change, drought impacts have been increasing significantly in recent years in the northeast region of the USA, causing significant economic losses in the agricultural sectors. It has been predicted to increase further in the future. Changing patterns of the elevated atmospheric temperatures, increased rainfall variabilities, and more frequent drought events have made the wild blueberry industry of Maine vulnerable, suggesting the adoption of novel approaches to mitigate the negative impacts of global climate changes. Also, wild blueberry …
Fish And Wildlife Mitigation Report : Dickey-Lincoln School Lakes Project, Maine, New England Division, Corps Of Engineers, U. S. Army Engineer Division
Fish And Wildlife Mitigation Report : Dickey-Lincoln School Lakes Project, Maine, New England Division, Corps Of Engineers, U. S. Army Engineer Division
Dickey-Lincoln School Lakes Project
The Dickey Lincoln School Lakes Project is a proposed multipurpose project located on the upper reaches of the St. John River in Aroostook County, Maine. Development would consist of two dams with associated reservoirs and hydroelectric generating facilities, five dikes and transmission lines. A more detailed description of the proposed project and its associated impacts is contained within the Revised Draft Environmental Impact Statement for the proposed project.
Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix A, United States Department Of Energy
Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix A, United States Department Of Energy
Dickey-Lincoln School Lakes Project
The U.S. Departments of the Interior and Energy have conducted system planning, location, and environmental studies for the trans-mission facilities required for the Dickey-Lincoln School Hydroelectric Project. These studies of many alternate routes have resulted in iden-tification of a proposed transmission line route, and an environmental impact statement, as required by the National Environmental Policy Act of 1969. This report, documenting an early phase of the overall studies, was first published by the Department of the Interior in February 1977. It is being republished as Appendix A to the DOE Environmental Impact Statement for the project.
Revised Draft Impact Statement Issued For Dickey-Lincoln, New England Division, United States Army Corps Of Engineers
Revised Draft Impact Statement Issued For Dickey-Lincoln, New England Division, United States Army Corps Of Engineers
Dickey-Lincoln School Lakes Project
The revised draft combines data previously published in two separate impact statements prepared by the Corps relating to the dams, reservoirs and Power Plants and by the U. S. Department of Energy for transmission facilities to link the St. John River development to the New England power grid.