Dickey-Lincoln School Lakes Project At Dickey, Maine : Final Environmental Impact Statement, New England Division, United States Army Engineer Division Jan 1981

Dickey-Lincoln School Lakes Project At Dickey, Maine : Final Environmental Impact Statement, New England Division, United States Army Engineer Division

Dickey-Lincoln School Lakes Project

The Final Impact Statement is supported by all appendices from all drafts as well as supplementary information provided in Supplements to those Appendices. It comprises three volumes. Volume I is the statement volume. Volume II consists of two parts. Part I contains the comment and response portion of Section 9 for the 1977 Draft EIS. Part II contains comments and responses on the 1978 Revised Draft EIS, in addition to reproductions of the original comment letters received on the Draft Fish and Wildlife Mitigation Report and responses to these comments. Volume III, Part I contains reproductions of the original comment …


Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix K: Fish & Wildlife Mitigation Plan & Impacts (Revised), New England Division, United States Army Engineer Division Jan 1980

Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix K: Fish & Wildlife Mitigation Plan & Impacts (Revised), New England Division, United States Army Engineer Division

Dickey-Lincoln School Lakes Project

The proposed plan is comprised of three major segments: terrestrial, fisheries and endangered species. Each segment is essentially a self-contained unit. All costs for the three segments including land acquisition, operation and maintenance and capital equipment, are to be charged to the project and allocated to the project purposes of hydroelectric generation and flood control.


Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix A: Geology And Seismology (Supplement), Walter A. Anderson, New England Division, United States Army Engineer Division Jan 1980

Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix A: Geology And Seismology (Supplement), Walter A. Anderson, New England Division, United States Army Engineer Division

Dickey-Lincoln School Lakes Project

The plan was prepared for a close working relationship between the evaluation teams and the immediate availability of geochemical and geophysical data to the geologic mapping team. Those samples determined in the field to be anomalously high in heavy metals by cold extractable procedures were sent to North American Laboratories where metal content determinations were made through: atomic absorption and spectrophotometry after hot acid digestion techniques.


Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix F: Terrestrial Ecosystem Analysis (Supplement), New England Division, United States Army Engineer Division Jan 1978

Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix F: Terrestrial Ecosystem Analysis (Supplement), New England Division, United States Army Engineer Division

Dickey-Lincoln School Lakes Project

Construction of the proposed Dickey-Lincoln School Lakes Project in Aroostook County, Maine will result in the isolation of an area of land due to the impoundment behind Dickey Dam. This land area is located between the United States - Canadian border, the Little Black River, the impoundment (elevation = 913 feet), the Big Black River, and the Shields Branch of the Big Black River, and comprises 183,768 acres of land. A previous report (ERT, 1977) determined the forest types within two miles of the impoundment but did not extend to the Canadian border. This report addresses the forest types


Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix E: Aquatic Ecosystem And Fisheries Studies (Supplement), Christoipher J. Schmitt, Dennis R. Sasseville, Normandeau Associates, Inc., New England Division, United States Army Engineer Division Jan 1978

Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix E: Aquatic Ecosystem And Fisheries Studies (Supplement), Christoipher J. Schmitt, Dennis R. Sasseville, Normandeau Associates, Inc., New England Division, United States Army Engineer Division

Dickey-Lincoln School Lakes Project

Sediment mercury concentrations higher than levels normall y considered trace or background were encountered up to 80 cm belo w the sediment-water interface in samples obtained from four oligotrophi c lakes in northern Maine . These lakes are in three different watershed s and are as far as 65 km apart . The values reported are far lower than levels reported elsewhere from contaminated sites . The distributio n and magnitude of the sediment concentrations encountered suggest long-ter m diffuse mercury inputs to the lakes from the watersheds . In addition , concentrations up to twice as high in near-surface …


Dickey-Lincoln School Lakes Project: Transmission System Planning Study, United States Department Of The Interior Jan 1977

Dickey-Lincoln School Lakes Project: Transmission System Planning Study, United States Department Of The Interior

Dickey-Lincoln School Lakes Project

The purpose of this report is to investigate various transmission system alternatives and recommend a plan of service to integrate power from the Dickey-Lincoln School Lakes (D-L) Project into the New England electric power transmission system.


Dickey-Lincoln School Lakes Project Power Alternatives Study : Task 2 Report, Acres American Incorporated Jan 1977

Dickey-Lincoln School Lakes Project Power Alternatives Study : Task 2 Report, Acres American Incorporated

Dickey-Lincoln School Lakes Project

This report presents the results of Task 2 of this study, the overall purpose of which is the evaluation of alternative methods of providing electrical energy in New England in lieu of the Dickey-Lincoln hydroelectric project. The final Task 1 report was presented in July 1976 and will, in conjunction with this Task 2 and subsequent Tasks 3 and 4 reports, ultimately become part of the "Environmental Impact Statement" for the Dickey-Lincoln Project.


Dickey-Lincoln School Lakes Project Power Alternatives Study Draft Report : Task 1 Through 4, Acres American Incorporated Jan 1977

Dickey-Lincoln School Lakes Project Power Alternatives Study Draft Report : Task 1 Through 4, Acres American Incorporated

Dickey-Lincoln School Lakes Project

This report presents the detailed findings of Tasks 1 through 4 of the Dickey-Lincoln School Lakes Project Power Alternatives Study undertaken for the New England Division of the Corps of Engineers, by Acres American Incorporated, Consulting Engineers of Buffalo, New York under the terms of Contract Number DACW33-76-C-0047. Earlier reports on Task 1 dated July 1976, on Task 2 dated January 1977 and on Task 3 dated March 1977 have been incorporated virtually unchanged into this Task 4 report.


Dickey-Lincoln School Lakes Project Power Alternatives Study : Task 1 Report, Acres American Incorporated Jan 1976

Dickey-Lincoln School Lakes Project Power Alternatives Study : Task 1 Report, Acres American Incorporated

Dickey-Lincoln School Lakes Project

This report presents the results of Task 1 of a study undertaken by Acres American Incorporated to evaluate alternative methods of providing electrical energy in lieu of the Dickey-Lincoln School Lakes Project. It is understood that this report will ultimately become part of the "Environmental Impact Statement" for the project.


Recommendations Of Alternative System Plans And Transmission Corridors For The Dickey/Lincoln School Hydroelectric Project, Vtn Environmental Sciences (Firm), Interior Jan 1976

Recommendations Of Alternative System Plans And Transmission Corridors For The Dickey/Lincoln School Hydroelectric Project, Vtn Environmental Sciences (Firm), Interior

Dickey-Lincoln School Lakes Project

The regional scope of this study (a three state area of approximately 33,000 square miles) necessitated an initial investigation to determine what data was available. Known and potential sources of data were identified through the use of the Environmental Data Reconnaissance Report* prepared by Comitta Frederick Associates for the United States Depart-ment of the Interior in March 1976. The collected data was then analyzed for its accuracy, reliability, mappability and compatibility with the scope of this study.