Open Access. Powered by Scholars. Published by Universities.®
- Keyword
-
- Dams (2)
- Hydroelectric power plants (2)
- Maine (2)
- Water resources development (2)
- Aquatic pollution (1)
-
- Aroostook (1)
- Aroostook County (1)
- Benthic organisms (1)
- Design and construction (1)
- Electric lines (1)
- Energy policy (1)
- Environmental impact statements (1)
- Freshwater plankton (1)
- Freshwater pollution (1)
- Lake Mead (Ariz. and Nev.) (1)
- Saint John River Valley (Me. and Quebec) (1)
- Saint John River Valley (Me. and Québec) (1)
- Water treatment (1)
Articles 1 - 3 of 3
Full-Text Articles in Fresh Water Studies
Report On Wastewater Disposal To Board Of County Commissioners, Clark County Nevada, Clair N. Sawyer
Report On Wastewater Disposal To Board Of County Commissioners, Clark County Nevada, Clair N. Sawyer
Publications (WR)
This report is concerned with the management of waste-waters and subsurface drainage from the City of Las Vegas and its environs and the BMI complex, all in Clark County, Nevada. The prime objective is to recommend a plan of action which will utilize the natural resources of the area in the least costly manner and still protect Lake Mead for recreational purposes and use as a public water supply, At this writing, conditions in the upper Las Vegas arm of Boulder Basin are quite unsatisfactory for some recreational purposes due to the extensive blooms of algae which develop. Experience at …
Transmission Planning Summary : Dickey-Lincoln School Lakes Project Transmission Studies, United States Department Of Interior
Transmission Planning Summary : Dickey-Lincoln School Lakes Project Transmission Studies, United States Department Of Interior
Dickey-Lincoln School Lakes Project
This report summarizes the results of system planning, environmental, and location studies for transmission facilities associated with the proposed Dickey-Lincoln School Lakes Project in northern Maine. The studies recommend the construction of two 345-kV transmission circuits from a substation near the project along a route through western Maine into northern New Hampshire and Vermont. The plan will integrate the power produced by the project into the New England Power Pool Transmission System. Five alternate integration plans were identified and studied. Of the five plans, the recommended plan, which calls for the lines to be suspended from a single row of …
Water Resources Development Project, Saint John River Basin : Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada : Design Memorandum No. 2 : Hydrology And Hydraulic Analysis, Section Iv - Lincoln School Dam-Spillway Design Flood, Department Of The Army, New England Division, Corps Of Engineers
Water Resources Development Project, Saint John River Basin : Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada : Design Memorandum No. 2 : Hydrology And Hydraulic Analysis, Section Iv - Lincoln School Dam-Spillway Design Flood, Department Of The Army, New England Division, Corps Of Engineers
Dickey-Lincoln School Lakes Project
The first of four sections comprising Design Memo-randum No. 2. The other sections are: II - Dickey Dam - Spillway Design Flood, III - Lincoln School Dam - Spillway Design Flood and IV - Flood Analysis and Reservoir Regulation. la section I, hydro-logic studies will be confined generally to the drainage area of the Saint John River above the gaging station at Fort Kent, Maine. The purpose of section I is to present the climatological and streamflow data for the Saint John River above Fort Kent in order to establish hydrologic criteria for the design of the Dickey and Lincoln …