Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring Commons

Open Access. Powered by Scholars. Published by Universities.®

Environmental Health and Protection

Series

Institution
Keyword
Publication Year
Publication
File Type

Articles 1 - 30 of 1524

Full-Text Articles in Environmental Monitoring

What Climate Change Means For Nebraska May 2024

What Climate Change Means For Nebraska

United States Environmental Protection Agency: Staff Publications

Nebraska’s climate is changing. In the past century, most of the state has warmed by at least one degree (F). The soil is becoming drier, and rainstorms are becoming more intense. In the coming decades, flooding is likely to increase, yet summers are likely to become increasingly hot and dry, which would reduce yields of some crops, require farmers to use more water, and amplify some risks to human health.

Our climate is changing because the earth is warming. People have increased the amount of carbon dioxide in the air by 40 percent since the late 1700s. Other heat-trapping greenhouse …


Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #11: Ur-49 And Ur-50, Atlantic Richfield Company May 2024

Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #11: Ur-49 And Ur-50, Atlantic Richfield Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2024 Draft Final Insufficiently Reclaimed Areas Quality Assurance Project Plan (Qapp) (Dated March 8, 2024), Molly Roby May 2024

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2024 Draft Final Insufficiently Reclaimed Areas Quality Assurance Project Plan (Qapp) (Dated March 8, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Repository Screening Report, Pioneer Technical Services, Inc. May 2024

Final Repository Screening Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Butte Priority Soils Operable Unit Repository Screening Report, Pioneer Technical Services, Inc. May 2024

Final Butte Priority Soils Operable Unit Repository Screening Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Bpsou Subdrain Data Summary Report (Dsr), Pioneer Technical Services, Inc. May 2024

Draft Final 2023 Bpsou Subdrain Data Summary Report (Dsr), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Seasonal Comparison Of Air Quality Variables And Evaluation Of Carbon Dioxide And Particulate Measurement Period In Classrooms, Daud Nosham May 2024

Seasonal Comparison Of Air Quality Variables And Evaluation Of Carbon Dioxide And Particulate Measurement Period In Classrooms, Daud Nosham

Durham School of Architectural Engineering and Construction: Dissertations, Thesis, and Student Research

Indoor air quality and thermal environmental variables were measured in 55 classrooms in the mid-western United States spanning a full academic year. The studied air quality and environmental factors included carbon dioxide, temperature, relative humidity, particle counts, air velocity, formaldehyde, total volatile organic compounds, carbon monoxide, nitrogen dioxide, and ozone.

Carbon dioxide and Particulate matter concentrations were measured for a four-day measurement period. Then one-day, two-day, and four-day occupied time average concentrations were calculated which were then compared statistically to figure out an appropriate measurement period for these air quality variables. Kruskal Wallis test and Wilcoxon test were used to …


Understanding The Connection Between Water, Fish, And Pfas Concentrations: Implications Of Fish Diet And Species-Specific Variability, Ece Yeldan May 2024

Understanding The Connection Between Water, Fish, And Pfas Concentrations: Implications Of Fish Diet And Species-Specific Variability, Ece Yeldan

Honors College

Perfluoroalkyl and polyfluoroalkyl substances, commonly known as PFAS or “forever chemicals,” have emerged as a significant concern for both human health and the environment. These persistent compounds permeate various aspects of commerce, leading to widespread exposure and the cycling of these compounds through environmental feedback routes. Among the sources of exposure to humans, fish consumption stands out prominently. Recreational and sustenance fishing, cherished by Maine residents and indigenous communities alike, underscores the need to comprehend PFAS dynamics in fish and water. To explore the variability of PFAS accumulation in fish, water, and sediment, I conducted a comprehensive literature review. The …


Draft Final Revised Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Residential Parcels), Pioneer Technical Services, Inc. Apr 2024

Draft Final Revised Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Residential Parcels), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2024 Residential Metals Abatement Program (Rmap) Baptist Student Union (Former Mckinley School) Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Apr 2024

Final 2024 Residential Metals Abatement Program (Rmap) Baptist Student Union (Former Mckinley School) Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2021 Residential Metals Abatement Program (Rmap) Head Start (Former Lincoln School) Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc. Apr 2024

Draft Final 2021 Residential Metals Abatement Program (Rmap) Head Start (Former Lincoln School) Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plans (Fsps) And Final Unreclaimed Sites Fsps Request For Change Ur/Ir 2024-001, Mike Mcanulty Apr 2024

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plans (Fsps) And Final Unreclaimed Sites Fsps Request For Change Ur/Ir 2024-001, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2021-2022 Residential Metals Abatement Program (Rmap) Aware Early Head Start Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc. Apr 2024

Draft Final 2021-2022 Residential Metals Abatement Program (Rmap) Aware Early Head Start Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plans (Fsps) And Final Unreclaimed Sites Fsps Request For Change Ur/Ir 2024-001, Mike Mcanulty Apr 2024

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plans (Fsps) And Final Unreclaimed Sites Fsps Request For Change Ur/Ir 2024-001, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Berkely Pit Repository Cost Comparison, Josh Bryson Apr 2024

Berkely Pit Repository Cost Comparison, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites Final Ur Field Sampling Plan (Fsp) Submittal #4 – Request For Change (Rfc) -Ur Fsp #4-001., Mike Mcanulty Apr 2024

Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites Final Ur Field Sampling Plan (Fsp) Submittal #4 – Request For Change (Rfc) -Ur Fsp #4-001., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek Conservation Area (Sbcca) 60% Technical Specifications Submittal, Josh Bryson Apr 2024

Silver Bow Creek Conservation Area (Sbcca) 60% Technical Specifications Submittal, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) Silver Bow Montessori, Christopher Berg, Thomas J. Beckman, Environmental Resource Management (Erm) Apr 2024

Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) Silver Bow Montessori, Christopher Berg, Thomas J. Beckman, Environmental Resource Management (Erm)

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Diggings East 60% Remedial Design Package Submittal, Josh Bryson Apr 2024

Butte Priority Soils Operable Unit Diggings East 60% Remedial Design Package Submittal, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Residential Metals Abatement Program – Interior School Dust – Investigation Summary Report – After The Bell Child Care Center, Thomas J. Beckman, Christopher Berg, Environmental Resource Management (Erm) Apr 2024

Residential Metals Abatement Program – Interior School Dust – Investigation Summary Report – After The Bell Child Care Center, Thomas J. Beckman, Christopher Berg, Environmental Resource Management (Erm)

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) Small World Day Care, Environmental Resource Management (Erm) Apr 2024

Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) Small World Day Care, Environmental Resource Management (Erm)

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comments On The Repository And Haul Route Geotechnical Pre-Design Investigation Work Plan (Dated March 29, 2024), Repository And Proposed Haul Route – Silver Bow Creek Conservation Area Quality Assurance Project Plan (Dated March 29, 2024), And Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan (Dated March 22, 2024), Emma Rott Apr 2024

Re: Comments On The Repository And Haul Route Geotechnical Pre-Design Investigation Work Plan (Dated March 29, 2024), Repository And Proposed Haul Route – Silver Bow Creek Conservation Area Quality Assurance Project Plan (Dated March 29, 2024), And Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan (Dated March 22, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Residential Metals Abatement Program Construction Completion Report Kennedy Elementary, Christopher Berg, Thomas J. Beckman, Environmental Resource Management (Erm) Apr 2024

Residential Metals Abatement Program Construction Completion Report Kennedy Elementary, Christopher Berg, Thomas J. Beckman, Environmental Resource Management (Erm)

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2024 Butte Priority Soils Operable Unit Helehan Borrow Submittal #2, Pioneer Technical Services, Inc. Apr 2024

Final 2024 Butte Priority Soils Operable Unit Helehan Borrow Submittal #2, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) United Congregational Church (Crayon Academy Preschool), Environmental Resource Management (Erm) Apr 2024

Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) United Congregational Church (Crayon Academy Preschool), Environmental Resource Management (Erm)

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #10: Ur-44, Ur-45, Ur-46, Ur-47, And Ur-48, Mike Mcanulty Apr 2024

Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #10: Ur-44, Ur-45, Ur-46, Ur-47, And Ur-48, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Technical Specifications - Silver Bow Creek Conservation Area - 60% Submittal April 2024, Atlantic Richfield Company Apr 2024

Technical Specifications - Silver Bow Creek Conservation Area - 60% Submittal April 2024, Atlantic Richfield Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments For The Butte Priority Soils (Bpsou) Residential Metals Abatement Program (Rmap) – Interior School Dust – Investigation Summary Report – Gold Hill Lutheran (Dated February 5, 2024), Molly Roby Mar 2024

Comments For The Butte Priority Soils (Bpsou) Residential Metals Abatement Program (Rmap) – Interior School Dust – Investigation Summary Report – Gold Hill Lutheran (Dated February 5, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Repository And Haul Route Geotechnical Pre-Design Investigation (Pdi) Work Plan, Jacobs Engineering Group Mar 2024

Repository And Haul Route Geotechnical Pre-Design Investigation (Pdi) Work Plan, Jacobs Engineering Group

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) East Middle School, Christopher Berg, Thomas J. Beckman Mar 2024

Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) East Middle School, Christopher Berg, Thomas J. Beckman

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.