Open Access. Powered by Scholars. Published by Universities.®

Aquaculture and Fisheries Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 3 of 3

Full-Text Articles in Aquaculture and Fisheries

Assessment Of Salmon Habitat On The Feather River, Nathan Sweem Aug 2014

Assessment Of Salmon Habitat On The Feather River, Nathan Sweem

STAR Program Research Presentations

Human activity in central valley streams has had a significantly negative impact on salmon habitat (Williams 2006). The presence of dams impedes sediment transport which is critical to salmon spawning (Williams 2006; Kondolf 1997). As part of an effort to enhance salmon spawning, the California Department of Water Resources added 7000 ft3 of gravel to Cottonwood Hatchery, Upper Auditorium, and Auditorium riffles on the Lower Feather River below the Thermalito Dam Complex in July of 2014. Stream conditions at Cottonwood Hatchery riffle were assessed by conducting analysis of sediment grain size, water depth and velocity, gravel permeability, and dissolved …


Bulletin No. 37: Living Resources And Habitats Of The Lower Connecticut River, Glenn D. Dreyer, Marcianna Caplis Dec 2001

Bulletin No. 37: Living Resources And Habitats Of The Lower Connecticut River, Glenn D. Dreyer, Marcianna Caplis

Bulletins

No abstract provided.


Transmission Reconnaissance Study : Dickey-Lincoln School Lakes Project, United States Department Of Interior Jan 1977

Transmission Reconnaissance Study : Dickey-Lincoln School Lakes Project, United States Department Of Interior

Dickey-Lincoln School Lakes Project

Two dams are proposed on the St. John River in northern Maine: Dickey, a high earth filled dam immediately above the confluence of the Allagash with the St. John, will have an installed generating capacity of 760 MW; and Lincoln School Dam, 11 miles downstream, a capacity of 70 MW. These dams are scheduled for completion during the mid 1980's. The U.S. Corps of Engineers, New England Division, has been allocated funds to design the project and prepare their own environmental impact statement. This report (Transmission Reconnaissance Studies) discusses alternative transmission facilities needed to connect the project with the New …