Open Access. Powered by Scholars. Published by Universities.®
- Keyword
-
- Environmental impact statements (3)
- Colorado River (Colo.-Mexico) (2)
- Hydrodynamics (2)
- Hydroelectric power plants (2)
- Phytoplankton (2)
-
- Allagash River Watershed (1)
- Aroostook County (Me.) (1)
- Benthic organisms (1)
- Black Canyon (Ariz. –Nev.) (1)
- Energy policy (1)
- Fishery management (1)
- Forests and forestry (1)
- Freshwater fishes (1)
- Freshwater phytoplankton (1)
- Lake Mead (Ariz. -Nev.) (1)
- Lake Mohave (Ariz.) (1)
- Limnology (1)
- Maine (1)
- Periphytons (1)
- Saint John River Valley (Me. and N.B.) (1)
- Saint John River Valley (Me. and Québec) Maine (1)
- Water (1)
- Water currents (1)
- Water quality (1)
- Water temperature (1)
- Wildlife management (1)
- Zooplankton (1)
Articles 1 - 6 of 6
Full-Text Articles in Aquaculture and Fisheries
Evaluation Of Impacts Associated With Reregulation Of Water Levels In Lake Mohave, Larry J. Paulson, John R. Baker, U.S. Water And Power Resources Service
Evaluation Of Impacts Associated With Reregulation Of Water Levels In Lake Mohave, Larry J. Paulson, John R. Baker, U.S. Water And Power Resources Service
Publications (WR)
The U.S. Water and Power Resources Service is considering reregulating Lake Mohave water levels to increase the net power benefit from Hoover Dam. Reregulation will not increase the generation capacity of the Hoover powerplant but it will enable the plant operation to be increased when the energy has greater monetary value. Energy generated at different times of the year has different market value, the highest being in January-March and July- September. By generating more power during these periods more net monetary benefit can be derived from Hoover Dam. The total volume of water released from Hoover Dam over an annual …
Dickey-Lincoln Mitigation Plans Under Review By Engineer Board, Engineering Board, New England Division
Dickey-Lincoln Mitigation Plans Under Review By Engineer Board, Engineering Board, New England Division
Dickey-Lincoln School Lakes Project
Plans to mitigate wildlife habitat and fisheries losses resulting from construction of the proposed 830-megawatt Dickey-Lincoln School hydroelectric project have been forwarded for Independent review by the Board of Engineers for Rivers and Harbors, an arm of the U.S. Army Corps of Engineers.
Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix K: Fish & Wildlife Mitigation Plan & Impacts (Revised), New England Division, United States Army Engineer Division
Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix K: Fish & Wildlife Mitigation Plan & Impacts (Revised), New England Division, United States Army Engineer Division
Dickey-Lincoln School Lakes Project
The proposed plan is comprised of three major segments: terrestrial, fisheries and endangered species. Each segment is essentially a self-contained unit. All costs for the three segments including land acquisition, operation and maintenance and capital equipment, are to be charged to the project and allocated to the project purposes of hydroelectric generation and flood control.
Federal Water Pollution Control Act Section "404" Evaluation For Dickey-Lincoln School Lakes, New England Division, United States Army Engineer Division, United States Army Corps Of Engineers
Federal Water Pollution Control Act Section "404" Evaluation For Dickey-Lincoln School Lakes, New England Division, United States Army Engineer Division, United States Army Corps Of Engineers
Dickey-Lincoln School Lakes Project
The purpose of this report is to relate various aspects of the proposed Dickey-Lincoln School Lakes Hydroelectric Project to appropriate considerations defined by Section 404 of the Federal Water Pollution Control Act of 1972.
Fish And Wildlife Mitigation Report : Dickey-Lincoln School Lakes Project, Maine, New England Division, Corps Of Engineers, U. S. Army Engineer Division
Fish And Wildlife Mitigation Report : Dickey-Lincoln School Lakes Project, Maine, New England Division, Corps Of Engineers, U. S. Army Engineer Division
Dickey-Lincoln School Lakes Project
The Dickey Lincoln School Lakes Project is a proposed multipurpose project located on the upper reaches of the St. John River in Aroostook County, Maine. Development would consist of two dams with associated reservoirs and hydroelectric generating facilities, five dikes and transmission lines. A more detailed description of the proposed project and its associated impacts is contained within the Revised Draft Environmental Impact Statement for the proposed project.
Influence Of Dredging And High Discharge On The Ecology Of Black Canyon, Larry J. Paulson, Theron G. Miller, John R. Baker, U.S. Water And Power Resources Service
Influence Of Dredging And High Discharge On The Ecology Of Black Canyon, Larry J. Paulson, Theron G. Miller, John R. Baker, U.S. Water And Power Resources Service
Publications (WR)
The Water and Power Resources Service is considering dredging in Black Canyon to create a larger forebay to accommodate higher peak discharges and reverse flows for proposed modifications to Hoover Dam.
The Black Canyon area from Hoover Dam to Willow Beach supports a heavily utilized trout fishery and is important habitat for the razorback sucker (Xyrauchen texanus) and possibly bonytail chub (Gila elegans).
The Water and Power Resources Service initiated this investigation to determine what effect dredging and higher peak-discharges would have on the ecology of Black Canyon.