Open Access. Powered by Scholars. Published by Universities.®
Other Operations Research, Systems Engineering and Industrial Engineering Commons™
Open Access. Powered by Scholars. Published by Universities.®
Articles 1 - 3 of 3
Full-Text Articles in Other Operations Research, Systems Engineering and Industrial Engineering
Augmenting The Space Domain Awareness Ground Architecture Via Decision Analysis And Multi-Objective Optimization, Albert R. Vasso, Richard G. Cobb, John M. Colombi, Bryan D. Little, David R. Meyer
Augmenting The Space Domain Awareness Ground Architecture Via Decision Analysis And Multi-Objective Optimization, Albert R. Vasso, Richard G. Cobb, John M. Colombi, Bryan D. Little, David R. Meyer
Faculty Publications
Purpose — The US Government is challenged to maintain pace as the world’s de facto provider of space object cataloging data. Augmenting capabilities with nontraditional sensors present an expeditious and low-cost improvement. However, the large tradespace and unexplored system of systems performance requirements pose a challenge to successful capitalization. This paper aims to better define and assess the utility of augmentation via a multi-disiplinary study. Design/methodology/approach — Hypothetical telescope architectures are modeled and simulated on two separate days, then evaluated against performance measures and constraints using multi-objective optimization in a heuristic algorithm. Decision analysis and Pareto optimality identifies a set …
Prioritizing Facilities Linked To Corporate Strategic Objectives Using A Fuzzy Model, Devin Depalmer, Steven J. Schuldt, Justin D. Delorit
Prioritizing Facilities Linked To Corporate Strategic Objectives Using A Fuzzy Model, Devin Depalmer, Steven J. Schuldt, Justin D. Delorit
Faculty Publications
Excerpt: Limited facilities operating and modernization budgets require organizations to carefully identify, prioritize and authorize projects to ensure allocated resources align with strategic objectives. Traditional facility prioritization methods using risk matrices can be improved to increase granularity in categorization and avoid mathematical error or human cognitive biases. These limitations restrict the utility of prioritizations and if erroneously used to select projects for funding, they can lead to wasted resources. This paper aims to propose a novel facility prioritization methodology that corrects these assessment design and implementation issues.
Integrating Cost As A Decision Variable In Wargames, Joshua N. Reese, Jonathan D. Ritschel, Brent T. Langhals, Ryan D. Engle
Integrating Cost As A Decision Variable In Wargames, Joshua N. Reese, Jonathan D. Ritschel, Brent T. Langhals, Ryan D. Engle
Faculty Publications
The US military can no longer afford to be reactive, leaving critical cost analyses to the months and years following operations or full-scale conflicts. By leveraging cost in wargaming as part of the Joint planning process, DOD can provide Congress and the American taxpayers a range of potential costs associated with various military engagements that reflect fiscal and operational realities.