Full-Text Articles in Other Operations Research, Systems Engineering and Industrial Engineering

Inventory Locating With Quuppa: The Design And Development Of A Real-Time Process Monitoring Web Application Solution, Dylan C. Moreland, Trevor J. Howell, John W. Takiff, Patrick S. Dillon, Theo E. Fritz, William K. Mcintyre Jun 2021

Inventory Locating With Quuppa: The Design And Development Of A Real-Time Process Monitoring Web Application Solution, Dylan C. Moreland, Trevor J. Howell, John W. Takiff, Patrick S. Dillon, Theo E. Fritz, William K. Mcintyre

Industrial and Manufacturing Engineering

Viasat, Inc. requires precise inventory tracking at their production facility in San Diego, CA. Viasat has installed the Quuppa indoor real-time locating system (RTLS), which it uses to track the real-time position of high-value work-in-process items. In its current state, the system only displays in-the-moment location information, with no available functionality for storing historical data for review, analysis, or visualization. In addition, the data displayed is noisy and prone to significant random error. This paper provides an overview of RTLS methods and technologies, assesses alternative solutions to Viasat’s issue, demonstrates our RTLS integrated web app solution, analyzes its impact, and …


Mri Upgrades At Radiology Associates, Patrick Cheung, Charlene Donlon Dec 2016

Mri Upgrades At Radiology Associates, Patrick Cheung, Charlene Donlon

Industrial and Manufacturing Engineering

Problem Statement: The MRI machines at Radiology Associates are limiting the company’s ability to expand and compete within the local market. After discussing with technicians and managers at Radiology Associates, we decided to focus on hardware and software upgrades for the MRI machines. With 2 of the 3 locations purchasing new machines in the near future, our focus was on upgrades at the Santa Maria facility. The two machines at this location needed hardware and/or software upgrades to remain on par competitively both within the company and with local scanning options. Flexible coils are beneficial in terms of size, weight, …


Laser Clean Room Re-Design: A Manufacturing Facility Re-Layout, Jennifer J. Siu Jun 2010

Laser Clean Room Re-Design: A Manufacturing Facility Re-Layout, Jennifer J. Siu

Industrial and Manufacturing Engineering

Alcon’s Laser Clean Room fosters inefficient production practices, is outdated for its current process, and lacking in clear process/product flow. A facility re-design is applied to bring order, efficiency, and optimize flow in the laser production lines.

Deliverables include a new layout that decreases product travel distances and increases productivity as well as an implementation plan and cost/savings analysis. Major design decisions include downsizing the clean room, sorting to find waste and establishing clear process/product flows. The design was implemented within three weeks and results yield 29% reduction of product travel distance, 10.4 hrs/day saved from eliminated gowning time and …


Design For Manufacturing Of Sports Equipment, Cedrick Bit, Christopher L. Head Jan 2010

Design For Manufacturing Of Sports Equipment, Cedrick Bit, Christopher L. Head

Industrial and Manufacturing Engineering

The purpose of this project was to validate industrial designs for a product in its conceptual stage and suggest/implement design changes that suit the contracting company’s needs while assuring the product maintains its basic functional requirements. Techniques and methods used to validate the design include 3‐D solid modeling, physical product application using rapid prototyping to produce the product. Methods of design for manufacturing were analyzed in the design. Processes used in the validation and verification of the design include solid modeling design, methods of measurements, fixture design and manufacturing processes. Full design specifications and solid model files were finalized and …