Open Access. Powered by Scholars. Published by Universities.®

Operations Research, Systems Engineering and Industrial Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 2 of 2

Full-Text Articles in Operations Research, Systems Engineering and Industrial Engineering

A Critical Path Problem Using Triangular Neutrosophic Number, Florentin Smarandache, Mai Mohamed, Yongquan Zhou, Mohamed Abdel-Baset Jul 2017

A Critical Path Problem Using Triangular Neutrosophic Number, Florentin Smarandache, Mai Mohamed, Yongquan Zhou, Mohamed Abdel-Baset

Branch Mathematics and Statistics Faculty and Staff Publications

The Critical Path Method (CPM) is one of several related techniques for planning and managing of complicated projects in real world applications. In many situations, the data obtained for decision makers are only approximate, which gives rise of neutrosophic critical path problem. In this paper, the proposed method has been made to find the critical path in network diagram, whose activity time uncertain. The vague parameters in the network are represented by triangular neutrosophic numbers, instead of crisp numbers. At the end of paper, two illustrative examples are provided to validate the proposed approach.


Multi-Criteria Decision Modeling For Best Value Selections In Target Value Design Integrated Project Delivery, Brent Patrick Griffis Jun 2014

Multi-Criteria Decision Modeling For Best Value Selections In Target Value Design Integrated Project Delivery, Brent Patrick Griffis

Master's Theses

Integrated Project Delivery (IPD) combined with Target Value Design (TVD) is a better way to deliver value for the client than traditional guaranteed maximum price (GMP) methods. With traditional GMP delivery methods, the interests of the parties are often at odds. The goal of IPD is to align all party interests in order to achieve a win-win scenario. Due to the aligning nature of IPD and the fact that each party’s success is dependent on achieving the project objectives as a whole; a non-biased, transparent, decision-making process is necessary in order to deliver the project objectives within the constraints of …