Open Access. Powered by Scholars. Published by Universities.®

Operations Research, Systems Engineering and Industrial Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 3 of 3

Full-Text Articles in Operations Research, Systems Engineering and Industrial Engineering

The Viability Of Electrification For Industrial Off-Road Vehicles In Construction, Caden Patrick Stoker Jun 2023

The Viability Of Electrification For Industrial Off-Road Vehicles In Construction, Caden Patrick Stoker

Construction Management

Federal and State legislation has been passed limiting the prospective propulsion options for heavy industrial off-road vehicles that general contractors can operate on the jobsite. The interest behind this research project is the viability of introducing fully electric off-road construction vehicles into the heavy civil construction industry and if the timeline for implementation is realistic or optimistic. As new rules and regulations pertaining to the future emissions requirements of civilian and commercial vehicles effect the country, the construction industry is spending billions in order to develop (and are currently developing) fully electric off-road industrial vehicles (dozers, front loaders, scrappers, dump …


A Case Study: The First Coastal Nuclear Decommissioning Project In California, Willie Aaron Quiros Dec 2019

A Case Study: The First Coastal Nuclear Decommissioning Project In California, Willie Aaron Quiros

Construction Management

San Onofre Nuclear Generating System (SONGS) is one of two nuclear power plants in California. Since the shut down in 2012, there is only one actively remaining, Diablo Canyon Nuclear Power Plant, which is set to shut down in 2024. This paper will examine the decommissioning of SONGS thus far; the first coastal nuclear decommissioning project in California’s stringent permitting process. This project was awarded as a joint venture to AECOM and Energy Solutions, both having experiencing in the field of nuclear decommissioning. This paper will outline what nuclear decommissioning challenges have been in the past; general steps of decommissioning …


Multi-Criteria Decision Modeling For Best Value Selections In Target Value Design Integrated Project Delivery, Brent Patrick Griffis Jun 2014

Multi-Criteria Decision Modeling For Best Value Selections In Target Value Design Integrated Project Delivery, Brent Patrick Griffis

Master's Theses

Integrated Project Delivery (IPD) combined with Target Value Design (TVD) is a better way to deliver value for the client than traditional guaranteed maximum price (GMP) methods. With traditional GMP delivery methods, the interests of the parties are often at odds. The goal of IPD is to align all party interests in order to achieve a win-win scenario. Due to the aligning nature of IPD and the fact that each party’s success is dependent on achieving the project objectives as a whole; a non-biased, transparent, decision-making process is necessary in order to deliver the project objectives within the constraints of …