Open Access. Powered by Scholars. Published by Universities.®

Manufacturing Commons

Open Access. Powered by Scholars. Published by Universities.®

University of Kentucky

Business

Scheduling

Articles 1 - 2 of 2

Full-Text Articles in Manufacturing

Maximizing Operating Room Performance Using Portfolio Selection, Vivek Reddy Gunna, Amin Abedini, Wei Li Jul 2017

Maximizing Operating Room Performance Using Portfolio Selection, Vivek Reddy Gunna, Amin Abedini, Wei Li

Mechanical Engineering Faculty Publications

The operating room (OR) is responsible for most hospital admissions and is one of the most cost and work intensive areas in the hospital. From recent trends, we observe an ironic parallel increase among expenditure and waiting time. Therefore, improving OR scheduling has become obligatory, particularly in terms of patient flow and benefit. Most of the hospitals rely on average patient arrivals and processing times in OR planning. But in practice, variations in arrivals and processing times causes high instability in OR performance. Our model of optimization provides OR schedules maximizing patient flow and benefit at a fixed level of …


An Optimization Model For Operating Room Scheduling To Reduce Blocking Across The Perioperative Process, Amin Abedini, Wei Li, Honghan Ye Jul 2017

An Optimization Model For Operating Room Scheduling To Reduce Blocking Across The Perioperative Process, Amin Abedini, Wei Li, Honghan Ye

Mechanical Engineering Faculty Publications

Operating room (OR) scheduling is important. Because of increasing demand for surgical services, hospitals must provide high quality care more efficiently with limited resources. When constructing the OR schedule, it is necessary to consider the availability of downstream resources, such as intensive care unit (ICU) and post anaesthesia care unit (PACU). The unavailability of downstream resources causes blockings between every two consecutive stages. In this paper we address the master surgical schedule (MSS) problem in order to minimize blockings between two consecutive stages. First, we present a blocking minimization (BM) model for the MSS by using integer programming, based on …