Open Access. Powered by Scholars. Published by Universities.®

Geotechnical Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 2 of 2

Full-Text Articles in Geotechnical Engineering

Continuous Moisture Measurement During Pavement Foundation Construction: Laboratory Measurements, Isaac Esteban Zuniga Dec 2022

Continuous Moisture Measurement During Pavement Foundation Construction: Laboratory Measurements, Isaac Esteban Zuniga

Open Access Theses & Dissertations

Moisture content directly affects all properties of subgrade materials. A rapid, continuous, and accurate technique to determine moisture content during subgrade construction is the next step needed to improve the mechanistic-based quality of pavement foundations. In this study, six geomaterials were compacted to standard/modified proctor specifications and subjected to laboratory measurements to study the variations in their electromagnetic and electric properties with moisture content. The relationships between the seismic modulus, unconfined compressive strength, lightweight deflectometer, and moisture content for the same geomaterials were also established. Large-scale replicate specimens were also compacted and subjected to numerous measurements. The dielectric constant measured …


Rapid Non-Nuclear In Situ Density And Moisture Content Measurement Of Soil, Mateo Lopez May 2022

Rapid Non-Nuclear In Situ Density And Moisture Content Measurement Of Soil, Mateo Lopez

Graduate Theses and Dissertations

Adequate soil compaction is important for the stability and safety of structures and transportation infrastructure. Thus, methods utilized to obtain properties that control the quality of compaction in the field are essential to ensure proper construction. These properties include; total density, dry density, total unit weight and dry unit weight of the compacted soil. The most common method to measure these properties in the field is the Nuclear Density Gauge. Moisture content and density results are obtained using the Nuclear Density Gauge in one to four minutes. However, this method requires specialized training and strict storage requirements in addition to …