Open Access. Powered by Scholars. Published by Universities.®

Geotechnical Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 6 of 6

Full-Text Articles in Geotechnical Engineering

International Conference On Short And Medium Span Bridges, Calgary, July 15-18, 2014, Barry A. Palynchuk Phd, Christophe Deniaud Phd Jul 2014

International Conference On Short And Medium Span Bridges, Calgary, July 15-18, 2014, Barry A. Palynchuk Phd, Christophe Deniaud Phd

Barry A. Palynchuk PhD

The Jean River near Wabush, Labrador is crossed by two railways and an access road by twin 6m diameter culverts . They are heavily strutted inside their barrels to counteract some significant shape deformation, and are deemed not suitable to sustain the increased volume of rail traffic serving the development of the Bloom Lake mines. The owner requested the design and construction of a replacement scheme for an additional design life of 20 years with a time sensitive schedule for completion of the work during the 2013 construction season. This VE concept for the design of live load relief spans …


Design And Construction Of Rail And Road Live Load Relief Spans Over Existing Culverts, Barry A. Palynchuk Phd, Christophe Deniaud Phd Jul 2014

Design And Construction Of Rail And Road Live Load Relief Spans Over Existing Culverts, Barry A. Palynchuk Phd, Christophe Deniaud Phd

Barry A. Palynchuk PhD

DESIGN AND CONSTRUCTION OF RAIL AND ROAD LIVE LOAD RELIEF SPANS OVER EXISTING CULVERTS


Active Tuned Mass Damper Control Of Wind Turbine Nacelle/Tower Vibrations With Damaged Foundations, Breiffni Fitzgerald Jan 2013

Active Tuned Mass Damper Control Of Wind Turbine Nacelle/Tower Vibrations With Damaged Foundations, Breiffni Fitzgerald

Breiffni Fitzgerald

The aim of this paper is to develop an active structural control scheme to control wind turbine nacelle/tower out-of-plane vibration. An active tuned mass damper (ATMD) is designed an placed inside the turbine nacelle. An EulerLagrangian wind turbine model based on energy formulation is developed for this purpose, which considers the structural dynamics of the system and the interaction between in-plane and out-of-plane vibrations. Also, the interaction between the blades and the tower including the ATMD is considered. The wind turbine is subjected to gravity and turbulent aerodynamic loadings. A three-dimensional (3D) model of a wind turbine foundation is designed …


Economic Design Of Retaining Wall Using Particle Swarm Optimization With Passive Congregation, Mohammad Khajehzadeh, M R., Taha, A., El-Shafie, Mahdiyeh Eslami Jan 2010

Economic Design Of Retaining Wall Using Particle Swarm Optimization With Passive Congregation, Mohammad Khajehzadeh, M R., Taha, A., El-Shafie, Mahdiyeh Eslami

Dr. Mahdiyeh Eslami (مهدیه اسلامی)

No abstract provided.


Masw Tests For Detection Of Decayed Buried Timber Within Railway Embankments, Barry A. Palynchuk Phd, Chris Bunce Phd, Steve Sather M.Eng Jan 2009

Masw Tests For Detection Of Decayed Buried Timber Within Railway Embankments, Barry A. Palynchuk Phd, Chris Bunce Phd, Steve Sather M.Eng

Barry A. Palynchuk PhD

No abstract provided.


Emergency Response Canadian Pacific Railway Canadian Main Line, Barry A. Palynchuk Phd, Michael J. Loehr, Robert W. Badger, Robert P. Conroy, Clive H. Mackay Jan 2000

Emergency Response Canadian Pacific Railway Canadian Main Line, Barry A. Palynchuk Phd, Michael J. Loehr, Robert W. Badger, Robert P. Conroy, Clive H. Mackay

Barry A. Palynchuk PhD

In late June 1998, a major storm event occurred in the Adirondack Mountains in the vicinity of Keeseville, New York about 150 miles north of Albany. This storm resulted in unprecedented damage to the Canadian Pacific Railway (CPR) Canadian Mainline along the shores of Lake Champlain. The storm caused 14 major embankment failures and washouts, numerous minor failures, severe bridge foundation scour and a major mainline derailment.