Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 4 of 4

Full-Text Articles in Construction Engineering and Management

Dickey-Lincoln School Lakes Environmental Impact Statement : Supplement To Draft Eis For Transmission Lines Prepared By The Department Of Energy, New England Division, U.S. Army Corps Of Engineers Jan 1978

Dickey-Lincoln School Lakes Environmental Impact Statement : Supplement To Draft Eis For Transmission Lines Prepared By The Department Of Energy, New England Division, U.S. Army Corps Of Engineers

Dickey-Lincoln School Lakes Project

Consultation and Coordination During Preparation of the DEIS DOE, in developing the scope of work for the Dickey-Lincoln School Lakes transmission study, recognized the need for a great deal of consultation and coordination. Consultation, coordination, and public involvement were integral parts of the study design. As part of this effort, extent of experience in northern New England and location were important factors in selecting consultants for various portions of the study. The System Planning Study (Appendix A), DOE's first project effort, was accomplished in coordination with the electric utilities of the region, specifically NEPLAN, the planning arm of the New …


Dickey-Lincoln School Lakes, Maine, Hydro-Power Decision, October 27, 1978, James B. Longley Jan 1978

Dickey-Lincoln School Lakes, Maine, Hydro-Power Decision, October 27, 1978, James B. Longley

Dickey-Lincoln School Lakes Project

The Dickey-Lincoln School Project would consist of two earthfill structures designed to produce peaking and modest intermediate load power from the St. John River The larger of the two dams, the Dickey Dam, would be located immediately above the confluence of the Allagash and St. John Rivers. The Lincoln School Dam would also be located on the Upper St. John River, eleven miles downstream from the Dickey Dam. The Dickey Dam would have a total length of 10,600 feet and a maximum height of 335 feet. The Lincoln School Dam is considerably smaller and would be 1,600 feet long and …


Army Engineers In New England : The Military And Civil Work Of The Corps Of Engineers In New England, 1775-1975, Aubrey Parkman Jan 1978

Army Engineers In New England : The Military And Civil Work Of The Corps Of Engineers In New England, 1775-1975, Aubrey Parkman

Dickey-Lincoln School Lakes Project

Here the Corps’ military mission began at the outbreak of the American Revolution in 1775. Here, too, civil works projects were among the first to be undertaken by Army Engineers when Congress and the President entrusted the Corps with its civil mission in 1824. This is the story of the Corps’ service and accomplishments in New England from the Battle of Bunker Hill to the present. Relating the activities of the Corps to broader regional and national developments, the book should appeal to a general audience as well as to specialists.


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix B: Alternative Power Transmission Corridors, United States Department Of Energy, United States Department Of The Interior Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix B: Alternative Power Transmission Corridors, United States Department Of Energy, United States Department Of The Interior

Dickey-Lincoln School Lakes Project

This report identifies alternative corridors of land within which transmission lines could be routed and details various impacts on the environment which would be associated with introduction of transmission facilities. Many alternative corridor locations were identified (see Figure 1-1). Identification of these alternative transmission corridors was a complex process, since the number of potential corridors capable of connecting the various substations was myriad; the 'least desirable' potential corridors, i.e., those where transmission facilities might have entailed severest impacts on the environment, had to be eliminated from consideration before alternative corridors could be delineated. Identified alternative corridor locations were subsequently evaluated …