Open Access. Powered by Scholars. Published by Universities.®

Civil Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 4 of 4

Full-Text Articles in Civil Engineering

Sustainable Infrastructure Development In The Ikn Region (Nusantara Capital): Simulation Of The Smart Self-Sustaining Urban Center Area Development, Naufal Budi Laksono, Yusuf Latief Jan 2024

Sustainable Infrastructure Development In The Ikn Region (Nusantara Capital): Simulation Of The Smart Self-Sustaining Urban Center Area Development, Naufal Budi Laksono, Yusuf Latief

Smart City

Embarking on the quest for a sustainable urban future, this research immerses itself in the vibrant landscape of "Sustainable Infrastructure Development in the IKN Region (Nusantara Capital)." This study investigates the financial viability and economic attractiveness of the Five City project, focusing on efficient infrastructure management for sustainable settlement development. The core facility comprises four vertical residential towers with supporting amenities. The research aims to evaluate the project''s feasibility over a 25-year investment period through comprehensive financial analyses.The research employs a structured approach, encompassing regulatory analysis, stakeholder identification, financial capability analysis, and risk management. Parameters such as Net Present Value …


The Interpretative Structural Modeling For Stakeholder Involvement To Reduce Slum Settlements, Bich Hanes Bich, Ayomi Dita Rarasati Jan 2024

The Interpretative Structural Modeling For Stakeholder Involvement To Reduce Slum Settlements, Bich Hanes Bich, Ayomi Dita Rarasati

Smart City

The array of problems originating from slum settlements not only results in unwholesome environment, unlawful land utilization, and various internal challenges within the vicinity but also impacts the surrounding regions and the overall urban infrastructure network. In pursuit of Indonesia's 2045 Vision, which emphasizes on "equitable and integrated infrastructure development", the zero slums constitutes a pivotal component of the Ministry of Public Works and Public Housing's overarching vision. Nonetheless, a disparity has been identified in addressing slum settlements in West Kalimantan, hindering the achievement of this objective. This research aims to identify the stakeholders and the priority factors in determining …


Project Stakeholder Analysis In Temadore Bridge Construction Development, Hud Rafsanjani, Ayomi Dita Rarasati Jan 2024

Project Stakeholder Analysis In Temadore Bridge Construction Development, Hud Rafsanjani, Ayomi Dita Rarasati

Smart City

The construction of bridge is important due to its ability to link communities through land-road connection, thereby saving time and increasing productivity of those living in these areas. Therefore, this research evaluated the Temadore bridge, built to link Ternate City, Maitara land and Tidore City by road to enhance movement and reduce disparities in assessing both areas. Data were collected using the Interpretative Structural Modeling (ISM) which searched for and identified several variables according to the dependence power and driving power. The result showed that construction of bridge increased the movement of community activities and productivity, thereby leading to growth.


Factors Influencing The Occurrence Of Rework In Terms Of Risk-Based Communication Management In Construction Projects, Virani Mayniana, Rossy Armyn Machfudiyanto Dec 2023

Factors Influencing The Occurrence Of Rework In Terms Of Risk-Based Communication Management In Construction Projects, Virani Mayniana, Rossy Armyn Machfudiyanto

Smart City

Rework in a construction project is an unplanned and unwanted activity that requires an action to repeat part or all the work to meet project standards or requirements and, in its implementation, causes increased work, time, and costs. Based on previous studies that discuss the factors that cause rework, poor communication management or coordination between stakeholders is one of the causes of rework. Therefore, a literature study was conducted to identify project communication management risks that allow rework to occur and resulted in 54 communication management risk factors. Furthermore, the results of the literature study were validated by experts who …