Open Access. Powered by Scholars. Published by Universities.®

Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 31 - 35 of 35

Full-Text Articles in Engineering

Grady Health Systems Linen Optimization, Kyleia Hutton, Samira Abdi Apr 2018

Grady Health Systems Linen Optimization, Kyleia Hutton, Samira Abdi

Senior Design Project For Engineers

Grady Memorial Hospital, under Grady Health Systems (GHS), is the fifth largest public hospital systems in the United States of America. In the Southeast region, Grady Memorial Hospital is a premier level I trauma institution, that also provides other medical service specialties that accumulate a diverse, and knowledgeable set of medical professionals. Within this report, there are various recommendations that our team has presented based on different scenarios that could be present within the interaction of the linen management department and other departments at Grady Health Systems. These recommendations will aid in determining the best decision that can be made …


A-Set Process Improvement, Gabriel Rubio, Davis Jackson, Christopher Olaya Apr 2018

A-Set Process Improvement, Gabriel Rubio, Davis Jackson, Christopher Olaya

Senior Design Project For Engineers

Siemens Energy offers world-class products and solutions for power generation. They help their clients worldwide to successfully operate conventional power plants by renting out their toolkits. Clients can work on anything from gas or steam turbines, generators, turbines, or even hybrid power and storage. One of Siemens’ more profitable toolkits would be the A-Set, or as the floor assemblers refer to as ‘the majors,’ which consists of two large conex containers filled with thousands of tools ready for any type of operation at power plants. By looking at how long it takes floor assemblers at the Siemens Facility in Suwanee, …


Reducing Damaged And Returned Inventory At Mds Logistics, Chris Montell, Darioush Moein, Amir Samadabadi Apr 2018

Reducing Damaged And Returned Inventory At Mds Logistics, Chris Montell, Darioush Moein, Amir Samadabadi

Senior Design Project For Engineers

MDS Logistics is a middle-man that delivers and installs appliances to multi-family complexes and neighborhoods in Georgia. One of the biggest issues that they face in day-to-day operation is damaged and returned appliances. MDS’s longest standing contract is with GE and GE has extensive records of damage that is incurred by using similar companies across the country. We will be consulting with MDS while using the data produced by GE to compare MDS with the similar companies to see where improvement can be made reasonably.

When an appliance is damaged it is brought back to MDS’s warehouse where they are …


Optimizing The B.O.B., Valerie N. Washington, Douglas Starzec Apr 2017

Optimizing The B.O.B., Valerie N. Washington, Douglas Starzec

KSU Journey Honors College Capstones and Theses

The Kennesaw State University Department of Transportation manages the Big Owl Bus (B.O.B.). The B.O.B. has 9 routes which provide transportation around and between the Kennesaw and Marietta campuses, as well as to select off-campus apartment complexes and shopping centers. We utilized a number of methodologies to recommend improvements to the efficiency and accessibility of the B.O.B. We first used the vehicle routing problem to develop a binary integer linear programming model. This allowed us to determine a new set of routes that minimize total travel time across the routes. Next, we developed an integer non-linear programming model to assign …


The Context Of Tool Control In An Aircraft Assembly Environment Related To Productivity, Taylor Jay Sisson May 2016

The Context Of Tool Control In An Aircraft Assembly Environment Related To Productivity, Taylor Jay Sisson

KSU Journey Honors College Capstones and Theses

The aircraft industry focuses a large portion of its resources on tool control during the assembly of aircraft. Tool control is a strict process that demands time from the assembly process. This time is removed from the value-added time spent actually assembling the aircraft. A study at Lockheed Martin conducted in the Spring of 2016 is discussed that examines the time spent on tool control. Tool control is necessary in aircraft assembly to prevent tools from entering compartments of the aircraft. If such an event occurs, the tool may damage the aircraft. All aircraft assembly processes must be tool controlled, …