Open Access. Powered by Scholars. Published by Universities.®

Architectural Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 8 of 8

Full-Text Articles in Architectural Engineering

A Financial Impact Assessment Of Ld 1725: Stream Crossings, New England Environmental Finance Center, Muskie School Of Public Service Jan 2011

A Financial Impact Assessment Of Ld 1725: Stream Crossings, New England Environmental Finance Center, Muskie School Of Public Service

Water

This report looks at the potential financial impact of LD 1725 on the estimated 30,000 stream crossings in the State of Maine that would be affected by the law. Our research for this report included the analysis of nearly 2000 stream crossings and the data collection necessary for the development of extensive stream crossing replacement cost models. We found that the 1.2 bankfull requirements in LD 1725 would result in a 75% ‐ 250% increase in structure widths for stream crossing projects across the state. An upsize of this magnitude would increase the cost of replacing stream crossings statewide by …


A Financial Impact Assessment Of Ld 1725: Stream Crossings Presentation, New England Environmental Finance Center Jan 2011

A Financial Impact Assessment Of Ld 1725: Stream Crossings Presentation, New England Environmental Finance Center

Economics and Finance

This report looks at the potential financial impact of LD 1725 on the estimated 30,000 stream crossings in the State of Maine that would be affected by the law. Our research for this report included the analysis of nearly 2000 stream crossings and the data collection necessary for the development of extensive stream crossing replacement cost models. We found that the 1.2 bankfull requirements in LD 1725 would result in a 75% ‐ 250% increase in structure widths for stream crossing projects across the state. An upsize of this magnitude would increase the cost of replacing stream crossings statewide by …


Culvert Material Cost Comparison, New England Environmental Finance Center Nov 2010

Culvert Material Cost Comparison, New England Environmental Finance Center

Water

The following tables provide a detailed look at the role that culvert material and culvert diameter play in the overall cost of a culvert replacement project.


Culvert Material Cost Comparison, New England Environmental Finance Center Nov 2010

Culvert Material Cost Comparison, New England Environmental Finance Center

Economics and Finance

The following tables provide a detailed look at the role that culvert material and culvert diameter play in the overall cost of a culvert replacement project. Table 1 displays the cost per foot purchase price arranged by diameter size for the various culvert materials that are currently available. Table 2 displays the average additional culvert pipe material cost (increased cost to upsize minus original in-kind replacement cost) that would be incurred when upsizing a given diameter of culvert with a 50 foot length by factors of: 200%, 250% and 300%.


Brunswick Me: De-Militarizing The Bnas, Anne Holland, Brett Richardson, Richard Barringer May 2008

Brunswick Me: De-Militarizing The Bnas, Anne Holland, Brett Richardson, Richard Barringer

Planning

Closure of the Brunswick Naval Air Station in 2011 will have profound economic impacts on the entire mid-coast Maine region of Maine, with an estimated loss of 6,500 jobs and $330 million annual income. Throughout the Base Realignment and Closure process, Brunswick, the region, and the State of Maine followed federal rules and developed the federally-funded Brunswick Local Redevelopment Authority (BLRA) to plan for reuse of the 3300 acre base. In its planning process, the BLRA adhered to a number of well thought-out Guiding Principles, including the use of extensive public participation and the consideration of “smart growth” principles and …


Mansfield Ct: Planning A New Village Center, Maggie Jones, Richard Barringer Aug 2006

Mansfield Ct: Planning A New Village Center, Maggie Jones, Richard Barringer

Planning

The case follows the development of a plan for a new village center in Storrs, the central village of Mansfield, Connecticut. A process that was transparent and inclusive of the community members yielded a plan that gained the approval of the Town, the landowner (the University of Connecticut), and the citizenry. The process relied on the mending of fences, the leadership of key participants, and an innovative strategy that included development of a nonprofit corporation and creative use of grant money. While zoning changes are still in the works, the first stage of building goes forward.


Augusta Me: The New Bridge Begets A New Planned Neighborhood, Molly Pulsifer, Richard Barringer Aug 2006

Augusta Me: The New Bridge Begets A New Planned Neighborhood, Molly Pulsifer, Richard Barringer

Planning

Construction of a new Third Bridge over the Kennebec River in Augusta offered the prospect of a new and handsome gateway to the city. Further, the resulting change in traffic patterns offered the City the chance to plan for a pattern of development quite different from what the city had experienced for the past half-century. The case study describes the planning and construction of the new bridge and corridors that re-routed traffic out of Augusta’s downtown and older neighborhoods, and created the opportunity for planned development adjacent to the corridor created by the new bridge. It goes on to describe …


Amherst Ma: A New Village Plan For Atkins Corner, Maggie Jones, Richard Barringer May 2006

Amherst Ma: A New Village Plan For Atkins Corner, Maggie Jones, Richard Barringer

Planning

The case study describes a successful smart growth initiative in the town of Amherst, Massachusetts, at an intersection known as Atkins Corner. The initiative grew from two motivating factors: the necessity of realigning Route 116, a major north-to-south artery through the town, to decrease traffic accidents at the intersection and improve pedestrian safety; and a desire on the part of Hampshire College and the Town to create a village center at the intersection. Through a consensus-building process involving key town officials, Hampshire College, neighbors, and the design firm of Dodson Associates, agreement on the project was reached with local stakeholders …