Full-Text Articles in Architecture

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix F: Geotechnical Impact Study, Jordan Gorrill Associates, Edward C. Jordan Co., Inc., United States Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix F: Geotechnical Impact Study, Jordan Gorrill Associates, Edward C. Jordan Co., Inc., United States Department Of Energy

Dickey-Lincoln School Lakes Project

The U.S. Departments of the Interior and Energy have conducted system planning, location, and environmental studies for the trans-mission facilities required for the Dickey-Lincoln School Hydroelectric project. These studies of many alternate routes have resulted in iden-tification of a proposed transmission line route and an environmental impact statement, as required by the National Environmental Policy Act of 1969. This report, one of several prepared under contract to the DOE by various consultants, is published as an appendix to that statement. Appendix F, Geotechnical Impact Study (two volumes, the second being a map volume), documents a study performed by E. C. …


Geotechnical Impact Study. Map Volume, United States Department Of Energy Jan 1978

Geotechnical Impact Study. Map Volume, United States Department Of Energy

Dickey-Lincoln School Lakes Project

Surficial Deposits Legend Maps of Dickey/Lincoln School lakes Transmission - E.I.S.Project, Environmental Assessment of Alternative Routs, Geotechnical Study, United States Department of the Interior.


Draft Environmental Impact Statement : Dickey-Lincoln School Lakes Transmission Project, United States Department Of Energy Jan 1978

Draft Environmental Impact Statement : Dickey-Lincoln School Lakes Transmission Project, United States Department Of Energy

Dickey-Lincoln School Lakes Project

This draft environmental impact statement (EIS) will describe the environmental impacts of transmission plans of the Department of Energy (DOE) for the proposed Dickey-Lincoln School Lakes Project. Electric power produced by the project is to be integrated into the New England electric system if the project is constructed.


Ecological Resources Impact Study. Map Volume, United States. Department Of Energy Jan 1978

Ecological Resources Impact Study. Map Volume, United States. Department Of Energy

Dickey-Lincoln School Lakes Project

Environmental Assessment of Alternative Routes, Ecological Resources Impact Study, Maps and Legend land cover types


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix J: Historical-Archeological Impact Study, Albert A. Dekin Jr., Bruce R. Donaldson, J. Lloyd Pepper, Paul A. Robinson, Edward A. Hession, Judith A. Rasson, Public Archaeology Facility Department Of Anthropology, United States Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix J: Historical-Archeological Impact Study, Albert A. Dekin Jr., Bruce R. Donaldson, J. Lloyd Pepper, Paul A. Robinson, Edward A. Hession, Judith A. Rasson, Public Archaeology Facility Department Of Anthropology, United States Department Of Energy

Dickey-Lincoln School Lakes Project

The report assessing cultural resources for the Dickey/Lincoln School Transmission Project consists of five narrative chapters, a topical bibliography, and five appendices. The scope of work, together with the USDI guidelines for cultural resource survey (included in Appendix E), comprise an attitude and approach toward prehistory which is in accord with the current state of the art, not simply in terms of cultural resource management but also in terms of contemporary standards generally recognized by practitioners of anthropological archaeology.


Land Use Impact Study. Map Volume, United States. Department Of Energy Jan 1978

Land Use Impact Study. Map Volume, United States. Department Of Energy

Dickey-Lincoln School Lakes Project

Environmental Assessment of Alternative Routes, Land Use Study, Maps, Existing land use


Dickey-Lincoln School Lakes Transmission Project : Draft Environmental Impact Statement, Transmission Eis Study Team, United States. Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Transmission Project : Draft Environmental Impact Statement, Transmission Eis Study Team, United States. Department Of Energy

Dickey-Lincoln School Lakes Project

This report summarizes the results of system planning, environmental, and location studies for transmission facilities associated with the proposed Dickey-Lincoln School Lakes Project in northern Maine. The studies recommend the construction of two 345-kV transmission circuits from a substation near the project along a route through western Maine into northern New Hampshire and Vermont. The plan will integrate the power produced by the project into the New England Power Pool Transmission System.


Visual-Recreation Resources Impact Study. Map Volume, United States. Department Of Energy Jan 1978

Visual-Recreation Resources Impact Study. Map Volume, United States. Department Of Energy

Dickey-Lincoln School Lakes Project

Environmental Assessment of Alternative Routes, Visual/Recreational Resources Impact Studies, Maps of Recreational Resources


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix B: Alternative Power Transmission Corridors, United States Department Of Energy, United States Department Of The Interior Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix B: Alternative Power Transmission Corridors, United States Department Of Energy, United States Department Of The Interior

Dickey-Lincoln School Lakes Project

This report identifies alternative corridors of land within which transmission lines could be routed and details various impacts on the environment which would be associated with introduction of transmission facilities. Many alternative corridor locations were identified (see Figure 1-1). Identification of these alternative transmission corridors was a complex process, since the number of potential corridors capable of connecting the various substations was myriad; the 'least desirable' potential corridors, i.e., those where transmission facilities might have entailed severest impacts on the environment, had to be eliminated from consideration before alternative corridors could be delineated. Identified alternative corridor locations were subsequently evaluated …


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix I: Visual-Recreation Resources Impact Study, United States Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix I: Visual-Recreation Resources Impact Study, United States Department Of Energy

Dickey-Lincoln School Lakes Project

The U.S. Departments of the Interior and Energy have conducted system planning, location, and environmental studies for the transmission facilities required for the Dickey-Lincoln School Hydroelectric Project. These studies of many alternate routes have resulted in identification of a proposed transmission line route, and an environmental impact statement as required by the National Environmental Policy Act of 1969. This report, one of several covering various topical areas, is published as an appendix to that statement.


Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada: Design Memorandum No. 5: Water Quality, New England Division, United States Army Corps Of Engineers Jan 1977

Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada: Design Memorandum No. 5: Water Quality, New England Division, United States Army Corps Of Engineers

Dickey-Lincoln School Lakes Project

This design memorandum presents the results of several studies undertaken to provide an understanding of present and potential future water quality conditions within and downstream from Dickey and Lincoln School Lakes in accordance with the requirements of ETL 1110-2-1402, dated 12 November 1976. Included are an examination of baseline water quality conditions and the findings of qualitative and quantitative predictive analyses performed to evaluate water quality conditions during all phases of the project's lifetime. This document will also serve as a reference for the water quality portions of the project Environmental Impact Statement.


Dickey-Lincoln School Lakes Project At Dickey, Maine : Draft Environmental Impact Statement, New England Division, United States Army Engineer Division Jan 1977

Dickey-Lincoln School Lakes Project At Dickey, Maine : Draft Environmental Impact Statement, New England Division, United States Army Engineer Division

Dickey-Lincoln School Lakes Project

This draft EIS address the impacts of the dams and appurtenant structures. The marketing and transmission of power from Federal projects are the statutory responsibility of the Department of the Interior. Accordingly, they are conducting transmission line studies in the preparation of a draft EIS. The draft EIS for transmission line and marketing is scheduled to be submitted to the Council on Environmental Quality in February 1978. Both drafts will be combined and submitted as a Final Environmental Impact Statement in August 1978.


Dickey-Lincoln School Lakes Project Environmental Impact Statement : Appendix G: Recreation Resources, Northern Maine Regional Planning Commission, Land Use Consultants, Inc., New England Division, U.S. Army Corps Of Engineers Jan 1977

Dickey-Lincoln School Lakes Project Environmental Impact Statement : Appendix G: Recreation Resources, Northern Maine Regional Planning Commission, Land Use Consultants, Inc., New England Division, U.S. Army Corps Of Engineers

Dickey-Lincoln School Lakes Project

This report is to evaluate and describe the existing recreational use and resources of the project area and the encompassing study area and to project the future use of those resources both with and without the Dickey-Lincoln School Lakes Project. The primary impact area of the proposed project (project area) includes the St. John River watershed upstream of the proposed damsites to the confluence of Nine-mile Brook. The area is bounded by the watershed divide with the Allagash River on the east and the Canadian Border on the west.


Dickey-Lincoln School Lakes Project: Transmission System Planning Study, United States Department Of The Interior Jan 1977

Dickey-Lincoln School Lakes Project: Transmission System Planning Study, United States Department Of The Interior

Dickey-Lincoln School Lakes Project

The purpose of this report is to investigate various transmission system alternatives and recommend a plan of service to integrate power from the Dickey-Lincoln School Lakes (D-L) Project into the New England electric power transmission system.


Report Of The Citizens' Dickey-Lincoln Project Impact Review Committee To Governor James B. Longley, John D. Robinson, James B. Longley Jan 1977

Report Of The Citizens' Dickey-Lincoln Project Impact Review Committee To Governor James B. Longley, John D. Robinson, James B. Longley

Dickey-Lincoln School Lakes Project

The construction of the Dickey-Lincoln Hydroelectric Project. To examine, in depth, the proposal and its impact as seen by various segments of our society. The report will identify the factors that must carry the main weight in making a final determination.


Social Impact Summary : Dickey-Lincoln School Lakes Project / Prepared For The Department Of The Army, Corps Of Engineers, New England Division, Edward C. Jordan Company, Inc. Jan 1977

Social Impact Summary : Dickey-Lincoln School Lakes Project / Prepared For The Department Of The Army, Corps Of Engineers, New England Division, Edward C. Jordan Company, Inc.

Dickey-Lincoln School Lakes Project

The Dickey-Lincoln Hydroelectric Dam is a water resources project proposed by the Federal Government (U. S. Army Corps of Engineers). Therefore, in accordance with the National Environmental Policy Act, the Corps of Engineers is required to prepare an environmental impact statement (EIS) on the project. A federal plan or project such as Dickey-Lincoln should take into account its effect upon man's health, safety, welfare and economic well-being, as well as effects upon the surrounding environment. More importantly, project plans should be evaluated in a "manner calculated to encourage harmony between man and his environment." In other words, project plans or …


Economic Impacts Summary : Dickey-Lincoln School Lakes Project, Edward C. Jordan Co. Inc, United States Army Corps Of Engineers, New England Division Jan 1977

Economic Impacts Summary : Dickey-Lincoln School Lakes Project, Edward C. Jordan Co. Inc, United States Army Corps Of Engineers, New England Division

Dickey-Lincoln School Lakes Project

Objective of this study will be to assess Dickey-Lincoln in terms of its attainment of project objectives. How will this be done? The Water Resources Council in "Water and Related Land Resources -Establishment of Principles and Standards for Planning"' states that: The overall purpose of water and land resource planning is to promote the quality of life, by reflecting society's preferences for attainment of the objectives...


Transmission Reconnaissance Study : Dickey-Lincoln School Lakes Project, United States Department Of Interior Jan 1977

Transmission Reconnaissance Study : Dickey-Lincoln School Lakes Project, United States Department Of Interior

Dickey-Lincoln School Lakes Project

Two dams are proposed on the St. John River in northern Maine: Dickey, a high earth filled dam immediately above the confluence of the Allagash with the St. John, will have an installed generating capacity of 760 MW; and Lincoln School Dam, 11 miles downstream, a capacity of 70 MW. These dams are scheduled for completion during the mid 1980's. The U.S. Corps of Engineers, New England Division, has been allocated funds to design the project and prepare their own environmental impact statement. This report (Transmission Reconnaissance Studies) discusses alternative transmission facilities needed to connect the project with the New …


Summary Of Labor Impacts During Construction : Dickey-Lincoln School Lakes Project, Edward C. Jordan Company, Inc. Jan 1977

Summary Of Labor Impacts During Construction : Dickey-Lincoln School Lakes Project, Edward C. Jordan Company, Inc.

Dickey-Lincoln School Lakes Project

This study is to assess the effects or impacts of construction and operation of the Dickey-Lincoln hydroelectric project upon the people in the St. John Valley, Maine, and New England. Having determined the effects of the project, a second objective is to discuss mitigation of defined adverse impacts. More specifically, this study attempts to identify adverse impacts and deal with how to minimize such impacts if at all possible.


Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada: Design Memorandum No. 3: Hydropower Capacity And Project Economic, New England Division, United States Army Corps Of Engineers Jan 1976

Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada: Design Memorandum No. 3: Hydropower Capacity And Project Economic, New England Division, United States Army Corps Of Engineers

Dickey-Lincoln School Lakes Project

This design memorandum presents the results of current engineering and economic analyses which serve as the basis for the selection of the recommended hydro-power installation at the Dickey-Lincoln School Lakes project. The report includes a summary of data pertinent to hydropower features of the project, projections of electricity needs for the New England Power Supply Areas, a description of the recom-mended power plan and facilities, pertinent data associated with power regulation studies, and the economic and engineering rationale for capacity optimization.


Recommendations Of Alternative System Plans And Transmission Corridors For The Dickey/Lincoln School Hydroelectric Project, Vtn Environmental Sciences (Firm), Interior Jan 1976

Recommendations Of Alternative System Plans And Transmission Corridors For The Dickey/Lincoln School Hydroelectric Project, Vtn Environmental Sciences (Firm), Interior

Dickey-Lincoln School Lakes Project

This second volume of the Assessment of Alternative Power Transmission Corri-dors related to the Dickey Lincoln/School Hydroelectric Project, contains all relevant background materials to support the mapping and analysis of en-vironmental resource information. Narrative explaining what information was evaluated and the sources and reasons for its consideration are integral to this assessment.


An Energy Strategy For New England : Objectives And Implementation, Development Sciences, Inc., New England Regional Commission Jan 1976

An Energy Strategy For New England : Objectives And Implementation, Development Sciences, Inc., New England Regional Commission

Dickey-Lincoln School Lakes Project

This report is a product of the New England Regional Commission's Energy Research and Policy Formulation Program. The goal of the Energy Program is to supply the members of the New England Regional Commission, which is comprised of the six New England Governors and a Federal Co-chairman appointed by the President, with reliable baseline information on New England's energy requirements and vulnerability, and to provide the Governors and the region with viable energy policy options and recommendations to guide New England's energy future.


Fact Sheet : Dickey-Lincoln School Lakes, Maine, New England Division, United States Army Corps Of Engineers Jan 1976

Fact Sheet : Dickey-Lincoln School Lakes, Maine, New England Division, United States Army Corps Of Engineers

Dickey-Lincoln School Lakes Project

The purpose of the proposed Dickey-Lincoln School Lakes Hydroelectric Project is to convert the natural energy of the upper St. John River in northern Maine for use as a source of electricity to meet future needs of New England consumers.


Transmission Planning Summary : Dickey-Lincoln School Lakes Project Transmission Studies, United States Department Of Interior Jan 1976

Transmission Planning Summary : Dickey-Lincoln School Lakes Project Transmission Studies, United States Department Of Interior

Dickey-Lincoln School Lakes Project

This report summarizes the results of system planning, environmental, and location studies for transmission facilities associated with the proposed Dickey-Lincoln School Lakes Project in northern Maine. The studies recommend the construction of two 345-kV transmission circuits from a substation near the project along a route through western Maine into northern New Hampshire and Vermont. The plan will integrate the power produced by the project into the New England Power Pool Transmission System. Five alternate integration plans were identified and studied. Of the five plans, the recommended plan, which calls for the lines to be suspended from a single row of …


Water Resources Development Project, Saint John River Basin : Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada : Design Memorandum No. 2 : Hydrology And Hydraulic Analysis, Section Iv - Lincoln School Dam-Spillway Design Flood, Department Of The Army, New England Division, Corps Of Engineers Jan 1976

Water Resources Development Project, Saint John River Basin : Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada : Design Memorandum No. 2 : Hydrology And Hydraulic Analysis, Section Iv - Lincoln School Dam-Spillway Design Flood, Department Of The Army, New England Division, Corps Of Engineers

Dickey-Lincoln School Lakes Project

The first of four sections comprising Design Memo-randum No. 2. The other sections are: II - Dickey Dam - Spillway Design Flood, III - Lincoln School Dam - Spillway Design Flood and IV - Flood Analysis and Reservoir Regulation. la section I, hydro-logic studies will be confined generally to the drainage area of the Saint John River above the gaging station at Fort Kent, Maine. The purpose of section I is to present the climatological and streamflow data for the Saint John River above Fort Kent in order to establish hydrologic criteria for the design of the Dickey and Lincoln …


Scope Of Work, Environmental Impact Statement For The Dickey-Lincoln School Lakes Project, New England Division, United States Army Engineer Division, United States Army Corps Of Engineers Jan 1975

Scope Of Work, Environmental Impact Statement For The Dickey-Lincoln School Lakes Project, New England Division, United States Army Engineer Division, United States Army Corps Of Engineers

Dickey-Lincoln School Lakes Project

Revised draft combines data previously published in two separate impact statements prepared by the corps relating to the dams, reservoirs and power plants and by the U. S. Department of Energy for transmission facilities to link the St. John River development to the New England power grid. The latter agency is responsible for the marketing and distribution of power generated at federally-financed installations.


A Study Of The Dickey-Lincoln Hydroelectric Project And Its Impact On The Resources Of The Upper Saint John River Valley, Rosemary M. Manning, Sierra Club, New England Chapter Jan 1973

A Study Of The Dickey-Lincoln Hydroelectric Project And Its Impact On The Resources Of The Upper Saint John River Valley, Rosemary M. Manning, Sierra Club, New England Chapter

Dickey-Lincoln School Lakes Project

This report was under-taken primarily to evaluate the impact that the construction of the Dickey-Lincoln project would have upon the resources of the Upper St. John River, and to examine the assertion that the Dickey-Lincoln project constitutes a wise use of the public's environmental and economic resources. Since the case that has been made for the construction of the Dickey-Lincoln project rest primarily on the justification of the project in economic terms, this aspect of the project proposal will be intensively explored.


Social And Economic Consequences Of The Dickey-Lincoln School Hydro-Electric Power Development On The Upper St. John Valley, Maine -- : Phase 1, Preconstruction, Louis A. Ploch, Nelson L. Leray Jan 1968

Social And Economic Consequences Of The Dickey-Lincoln School Hydro-Electric Power Development On The Upper St. John Valley, Maine -- : Phase 1, Preconstruction, Louis A. Ploch, Nelson L. Leray

Dickey-Lincoln School Lakes Project

The intention of this report is to present a still picture of the selected area as of the summer of 1966. The emphasis is on empirical relationships. The data contained herein will provide a base for subsequent analysis. Thus little attempt is made to cast the findings of the study in a theoretical framework. Later publications will utilize relevant theory and research to analyze the social and economic changes in an area related to the building of the Dickey and Lincoln School Dams. It is presumed that this particular report and its statistical sup-plement will be of particular interest to …


Social And Economic Consequences Of The Dickey-Lincoln School Hydro-Electric Power Development On The Upper St. John Valley, Maine -- : Phase 1, Preconstruction, Louis A. Ploch, Nelson L. Leray Jan 1968

Social And Economic Consequences Of The Dickey-Lincoln School Hydro-Electric Power Development On The Upper St. John Valley, Maine -- : Phase 1, Preconstruction, Louis A. Ploch, Nelson L. Leray

Dickey-Lincoln School Lakes Project

The intention of this report is to present a still picture of the selected area as of the summer of 1966. The emphasis is on empirical relationships. The data contained herein will provide a base for subsequent analysis. Thus little attempt is made to cast the findings of the study in a theoretical framework. Later publications will utilize relevant theory and research to analyze the social and economic changes in an area related to the building of the Dickey and Lincoln School Dams. It is presumed that this particular report and its statistical sup-plement will be of particular interest to …


Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada : Design Memorandum No. 2 Hydrology And Hydraulic Analysis: Section 1 - Climatology And Stream Flow, United States Army Corps Of Engineers, New England Division Jan 1967

Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada : Design Memorandum No. 2 Hydrology And Hydraulic Analysis: Section 1 - Climatology And Stream Flow, United States Army Corps Of Engineers, New England Division

Dickey-Lincoln School Lakes Project

This section I is the first of four sections comprising Design Memo-randum No. 2. The other sections are: II - Dickey Dam - Spillway Design Flood, III - Lincoln School Dam - Spillway Design Flood and IV - Flood Analysis and Reservoir Regulation. la section I, hydro-logic studies will be confined generally to the drainage area of the Saint John River above the gaging station at Fort Kent, Maine. The purpose of section I is to present the climatological and streamflow data for the Saint John River above Fort Kent in order to establish hydrologic criteria for the design of …