Ddasaccident567, Hd-Aid May 2007

Ddasaccident567, Hd-Aid

Global CWD Repository

On the morning of 21st May 2007 at approximately 0630hrs [Demining group] BAC Team 2 re-deployed back to CBU 040 to start operations. At approximately 1140hrs, an uncontrolled explosion occurred at the building site adjacent to the rear of the BAC Team 2 CP, UTM 712082/3681844, involving a civilian worker, Mr. [the Victim], who was delivering building material to the construction site. Mr. [the Victim] had reversed his truck on the area adjacent the construction site and had commenced to unload the vehicle. During this process Mr. [the Victim] kicked, stepped or dropped some building materials on a M77 sub-munition …


Ddasaccident762, Hd-Aid May 2007

Ddasaccident762, Hd-Aid

Global CWD Repository

The land owner, [Name removed], immediately contacted the CLO area 1-5 on the 5th May 2007 to report the location and the events surrounding the incident. This site was visited by MACC SL Operations, QA and the CLO to conduct an investigation of the event surrounding the discovery of the sub-munitions.


Ddasaccident732, Hd-Aid Apr 2007

Ddasaccident732, Hd-Aid

Global CWD Repository

On the inspection of the incident site on the 17th April 2007 the following observation was established: The sub-munition was located on the surface, in a declared, sub-surface cleared area. The sub-munition was removed from a mound of soil that had been excavated from an area adjacent to a road, during excavation of a retaining wall and then the sub-munition was placed in this area. The [Demining group] completion documents indicated the area was sub-surface cleared, however where the clearance bordered the road and where overhead power lines were present the area was only surface cleared due to interference when …


Ddasaccident738, Hd-Aid Apr 2007

Ddasaccident738, Hd-Aid

Global CWD Repository

CBU 19 was completed on the 31stMarch 07, see annex A for the [Demining group] Completion Report. According to the Completion Report the task was a combination of surface and sub-surface clearance in accordance with the operational clearance plan. The CBU was located, and reported to the MACC CLO, on Saturday (14th April) morning by a local farmer.


Ddasaccident751, Hd-Aid Apr 2007

Ddasaccident751, Hd-Aid

Global CWD Repository

On the morning of the 9th April 2007 the land owner had contracted a local farmer to commence cultivation of his land for follow-up planting, during the process of the cultivation the operator of the machine noticed on his return ploughing an M77 sub-munition, had been turned over and was now quite visible on the surface on the newly ploughed area. He immediately stopped work and report the incident to the land owner who in turn informed {Demining group] personnel in the area.


Ddasaccident766, Hd-Aid Apr 2007

Ddasaccident766, Hd-Aid

Global CWD Repository

On 03 April 2007, one M-77 Submunition was located by a local farmer while harvesting his orange orchard and banana plantation, in the vicinity of Task CBU-203, which had been completed by [Demining group] using sub-surface Battle Area Clearance (BAC) procedures. The farmer reported the find to [Name removed], MACC SL Community Liaison Assistant. After meeting with the farmer and confirming the information, the item was marked, photographed and the farmer was requested to remain outside the orchard pending further investigation. The incident was reported to [Name removed], MACC SL Operations Officer who, together with Capt [Name removed], LAF Operations …


Ddasaccident709, Hd-Aid Mar 2007

Ddasaccident709, Hd-Aid

Global CWD Repository

INVESTIGATION REPORT ON TWO MISSED MINES AT MINEFIELD 1580, KFAR HOUNE The Incident occurred in Area 6 (Minefield 1580), UTM (BM) 741126-707075 on the 28th and 29th March 2007 where two AP mine (No4 Israelis) were located in a previously cleared and marked area.


Ddasaccident735, Hd-Aid Mar 2007

Ddasaccident735, Hd-Aid

Global CWD Repository

On 14 March 2007, a local farmer discovered an M-77 submunition while harvesting banana trees in his plantation, which had been cleared by [Demining group] using sub-surface BAC procedures. At the time of the cluster strike, the ground was extremely soft and an accurate threat assessment by [Demining group] had ensured that sub-surface clearance operations were conducted.


Ddasaccident756, Hd-Aid Mar 2007

Ddasaccident756, Hd-Aid

Global CWD Repository

On 08 March 2007, [Name removed] (MACC CLO) arrived at the task to conduct a QA Completion Survey and was informed of the submunition by the land owner. After confirming the type and location, he informed [Name removed] (MACC QA Completion Assistant), who subsequently informed [Name removed] (MACC Chief of QA). The Completion was postponed and the site closed pending the arrival of [Name removed], the [Demining group] Project Manager.


Ddasaccident566, Hd-Aid Mar 2007

Ddasaccident566, Hd-Aid

Global CWD Repository

On 05 March 2007, 0935 hrs (local time), [the Victim], a [International demining company] Deminer, inadvertently caused a Israeli No4A Anti Personnel mine to activate while removing rocks from the front of his demining lane during manual mine clearance operations at Minefield (MF) 356, 3.5 km north-east of Nabatiyah.


Ddasaccident571, Hd-Aid Jan 2007

Ddasaccident571, Hd-Aid

Global CWD Repository

The terrain was already cleared with the use of mine detectors and was clearly limited with red painted rocks and stones. Around 09.30 Hr 1MC [Victim No.1] stepped on a cluster M77, which caused the explosion, following the investigation of the crater the cluster, was lying subsurface. He got injured at the heel of the right foot. 1MC [Victim No.2] got a shrapnel in the right under arm. 1MC [Victim No.2] went off immediately to get assistance down in the valley, where the ambulance was positioned. In the meanwhile 1MC [Victim No.1] tried to get downwards. He entered, probably disorientated, …


Ddasaccident553, Hd-Aid Jan 2007

Ddasaccident553, Hd-Aid

Global CWD Repository

On the day of the accident the team consisted of 10 members: Site Supervisor, Team Leader, 6 x searchers, medic and driver. [The Victim]. acting Team Leader, was supervising three searchers in the area of Box C3, [Names removed] who were conducting visual search of the area. [Name removed] was standing in the visually cleared area to the rear of the searchers supervising the surface search operations. At approximately 1008hrs, an uncontrolled explosion occurred in box C3, involving [the Victim]. At the time of the accident all team members were wearing PPE (jacket and visor).


Ddasaccident559, Hd-Aid Jan 2007

Ddasaccident559, Hd-Aid

Global CWD Repository

1030hrs: Captain [Name removed], the team leader, directed 2nd Sergeant [the Victim], a deminer, to move the UXO about 2 meters from its original place to a pit surrounded by two big rocks for demolition. The deminer was ordered to put a 75 gram TNT block and an electrical detonator at the tail part of the UXO. While the deminer was connecting the wire, the UXO burst into fire by its own and sprayed out flames towards him. The deminer sprang back by instinct to a hollow pit nearby for protection. He got burning injury on face, neck and hands. …


Ddasaccident570, Hd-Aid Dec 2006

Ddasaccident570, Hd-Aid

Global CWD Repository

When climbing up the hill, the EOD Team Member [Victim No.2] stepped on or against a sub-munition M77. It detonated and injured him. EOD Team Leader [Victim No.1] followed his Team Member at a distance of approximately 8 – 9 meters and was injured by the shrapnel of the detonated sub-munition.


Ddasaccident527, Hd-Aid Jun 2006

Ddasaccident527, Hd-Aid

Global CWD Repository

Date and country. [Name removed] - Fractured skull, head/facial injuries. Mine explosion - No.4A a/p mine. Mine exploded during excavation. Excavating on steep terrain believed possibly a former earth slide, falling rocks etc. could have caused a disturbance of the mine leading to a severely decreased activation force.


Ddasaccident522, Hd-Aid Sep 2005

Ddasaccident522, Hd-Aid

Global CWD Repository

The primary cause of this accident is listed as “Unavoidable” because it is possible that the Victim was working properly in the way that he was trained, and that he was also using a long and blast resistant tool when the accident occurred.


Ddasaccident398, Hd-Aid Aug 2003

Ddasaccident398, Hd-Aid

Global CWD Repository

As he excavated closer to the position of the signal he stopped and swept again with the detector. After again, pinpointing the signal he continued the excavation drill where upon a short time later there was a detonation at 0707 hrs.


Ddasaccident390, Hd-Aid Jul 2003

Ddasaccident390, Hd-Aid

Global CWD Repository

The Deminer [the Victim] begins work at 05:15 hrs and he continued work for 45 minutes in this lane 1 metre wide. At that time, he was cutting vegetations as per SOPs. At approximately 06:00 hrs, an uncontrolled detonation occurred in the clearance lane where Deminer MEHIC was working.


Ddasaccident397, Hd-Aid May 2003

Ddasaccident397, Hd-Aid

Global CWD Repository

At approximately 1520 hrs QA MDD Officer [the Victim] was leaving the [Demining group] Office proceeding along the corridor; he reached into his pocket for his cigarettes as he intended to have a smoke. When he placed his hand in his pocket he “felt the other component i.e. the detonator”, he then proceeded to take out the detonator and because he had been told that it was safe “proceeded to fit it back together, then there was a loud explosion noise”.


Ddasaccident396, Hd-Aid Feb 2003

Ddasaccident396, Hd-Aid

Global CWD Repository

At approximately 1125hrs, Team Leader [name excised] gave an order to stop work, as he was preparing to dispose the previously located mines and he required all the Deminers to retire to the safe area. On hearing the signal to stop work, [the Victim] then continued to probe around the mine in an attempt to identify the body perimeter of the mine, when there was an uncontrolled detonation.


Ddasaccident389, Hd-Aid Jan 2003

Ddasaccident389, Hd-Aid

Global CWD Repository

[The Victim] then excavated around the front and right hand side of the rock using his right hand, nothing being located. As it would have been difficult to excavate around the left hand side of the rock using his right hand. Deminer [second inconsistent name] had moved his legs 15 cms in depth when there was an uncontrolled detonation, after he stepped on the mine.


Ddasaccident392, Hd-Aid Oct 2002

Ddasaccident392, Hd-Aid

Global CWD Repository

The Team Leader started to walk out to the rest area and [the victim] started to mark the cleared area by knocking in red pickets. After approx 12 m, (when Team Leader was facing the access lane in a Northern direction), an uncontrolled detonation occurred.


Ddasaccident395, Hd-Aid Sep 2002

Ddasaccident395, Hd-Aid

Global CWD Repository

On the 26th September 2002 at approximately 1430 hrs whilst [Name excised, the Victim], was ploughing a field in Raab ett Talatine, a detonation occurred under the left hand back wheel of his tractor.


Ddasaccident393, Hd-Aid Sep 2002

Ddasaccident393, Hd-Aid

Global CWD Repository

[The Victim] then excavated around the front and right hand side of the rock using his right hand, nothing being located. As it would have been difficult to excavate around the left hand side of the rock using his right hand he swapped hands and started to excavate using his left hand, (something that [the Victim] regularly does). [the Victim] had excavated approximately 15 cms in depth when there was an uncontrolled detonation.


Ddasaccident382, Hd-Aid Jul 2002

Ddasaccident382, Hd-Aid

Global CWD Repository

On the day of the accident a [1st commercial demining group] Deminer was conducting manual clearance in a clearance lane next to a row of No.4 mines. While using the demining trowel to scratch small pieces of gravel away from one No.4 mine, it detonated.


Ddasaccident380, Hd-Aid Jul 2002

Ddasaccident380, Hd-Aid

Global CWD Repository

The Team 2i/c started packing the equipment at the Bench Mark (BM), whilst the Team Leader checked the disposal serial. He checked the first row of mines and was satisfied that a high order had been achieved on all four mines. He then moved forward to check the second row when an uncontrolled detonation occurred.


Ddasaccident383, Hd-Aid Jul 2002

Ddasaccident383, Hd-Aid

Global CWD Repository

He had excavated approximately 15 cms towards the initial signal and 5 cms in depth when he came to a rock, he then continued to excavate down when the uncontrolled detonation occurred.


Ddasaccident381, Hd-Aid Jun 2002

Ddasaccident381, Hd-Aid

Global CWD Repository

The Deminer then started to excavate the right hand signal, starting 20cms back from the signal source. He had excavated approximately 12 – 15 cms in distance from the signal, at a depth of 18 cms, with the width of the excavation trench being approximately 20cms wide before the uncontrolled detonation occurred.


Ddasaccident379, Hd-Aid Jun 2002

Ddasaccident379, Hd-Aid

Global CWD Repository

At the time of the accident a Manual Clearance Team were operational on M/F 505 clearance site, at Bal’awin, Bayt Yahun. At approximately 14:00, hrs an uncontrolled detonation in a previously cleared area occurred, whilst the Team Leader was checking the area.


Ddasaccident378, Hd-Aid May 2002

Ddasaccident378, Hd-Aid

Global CWD Repository

The Team Leader then adopted the kneeling position wearing his protective jacket and protective visor (down position). Prior to moving the rock he probed underneath it, checking for booby-traps, he then attempted to physically move the rock, whereupon an uncontrolled detonation occurred.