Open Access. Powered by Scholars. Published by Universities.®
Recreation, Parks and Tourism Administration Commons™
Open Access. Powered by Scholars. Published by Universities.®
- Keyword
Articles 1 - 7 of 7
Full-Text Articles in Recreation, Parks and Tourism Administration
Alternative Power Transmission Corridors. Map Volume., United States. Department Of Energy
Alternative Power Transmission Corridors. Map Volume., United States. Department Of Energy
Dickey-Lincoln School Lakes Project
Source data for base map taken from US Geological Survey Topographic Maps. 1:250.000 scale series. Horizontal and vertical control depicted herein is relative to the U S.G S source maps.
Ecological Resources Impact Study. Map Volume, United States. Department Of Energy
Ecological Resources Impact Study. Map Volume, United States. Department Of Energy
Dickey-Lincoln School Lakes Project
Environmental Assessment of Alternative Routes, Ecological Resources Impact Study, Maps and Legend land cover types
Land Use Impact Study. Map Volume, United States. Department Of Energy
Land Use Impact Study. Map Volume, United States. Department Of Energy
Dickey-Lincoln School Lakes Project
Environmental Assessment of Alternative Routes, Land Use Study, Maps, Existing land use
Visual-Recreation Resources Impact Study. Map Volume, United States. Department Of Energy
Visual-Recreation Resources Impact Study. Map Volume, United States. Department Of Energy
Dickey-Lincoln School Lakes Project
Environmental Assessment of Alternative Routes, Visual/Recreational Resources Impact Studies, Maps of Recreational Resources
Social Impact Summary : Dickey-Lincoln School Lakes Project / Prepared For The Department Of The Army, Corps Of Engineers, New England Division, Edward C. Jordan Company, Inc.
Social Impact Summary : Dickey-Lincoln School Lakes Project / Prepared For The Department Of The Army, Corps Of Engineers, New England Division, Edward C. Jordan Company, Inc.
Dickey-Lincoln School Lakes Project
The Dickey-Lincoln Hydroelectric Dam is a water resources project proposed by the Federal Government (U. S. Army Corps of Engineers). Therefore, in accordance with the National Environmental Policy Act, the Corps of Engineers is required to prepare an environmental impact statement (EIS) on the project. A federal plan or project such as Dickey-Lincoln should take into account its effect upon man's health, safety, welfare and economic well-being, as well as effects upon the surrounding environment. More importantly, project plans should be evaluated in a "manner calculated to encourage harmony between man and his environment." In other words, project plans or …
Transmission Reconnaissance Study : Dickey-Lincoln School Lakes Project, United States Department Of Interior
Transmission Reconnaissance Study : Dickey-Lincoln School Lakes Project, United States Department Of Interior
Dickey-Lincoln School Lakes Project
Two dams are proposed on the St. John River in northern Maine: Dickey, a high earth filled dam immediately above the confluence of the Allagash with the St. John, will have an installed generating capacity of 760 MW; and Lincoln School Dam, 11 miles downstream, a capacity of 70 MW. These dams are scheduled for completion during the mid 1980's. The U.S. Corps of Engineers, New England Division, has been allocated funds to design the project and prepare their own environmental impact statement. This report (Transmission Reconnaissance Studies) discusses alternative transmission facilities needed to connect the project with the New …
A Study Of The Dickey-Lincoln Hydroelectric Project And Its Impact On The Resources Of The Upper Saint John River Valley, Rosemary M. Manning, Sierra Club, New England Chapter
A Study Of The Dickey-Lincoln Hydroelectric Project And Its Impact On The Resources Of The Upper Saint John River Valley, Rosemary M. Manning, Sierra Club, New England Chapter
Dickey-Lincoln School Lakes Project
This report was under-taken primarily to evaluate the impact that the construction of the Dickey-Lincoln project would have upon the resources of the Upper St. John River, and to examine the assertion that the Dickey-Lincoln project constitutes a wise use of the public's environmental and economic resources. Since the case that has been made for the construction of the Dickey-Lincoln project rest primarily on the justification of the project in economic terms, this aspect of the project proposal will be intensively explored.