Open Access. Powered by Scholars. Published by Universities.®

Maine

Power and Energy

Publication Year

Articles 1 - 4 of 4

Full-Text Articles in Other Statistics and Probability

Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix K: Fish & Wildlife Mitigation Plan & Impacts (Revised), New England Division, United States Army Engineer Division Jan 1980

Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix K: Fish & Wildlife Mitigation Plan & Impacts (Revised), New England Division, United States Army Engineer Division

Dickey-Lincoln School Lakes Project

The proposed plan is comprised of three major segments: terrestrial, fisheries and endangered species. Each segment is essentially a self-contained unit. All costs for the three segments including land acquisition, operation and maintenance and capital equipment, are to be charged to the project and allocated to the project purposes of hydroelectric generation and flood control.


Dickey-Lincoln School Lakes Project Power Alternatives Study : Task 2 Report, Acres American Incorporated Jan 1977

Dickey-Lincoln School Lakes Project Power Alternatives Study : Task 2 Report, Acres American Incorporated

Dickey-Lincoln School Lakes Project

This report presents the results of Task 2 of this study, the overall purpose of which is the evaluation of alternative methods of providing electrical energy in New England in lieu of the Dickey-Lincoln hydroelectric project. The final Task 1 report was presented in July 1976 and will, in conjunction with this Task 2 and subsequent Tasks 3 and 4 reports, ultimately become part of the "Environmental Impact Statement" for the Dickey-Lincoln Project.


Dickey-Lincoln School Lakes Project Power Alternatives Study Draft Report : Task 1 Through 4, Acres American Incorporated Jan 1977

Dickey-Lincoln School Lakes Project Power Alternatives Study Draft Report : Task 1 Through 4, Acres American Incorporated

Dickey-Lincoln School Lakes Project

This report presents the detailed findings of Tasks 1 through 4 of the Dickey-Lincoln School Lakes Project Power Alternatives Study undertaken for the New England Division of the Corps of Engineers, by Acres American Incorporated, Consulting Engineers of Buffalo, New York under the terms of Contract Number DACW33-76-C-0047. Earlier reports on Task 1 dated July 1976, on Task 2 dated January 1977 and on Task 3 dated March 1977 have been incorporated virtually unchanged into this Task 4 report.


Dickey-Lincoln School Lakes Project Power Alternatives Study : Task 1 Report, Acres American Incorporated Jan 1976

Dickey-Lincoln School Lakes Project Power Alternatives Study : Task 1 Report, Acres American Incorporated

Dickey-Lincoln School Lakes Project

This report presents the results of Task 1 of a study undertaken by Acres American Incorporated to evaluate alternative methods of providing electrical energy in lieu of the Dickey-Lincoln School Lakes Project. It is understood that this report will ultimately become part of the "Environmental Impact Statement" for the project.