Articles 1 - 6 of 6

Full-Text Articles in Other Statistics and Probability

Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix F: Terrestrial Ecosystem Analysis (Supplement 2), University Of Maine At Orono, Maine, Cooperative Wildlife Research Unit, United States Army Engineer Division, New England Division Jan 1981

Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix F: Terrestrial Ecosystem Analysis (Supplement 2), University Of Maine At Orono, Maine, Cooperative Wildlife Research Unit, United States Army Engineer Division, New England Division

Dickey-Lincoln School Lakes Project

The overall study area encompassed the St. John River and its major tributaries; including the Little and Big Black Rivers (and their tributaries); and all lands extending 3.2 km (2 mi) beyond the maximum elevation of thv predicted impoundment of the Dickey Dam (1,560 km ). Research was concentra-ted in a portion of this area roughly bounded on the north by Chimenticook Stream, on the east by the St. John River, on the west by the United States-Canadian border, and on the south by a line drawn east-west through Seven Islands (Figure 1.0-1). Intensive marten studies were restricted to townships …


Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix K: Fish & Wildlife Mitigation Plan & Impacts (Revised), New England Division, United States Army Engineer Division Jan 1980

Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix K: Fish & Wildlife Mitigation Plan & Impacts (Revised), New England Division, United States Army Engineer Division

Dickey-Lincoln School Lakes Project

The proposed plan is comprised of three major segments: terrestrial, fisheries and endangered species. Each segment is essentially a self-contained unit. All costs for the three segments including land acquisition, operation and maintenance and capital equipment, are to be charged to the project and allocated to the project purposes of hydroelectric generation and flood control.


Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix F: Terrestrial Ecosystem Analysis (Supplement), New England Division, United States Army Engineer Division Jan 1978

Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix F: Terrestrial Ecosystem Analysis (Supplement), New England Division, United States Army Engineer Division

Dickey-Lincoln School Lakes Project

Construction of the proposed Dickey-Lincoln School Lakes Project in Aroostook County, Maine will result in the isolation of an area of land due to the impoundment behind Dickey Dam. This land area is located between the United States - Canadian border, the Little Black River, the impoundment (elevation = 913 feet), the Big Black River, and the Shields Branch of the Big Black River, and comprises 183,768 acres of land. A previous report (ERT, 1977) determined the forest types within two miles of the impoundment but did not extend to the Canadian border. This report addresses the forest types


Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix G: Recreation Resources (Revised June 1978), U.S. Army, Corps Of Engineers, New England Division, Northern Maine Regional Planning Commission, Land Use Consultants, Inc. Jan 1978

Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix G: Recreation Resources (Revised June 1978), U.S. Army, Corps Of Engineers, New England Division, Northern Maine Regional Planning Commission, Land Use Consultants, Inc.

Dickey-Lincoln School Lakes Project

The purpose of this report is to evaluate and describe the existing recreational use and resources of the project area and the encompassing study area and to project the future use of those resources both with and without the Dickey-Lincoln School Lakes Project. The primary impact area of the proposed project (project area) includes the St. John River watershed upstream of the proposed damsites to the confluence of Nine-mile Brook. The area is bounded by the watershed divide with the Allagash River on the east and the Canadian Border on the west. Major tributaries of the St. John affected by …


Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix E: Aquatic Ecosystem And Fisheries Studies, Christoipher J. Schmitt, James R. Beltz, Normandeau Associates, Inc., New England Division, United States Army Engineer Division Jan 1977

Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix E: Aquatic Ecosystem And Fisheries Studies, Christoipher J. Schmitt, James R. Beltz, Normandeau Associates, Inc., New England Division, United States Army Engineer Division

Dickey-Lincoln School Lakes Project

Throughout this report, the following naming conventions will be used: the study area is the region of the Saint John River from Fort Kent to Ninemile Bridge and the drainage areas of all Saint John tributaries between Lincoln School and Ninemile Bridge within the United States, excluding the Allagash River drainage; the Dickey Lake Area is that region which would be inundated by the proposed Dickey Dam and the drainage areas of all rivers and streams (excluding the Saint John River) flowing into that proposed reservoir; the Lincoln School Reservoir area is that region which would be inundated by the …


Recommendations Of Alternative System Plans And Transmission Corridors For The Dickey/Lincoln School Hydroelectric Project, Vtn Environmental Sciences (Firm), Interior Jan 1976

Recommendations Of Alternative System Plans And Transmission Corridors For The Dickey/Lincoln School Hydroelectric Project, Vtn Environmental Sciences (Firm), Interior

Dickey-Lincoln School Lakes Project

The regional scope of this study (a three state area of approximately 33,000 square miles) necessitated an initial investigation to determine what data was available. Known and potential sources of data were identified through the use of the Environmental Data Reconnaissance Report* prepared by Comitta Frederick Associates for the United States Depart-ment of the Interior in March 1976. The collected data was then analyzed for its accuracy, reliability, mappability and compatibility with the scope of this study.