Dickey-Lincoln School Lakes Project: Transmission System Planning Study, United States Department Of The Interior
Dickey-Lincoln School Lakes Project: Transmission System Planning Study, United States Department Of The Interior
Dickey-Lincoln School Lakes Project
The purpose of this report is to investigate various transmission system alternatives and recommend a plan of service to integrate power from the Dickey-Lincoln School Lakes (D-L) Project into the New England electric power transmission system.
Dickey-Lincoln School Lakes Project Power Alternatives Study : Task 2 Report, Acres American Incorporated
Dickey-Lincoln School Lakes Project Power Alternatives Study : Task 2 Report, Acres American Incorporated
Dickey-Lincoln School Lakes Project
This report presents the results of Task 2 of this study, the overall purpose of which is the evaluation of alternative methods of providing electrical energy in New England in lieu of the Dickey-Lincoln hydroelectric project. The final Task 1 report was presented in July 1976 and will, in conjunction with this Task 2 and subsequent Tasks 3 and 4 reports, ultimately become part of the "Environmental Impact Statement" for the Dickey-Lincoln Project.
Dickey-Lincoln School Lakes Project Power Alternatives Study Draft Report : Task 1 Through 4, Acres American Incorporated
Dickey-Lincoln School Lakes Project Power Alternatives Study Draft Report : Task 1 Through 4, Acres American Incorporated
Dickey-Lincoln School Lakes Project
This report presents the detailed findings of Tasks 1 through 4 of the Dickey-Lincoln School Lakes Project Power Alternatives Study undertaken for the New England Division of the Corps of Engineers, by Acres American Incorporated, Consulting Engineers of Buffalo, New York under the terms of Contract Number DACW33-76-C-0047. Earlier reports on Task 1 dated July 1976, on Task 2 dated January 1977 and on Task 3 dated March 1977 have been incorporated virtually unchanged into this Task 4 report.