Open Access. Powered by Scholars. Published by Universities.®
- Keyword
-
- Electric lines (8)
- Hydroelectric power plants (8)
- Environmental impact statements (7)
- Energy policy (6)
- Electric power transmission (5)
-
- Maine (5)
- Water resources development (5)
- Dams (4)
- New England (4)
- Saint John River Valley (Me. and Quebec) (3)
- Aroostook County (2)
- Ecology (2)
- Human beings (2)
- Saint John River Valley (Me. and Québec) (2)
- Aroostook (1)
- Aroostook County (Me.) (1)
- Bird populations (1)
- Camping (1)
- Electric power-plants (1)
- Forest reserves (1)
- Historical-archeological impact study (1)
- Lakes (1)
- New Hamsphire (1)
- Recreation (1)
- Saint John River Valley (Me. and Québec) Maine (1)
- Saint John River Watershed (ME) (1)
- Saint John River Watershed (Me. and N.B.) (1)
- Socio-economic impact study (1)
- United States (1)
- Visual-recreation resources (1)
Articles 1 - 17 of 17
Full-Text Articles in Fresh Water Studies
Dickey-Lincoln School Lakes Transmission Project: Final Environmental Impact Statement: Appendix L, New England Division, United States Army Corps Of Engineers, United States Department Of Energy
Dickey-Lincoln School Lakes Transmission Project: Final Environmental Impact Statement: Appendix L, New England Division, United States Army Corps Of Engineers, United States Department Of Energy
Dickey-Lincoln School Lakes Project
This draft EIS Supplement describes the environmental impacts of updated transmission plans of the Department of Energy (DOE) for the proposed Dickey-Lincoln School Lakes Project. Energy produced by the project is to be integrated into the New England electric system if the project is constructed.
Dickey-Lincoln School Lakes Project At Dickey, Maine : Final Environmental Statement, Volume 1-4, U. S. Army Engineer Division, New England
Dickey-Lincoln School Lakes Project At Dickey, Maine : Final Environmental Statement, Volume 1-4, U. S. Army Engineer Division, New England
Dickey-Lincoln School Lakes Project
The proposed Dickey-Lincoln School Lakes Project in northern Maine is a multipurpose installation on the St.John River. The combination hydroelectric power and flood control project is located in Aroostook County, Maine, near the Canadian border. The two proposed earth fill dams located at Dickey are 10,200 feet in length with a maximum height of 335 feet. They would impound 7.7 million acre feet of water at a maximum pool elevation 910 feet mean sea level. A second earth filled dam located 11 miles downstream at Lincoln School would serve as a regulatory dam. It would be 2100 feet in lenqth, …
Fish And Wildlife Mitigation Report : Dickey-Lincoln School Lakes Project, Maine, New England Division, Corps Of Engineers, U. S. Army Engineer Division
Fish And Wildlife Mitigation Report : Dickey-Lincoln School Lakes Project, Maine, New England Division, Corps Of Engineers, U. S. Army Engineer Division
Dickey-Lincoln School Lakes Project
The Dickey Lincoln School Lakes Project is a proposed multipurpose project located on the upper reaches of the St. John River in Aroostook County, Maine. Development would consist of two dams with associated reservoirs and hydroelectric generating facilities, five dikes and transmission lines. A more detailed description of the proposed project and its associated impacts is contained within the Revised Draft Environmental Impact Statement for the proposed project.
Dickey-Lincoln School Lakes Project At Dickey, Maine : Draft Supplement Environmental Impact Statement, U.S. Army Engineer Division, New England Division
Dickey-Lincoln School Lakes Project At Dickey, Maine : Draft Supplement Environmental Impact Statement, U.S. Army Engineer Division, New England Division
Dickey-Lincoln School Lakes Project
The purpose of this Draft Supplement (SDEIS) to the Revised Draft Environmental Impact Statement (RDEIS) is to evaluate the environmental impacts of the Fish and Wildlife Mitigation Plan proposed for Implementation in conjunction with development of the Dickey-Lincoln School Lakes Project, Maine (Appendix K, RDEIS and Attachment 1 of the Report). Although the mitigation plan is intended to mitigate rather than impose adverse environmental impacts, the mitigation measures proposed do constitute a major Federal action requiring the development of a supplemental environmental impact statement pursuant to the National Environmental Policy Act of 1969.
Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix G: Recreation Resources (Revised June 1978), U.S. Army, Corps Of Engineers, New England Division, Northern Maine Regional Planning Commission, Land Use Consultants, Inc.
Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix G: Recreation Resources (Revised June 1978), U.S. Army, Corps Of Engineers, New England Division, Northern Maine Regional Planning Commission, Land Use Consultants, Inc.
Dickey-Lincoln School Lakes Project
The purpose of this report is to evaluate and describe the existing recreational use and resources of the project area and the encompassing study area and to project the future use of those resources both with and without the Dickey-Lincoln School Lakes Project. The primary impact area of the proposed project (project area) includes the St. John River watershed upstream of the proposed damsites to the confluence of Nine-mile Brook. The area is bounded by the watershed divide with the Allagash River on the east and the Canadian Border on the west. Major tributaries of the St. John affected by …
Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix A, United States Department Of Energy
Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix A, United States Department Of Energy
Dickey-Lincoln School Lakes Project
The U.S. Departments of the Interior and Energy have conducted system planning, location, and environmental studies for the trans-mission facilities required for the Dickey-Lincoln School Hydroelectric Project. These studies of many alternate routes have resulted in iden-tification of a proposed transmission line route, and an environmental impact statement, as required by the National Environmental Policy Act of 1969. This report, documenting an early phase of the overall studies, was first published by the Department of the Interior in February 1977. It is being republished as Appendix A to the DOE Environmental Impact Statement for the project.
Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix H: Socio-Economic Impact Study, Edward C. Jordan Co., Inc., United States Department Of Energy
Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix H: Socio-Economic Impact Study, Edward C. Jordan Co., Inc., United States Department Of Energy
Dickey-Lincoln School Lakes Project
The principal objective of this study is to identify the major types and intensity of social and economic impacts anticipated with the proposed pre-construction, construction, operation and maintenance of the Dickey-Lincoln transmission line. In order to address the types of anticipated impacts it was necessary to first develop a socio-economic profile of the affected area.
Draft Environmental Impact Statement : Dickey-Lincoln School Lakes Transmission Project, United States Department Of Energy
Draft Environmental Impact Statement : Dickey-Lincoln School Lakes Transmission Project, United States Department Of Energy
Dickey-Lincoln School Lakes Project
This draft environmental impact statement (EIS) will describe the environmental impacts of transmission plans of the Department of Energy (DOE) for the proposed Dickey-Lincoln School Lakes Project. Electric power produced by the project is to be integrated into the New England electric system if the project is constructed.
Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix J: Historical-Archeological Impact Study, Albert A. Dekin Jr., Bruce R. Donaldson, J. Lloyd Pepper, Paul A. Robinson, Edward A. Hession, Judith A. Rasson, Public Archaeology Facility Department Of Anthropology, United States Department Of Energy
Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix J: Historical-Archeological Impact Study, Albert A. Dekin Jr., Bruce R. Donaldson, J. Lloyd Pepper, Paul A. Robinson, Edward A. Hession, Judith A. Rasson, Public Archaeology Facility Department Of Anthropology, United States Department Of Energy
Dickey-Lincoln School Lakes Project
The report assessing cultural resources for the Dickey/Lincoln School Transmission Project consists of five narrative chapters, a topical bibliography, and five appendices. The scope of work, together with the USDI guidelines for cultural resource survey (included in Appendix E), comprise an attitude and approach toward prehistory which is in accord with the current state of the art, not simply in terms of cultural resource management but also in terms of contemporary standards generally recognized by practitioners of anthropological archaeology.
Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix I: Visual-Recreation Resources Impact Study, United States Department Of Energy
Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix I: Visual-Recreation Resources Impact Study, United States Department Of Energy
Dickey-Lincoln School Lakes Project
The U.S. Departments of the Interior and Energy have conducted system planning, location, and environmental studies for the transmission facilities required for the Dickey-Lincoln School Hydroelectric Project. These studies of many alternate routes have resulted in identification of a proposed transmission line route, and an environmental impact statement as required by the National Environmental Policy Act of 1969. This report, one of several covering various topical areas, is published as an appendix to that statement.
Final Report On The Recreation Plan For Dickey-Lincoln School Lakes Project, Maine : Prepared For The Corps Of Engineers, New England Division, Northern Maine Regional Planning Commission, Land Use Consultants, Inc
Final Report On The Recreation Plan For Dickey-Lincoln School Lakes Project, Maine : Prepared For The Corps Of Engineers, New England Division, Northern Maine Regional Planning Commission, Land Use Consultants, Inc
Dickey-Lincoln School Lakes Project
The purpose of this report is to evaluate and describe the existing recreational use and resources of the project area and the encompassing study area and to project the future use of those resources both with and without the Dickey-Lincoln School Lakes Project. This study develops and evaluates a concept plan for the recreation potential of the Dickey-Lincoln School project and assesses the recreational impact of this recommended concept plan.
Economic Impacts Summary : Dickey-Lincoln School Lakes Project, Edward C. Jordan Co. Inc, United States Army Corps Of Engineers, New England Division
Economic Impacts Summary : Dickey-Lincoln School Lakes Project, Edward C. Jordan Co. Inc, United States Army Corps Of Engineers, New England Division
Dickey-Lincoln School Lakes Project
Objective of this study will be to assess Dickey-Lincoln in terms of its attainment of project objectives. How will this be done? The Water Resources Council in "Water and Related Land Resources -Establishment of Principles and Standards for Planning"' states that: The overall purpose of water and land resource planning is to promote the quality of life, by reflecting society's preferences for attainment of the objectives...
Transmission Reconnaissance Study : Dickey-Lincoln School Lakes Project, United States Department Of Interior
Transmission Reconnaissance Study : Dickey-Lincoln School Lakes Project, United States Department Of Interior
Dickey-Lincoln School Lakes Project
Two dams are proposed on the St. John River in northern Maine: Dickey, a high earth filled dam immediately above the confluence of the Allagash with the St. John, will have an installed generating capacity of 760 MW; and Lincoln School Dam, 11 miles downstream, a capacity of 70 MW. These dams are scheduled for completion during the mid 1980's. The U.S. Corps of Engineers, New England Division, has been allocated funds to design the project and prepare their own environmental impact statement. This report (Transmission Reconnaissance Studies) discusses alternative transmission facilities needed to connect the project with the New …
Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada: Design Memorandum No. 4a: General Design (Revised), New England Division, United States Corps Of Engineers
Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada: Design Memorandum No. 4a: General Design (Revised), New England Division, United States Corps Of Engineers
Dickey-Lincoln School Lakes Project
This design memorandum presents for review the revised general plan and data for the Dickey-Lincoln School Lakes project, Maine, U.S.A. and Quebec, Canada to provide the basis for preparation of detailed design memoranda, plans and specifications. This document presents revisions to the basic project plan and related data included in the 1967 General Design Memorandum reflecting current water resource requirements. This memorandum serves as a functional design document and 1s presented 1n Phase II level of detail. However, 1n view of the long period of Inactivity, Phase I features have also been incorporated for continuity of project information.
Transmission Planning Summary : Dickey-Lincoln School Lakes Project Transmission Studies, United States Department Of Interior
Transmission Planning Summary : Dickey-Lincoln School Lakes Project Transmission Studies, United States Department Of Interior
Dickey-Lincoln School Lakes Project
This report summarizes the results of system planning, environmental, and location studies for transmission facilities associated with the proposed Dickey-Lincoln School Lakes Project in northern Maine. The studies recommend the construction of two 345-kV transmission circuits from a substation near the project along a route through western Maine into northern New Hampshire and Vermont. The plan will integrate the power produced by the project into the New England Power Pool Transmission System. Five alternate integration plans were identified and studied. Of the five plans, the recommended plan, which calls for the lines to be suspended from a single row of …
[Letter From New England Regional Director To Division Engineer, New England Division, U.S. Army Corps Of Engineers], U.S. Fish And Wildlife Service
[Letter From New England Regional Director To Division Engineer, New England Division, U.S. Army Corps Of Engineers], U.S. Fish And Wildlife Service
Dickey-Lincoln School Lakes Project
The results of appraisals conducted jointly by this Service, the Maine Department of Inland Fisheries and Wildlife, and your agency concerning bald eagle, osprey, peregrine falcon, and great blue heron.
Hydroelectric Power Potential At Corps Of Engineers Projects : A Report, Ralph L. Trisko, United States. Army., Institiute For Water Resources
Hydroelectric Power Potential At Corps Of Engineers Projects : A Report, Ralph L. Trisko, United States. Army., Institiute For Water Resources
Dickey-Lincoln School Lakes Project
This report completes phase one of the study. It is intended to fill the need, recognized at the outset, for a broad framework within which subsequent more detailed study at the project level might take place. It is an overview of physical hydropower potential in the context of energy and water resources and demands, energy economics, and federal policy, organization, and practices pertaining to hydropower development and marketing.