Open Access. Powered by Scholars. Published by Universities.®
- Keyword
-
- Ecology (2)
- Hydroelectric power plants (2)
- Aroostook County (1)
- Canoeing (1)
- Conservation (1)
-
- Dams (1)
- Drainage Basins (1)
- Energy policy (1)
- Environmental impact statements (1)
- Erosion (1)
- Fishing (1)
- Headwaters (1)
- Hydrologic Features (1)
- Kayaking (1)
- Maine (1)
- Outdoor Recreation (1)
- Rafting (1)
- Rapids (1)
- Rivers (1)
- Streams (1)
- Water Falls (1)
- Water Resources (1)
- Watersheds (1)
- Whitewater Rapids (1)
- Publication Type
Articles 1 - 3 of 3
Full-Text Articles in Fresh Water Studies
Maine's Whitewater Rapids And Their Relevance To The Critical Areas Program, Janet Mcmahon
Maine's Whitewater Rapids And Their Relevance To The Critical Areas Program, Janet Mcmahon
Maine Collection
Maine's Whitewater Rapids and Their Relevance to the Critical Areas Program
by Janet McMahon
Planning Report No. 74, Critical Areas Program, 184 State St., Augusta, Maine,
April, 1981 (additions made in October, 1981). Reprinted July, 1983.
Contents: Introduction / Natural History of Whitewater Rapids / Methods / Criteria / Results / Conclusions / General Evaluation of Whitewater Rapids for Inclusion on the Register of Critical Areas / Bibliography / Action Plan
Dickey-Lincoln School Lakes Project Economic Analysis Study, New England Division, United States Army Engineer Division, Acres American Incorporated
Dickey-Lincoln School Lakes Project Economic Analysis Study, New England Division, United States Army Engineer Division, Acres American Incorporated
Dickey-Lincoln School Lakes Project
The purpose of this study was to perform an economic assessment of the Dickey-Lincoln School Lakes Project. This was accomplished by simulating the New England electrical supply system with and without the project and making a comparison of the resultant production costs.
Dickey-Lincoln School Lakes Project At Dickey, Maine : Final Environmental Statement, Volume 1-4, U. S. Army Engineer Division, New England
Dickey-Lincoln School Lakes Project At Dickey, Maine : Final Environmental Statement, Volume 1-4, U. S. Army Engineer Division, New England
Dickey-Lincoln School Lakes Project
The proposed Dickey-Lincoln School Lakes Project in northern Maine is a multipurpose installation on the St.John River. The combination hydroelectric power and flood control project is located in Aroostook County, Maine, near the Canadian border. The two proposed earth fill dams located at Dickey are 10,200 feet in length with a maximum height of 335 feet. They would impound 7.7 million acre feet of water at a maximum pool elevation 910 feet mean sea level. A second earth filled dam located 11 miles downstream at Lincoln School would serve as a regulatory dam. It would be 2100 feet in lenqth, …