Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring Commons

Open Access. Powered by Scholars. Published by Universities.®

Groundwater

Discipline
Institution
Publication Year
Publication
Publication Type

Articles 61 - 90 of 192

Full-Text Articles in Environmental Monitoring

Silver Bow Creek Butte Area Npl Site Spring Semi-Annual 2024 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson Dec 2024

Silver Bow Creek Butte Area Npl Site Spring Semi-Annual 2024 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report (Dated September 16, 2024), Emma Rott Dec 2024

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report (Dated September 16, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan, Pioneer Technical Services, Inc. Dec 2024

Draft Final Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp) (Dated September 25, 2024), Emma Rott Nov 2024

Comment Letter For Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp) (Dated September 25, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Draft Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Draft Data Summary Report 2019-2023 (Dated October 3, 2024), Emma Rott Nov 2024

Re: Comment Letter For Draft Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Draft Data Summary Report 2019-2023 (Dated October 3, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Bpsou Draft Phase I Design Investigation Evaluation Report (Dated September 25, 2024), Emma Rott Nov 2024

Re: Comment Letter For Bpsou Draft Phase I Design Investigation Evaluation Report (Dated September 25, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System, Josh Bryson Oct 2024

Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System, Josh Bryson Oct 2024

Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2024 Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study, Pioneer Technical Services, Inc. Oct 2024

2024 Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Proposed Plan To Amend The Remedial Action For The Butte Priority Soils Operable Unit, Environmental Protection Agency Oct 2024

Proposed Plan To Amend The Remedial Action For The Butte Priority Soils Operable Unit, Environmental Protection Agency

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2023, Pioneer Technical Services, Inc. Oct 2024

Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2023, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2023, Pioneer Technical Services, Inc. Oct 2024

Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2023, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2023, Pioneer Technical Services, Inc. Oct 2024

Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2023, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2024 Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Sep 2024

2024 Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report, Stantec Consulting Services, Inc. Sep 2024

Draft Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report, Stantec Consulting Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Groundwater Model Technical Memorandum, Stantec Consulting Services, Inc. Sep 2024

Groundwater Model Technical Memorandum, Stantec Consulting Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Appendix D Comparison Of Historical Coc Results To Groundwater Remedial Goals, Stantec Consulting Services, Inc. Sep 2024

Appendix D Comparison Of Historical Coc Results To Groundwater Remedial Goals, Stantec Consulting Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2024 Draft Blacktail Creek Remediation And Contaminated Groundwater Hydraulic Control Site Pre-Design Investigation Work Plan, Stantec Consulting Services, Inc. Sep 2024

2024 Draft Blacktail Creek Remediation And Contaminated Groundwater Hydraulic Control Site Pre-Design Investigation Work Plan, Stantec Consulting Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2024, Pioneer Technical Services, Inc. Sep 2024

Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2024, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Modification, Transport, And Sources Of Hydrocarbon Oxidation Products From Groundwater At Crude Oil And Diesel Spill Sites In Minnesota: Unveiling Common “Theems” Via Spectroscopy & Chromatography, Eduardo E. Turcios Valle May 2024

Modification, Transport, And Sources Of Hydrocarbon Oxidation Products From Groundwater At Crude Oil And Diesel Spill Sites In Minnesota: Unveiling Common “Theems” Via Spectroscopy & Chromatography, Eduardo E. Turcios Valle

LSU New Orleans Theses and Dissertations

In this thesis, petroleum-contaminated groundwater from three spill-affected Minnesota sites—two contaminated with crude oil; one with diesel—is investigated to elucidate whether differences in degradation products from different parent oils exist. After spill events, parent molecules from the leaked oil seep underground and undergo microbial degradation over time, transforming into hydrocarbon oxidation products (HOPs), water-soluble contaminants that infiltrate groundwater aquifers, flowing into nearby environments and towns while exhibiting environmental persistence, toxicity to aquatic biota, and potential risks to humans that become exposed. Spectroscopic and chromatographic study of the structural themes and spatial distributions of HOPs reveals preferential degradation of aliphatic (biolabile) …


Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2022, Pioneer Technical Services, Inc. Mar 2024

Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2022, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2022, Pioneer Technical Services, Inc. Mar 2024

Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2022, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System -Third Quarter 2022 (Dated November 16, 2023), Emma Rott Feb 2024

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System -Third Quarter 2022 (Dated November 16, 2023), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Influence Of Elevation On Plant Survivorship In Baduwa’T Estuary, Richard Louis Toledo Jr., Celine Aguilera, Rivé Prater, Claire Durbin Jan 2024

Influence Of Elevation On Plant Survivorship In Baduwa’T Estuary, Richard Louis Toledo Jr., Celine Aguilera, Rivé Prater, Claire Durbin

Undergraduate Scholarship

The Baduwa’t is a river in Humboldt County, California that has been adversely impacted by agricultural operations. Disturbances from agriculture have altered the surrounding ecosystems and hydrology of the river. The conservation stewardship group, California Trout, initiated a collaborative restoration project that created a new channel and off-channel pond to provide habitat for salmonids and other native fish in the estuary. As an extension of this project, sections of the site underwent revegetation efforts. The survivorship rates of this new vegetation were lower than anticipated and we were asked by California Trout to assess if the elevation on the site …


Groundwater Vulnerability Assessment And Dye Trace Of War Fork River In Daniel Boone National Forest, Will Hemenover Jan 2024

Groundwater Vulnerability Assessment And Dye Trace Of War Fork River In Daniel Boone National Forest, Will Hemenover

Mahurin Honors College Capstone Experience/Thesis Projects

Daniel Boone National Forest plays a key role in preserving much of Kentucky’s karst regions, natural resources including timber, mineral deposits, and biodiversity, including over 300 species of concern. The health of these environments is determined by surface and groundwater streams in the forest, and karst systems are an integral environment where these systems are active. War Fork, a tributary to the Kentucky River in Jackson County, Kentucky, is a remote and understudied hydrologic system in the Daniel Boone National Forest that contains recreational and logging land uses. Due to karst areas being susceptible to contamination because of rapid water …


Assessing Microplastic Contamination Within Karst Groundwater Basins In Kentucky, Maaz Fareedi Jan 2024

Assessing Microplastic Contamination Within Karst Groundwater Basins In Kentucky, Maaz Fareedi

Theses and Dissertations--Earth and Environmental Sciences

The input and abrasion of plastic waste in the environment has long been known to form microplastics (MPs). These ubiquitous contaminants are easily mobilized into hydrologic systems. MPs are now being found in karst aquifers around the world, including several across Kentucky, USA. Due to their size (< 5 mm in diameter), chemical properties, abundance, and wide distribution, MPs pose numerous ecological hazards, including uptake by organisms and as substrates for contaminant sorption. Karst groundwater is especially vulnerable to surface contaminants; however, knowledge of the extent of karst MP contamination is limited, with most studies focused on individual sites or small areas. In this study, we created a MP contamination dataset for 30 karst springs and 10 locations where cave sediments were characterized across Kentucky. MP concentrations in groundwater samples ranged from 0 to 41.1 items/L and yielded an average of 4.9 ± 8.7 items/L. Sediment MP concentrations ranged from 0 to 306 items/kg. We performed statistical analyses and linear regressions to examine whether groundwater MP concentrations could be explained by factors including land use, population density, basin area, numbers of sinkholes, and sinking streams. Our models revealed that population density, agrarian land use, sinking stream density, and basin area were related to MP concentrations. All factors except basin area trended positively with MP concentration, while basin area trended negatively. These relations are generally corroborated by existing literature, however they indicate that further studies with considerably larger sample sizes are needed to determine mechanistic relationships.


Geoelectrical And Hydrochemical Characterization Of Submarine Groundwater Discharge In Florida Bay, Ifeanyi Emmanuel Eze Jan 2024

Geoelectrical And Hydrochemical Characterization Of Submarine Groundwater Discharge In Florida Bay, Ifeanyi Emmanuel Eze

College of Graduate Studies: Theses & Dissertations

Florida Bay, situated at the southern tip of Everglades National Park and underlain by the Miami Limestone formation, is an ecosystem of global significance. Over the past century, the bay has faced threats such as droughts, seagrass mortality, and hypersalinity. Despite various studies and management efforts, the dynamics of submarine groundwater discharge (SGD) in the region remain underexplored. Given that SGD plays a significant role in the chemical dynamics of coastal ecosystems, it warrants thorough investigation. This study aims to characterize the spatial and temporal patterns of SGD in Florida Bay by surveying three basins – Rankin, Whipray, and Rabbit …


Draft Final Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan, Pioneer Technical Services, Inc. Dec 2023

Draft Final Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2022, Pioneer Technical Services, Inc. Nov 2023

Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2022, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Bpsou Buffalo Gulch Forebay Parcel 2023 Expedited Well Abandonment Plan, Josh Bryson Oct 2023

Bpsou Buffalo Gulch Forebay Parcel 2023 Expedited Well Abandonment Plan, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.