Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring Commons™

Open Access. Powered by Scholars. Published by Universities.®

2026

Discipline
Institution
Keyword
Publication
Publication Type
File Type

Articles 511 - 540 of 597

Full-Text Articles in Environmental Monitoring

Final Repository Siting Study (Rss) Detailed Evaluation And Recommendations Report, Atlantic Richfield Company, Butte Silver Bow Feb 2026

Final Repository Siting Study (Rss) Detailed Evaluation And Recommendations Report, Atlantic Richfield Company, Butte Silver Bow

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2022 Unreclaimed Sites Sampling: Ur-28 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Feb 2026

Final 2022 Unreclaimed Sites Sampling: Ur-28 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Monthly Progress Report Butte Priority Soils Operable Unit Consent Decree Partial Remedial Design/Remedial Action And Operation And Maintenance January 2026, Josh Bryson Feb 2026

Monthly Progress Report Butte Priority Soils Operable Unit Consent Decree Partial Remedial Design/Remedial Action And Operation And Maintenance January 2026, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


The World's Largest Saddle Dam At Risk: Multisensor Geohazard Analysis And Downstream Impacts, Hesham El-Askary, Hesham Morgan, Surendra Maharjan, Ali Elgendy, Wenzhao Li, Rejoice Thomas, Austin Madson, Cyril Rakovski Feb 2026

The World's Largest Saddle Dam At Risk: Multisensor Geohazard Analysis And Downstream Impacts, Hesham El-Askary, Hesham Morgan, Surendra Maharjan, Ali Elgendy, Wenzhao Li, Rejoice Thomas, Austin Madson, Cyril Rakovski

Mathematics, Physics, and Computer Science Faculty Articles and Research

The Grand Ethiopian Renaissance Dam (GERD) Saddle Dam, which holds approximately 89% of the main reservoir's live storage, is one of the largest and most critical auxiliary dams globally; its construction on Ethiopia's Blue Nile has consequently raised significant regional and international concerns regarding potential environmental impacts and geohazard risks. This study presents a comprehensive risk assessment of the GERD Saddle Dam by integrating high-resolution satellite data (GRACE, Sentinel-1, Sentinel-2, WorldView-3), hydrological modeling (SWAT), Persistent Scatterer Interferometry (PSI), geospatial analysis, and advanced statistical techniques. The results highlight critical structural vulnerabilities, including groundwater infiltration estimated at approximately 41 ± 6.2 billion …


Silver Bow Creek Conservation Area Final Principles For A Greener Cleanup Report, Woodard & Curran Feb 2026

Silver Bow Creek Conservation Area Final Principles For A Greener Cleanup Report, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2020 Through 2024 Surface Water Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Feb 2026

2020 Through 2024 Surface Water Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2020 Through 2024 Groundwater Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Feb 2026

2020 Through 2024 Groundwater Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2020 Through 2024 Groundwater Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Feb 2026

2020 Through 2024 Groundwater Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Response To Agency Comments Re: Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2020 Groundwater Compliance And Interpretation Technical Memorandum (Dated May 12, 2022, Josh Bryson Feb 2026

Response To Agency Comments Re: Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2020 Groundwater Compliance And Interpretation Technical Memorandum (Dated May 12, 2022, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2020 Through 2024 Groundwater Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Feb 2026

2020 Through 2024 Groundwater Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2020 Through 2024 Groundwater Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Feb 2026

2020 Through 2024 Groundwater Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2020 Through 2024 Groundwater Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Feb 2026

2020 Through 2024 Groundwater Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2020 Through 2024 Surface Water Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Feb 2026

2020 Through 2024 Surface Water Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Response To Agency Comments Re: Comment Letter For The 2023 Butte Priority Soils Operable Unit (Bpsou) Groundwater Compliance Evaluation (Dated March 10, 2025) Received May 7, 2025, Josh Bryson Feb 2026

Response To Agency Comments Re: Comment Letter For The 2023 Butte Priority Soils Operable Unit (Bpsou) Groundwater Compliance Evaluation (Dated March 10, 2025) Received May 7, 2025, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Response To Agency Comments Re: Comment Letter For The 2022 Butte Priority Soils Operable Unit (Bpsou) Groundwater Compliance Evaluation (Dated March 10, 2025), Josh Bryson Feb 2026

Response To Agency Comments Re: Comment Letter For The 2022 Butte Priority Soils Operable Unit (Bpsou) Groundwater Compliance Evaluation (Dated March 10, 2025), Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Response To Agency Comments Re: Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) Draft Surface Water Compliance And Interpretation Technical Memorandum (Dated May 12, 2022), Josh Bryson Feb 2026

Response To Agency Comments Re: Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) Draft Surface Water Compliance And Interpretation Technical Memorandum (Dated May 12, 2022), Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2020 Through 2024 Surface Water Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Feb 2026

2020 Through 2024 Surface Water Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2020 Through 2024 Surface Water Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Feb 2026

2020 Through 2024 Surface Water Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2020 Through 2024 Surface Water Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Feb 2026

2020 Through 2024 Surface Water Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 37 – Josephine Shaft Site Evaluation Summary Report, Pioneer Technical Services, Inc. Feb 2026

Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 37 – Josephine Shaft Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


To Hold Or Sell Breeding Cattle In The Rangelands, Department Of Primary Industries And Regional Development, Western Australia Feb 2026

To Hold Or Sell Breeding Cattle In The Rangelands, Department Of Primary Industries And Regional Development, Western Australia

Animal production and livestock factsheets

In a dry season where feed, water and finances are limited, removing less productive animals as soon as possible is a good option. This will free up feed for more productive animals and help preserve ground cover.

This page provides some of the information and a process for making decisions about holding or selling breeding cattle.


Lc-Ms/Ms Method Development For The Analysis Of Cannabinoids In Wastewater, Abigail M. Castellanos, Ava La Lande Feb 2026

Lc-Ms/Ms Method Development For The Analysis Of Cannabinoids In Wastewater, Abigail M. Castellanos, Ava La Lande

The Kean Review: Journal in Student Research

The goal of this research was to establish a reliable method to detect the presence of cannabinoids in wastewater and increase the sensitivity of detection. Since the legalization of cannabis in many states, toxicology research has expanded on methods of detection in hopes of identifying usage patterns. At the Joint Meeting of Essex and Union Counties, it was established that cannabinoids are not thoroughly accounted for in the process of filtering wastewater in addition to our limited understanding of consumption trends. This stands true for many wastewater facilities, especially as the intake of cannabis remains prevalent for various populations across …


Fisheries Management Paper No. 311: West Coast Deep Sea Crustacean Resource Harvest Strategy, Department Of Primary Industries And Regional Development, Western Australia Feb 2026

Fisheries Management Paper No. 311: West Coast Deep Sea Crustacean Resource Harvest Strategy, Department Of Primary Industries And Regional Development, Western Australia

Fisheries Management Papers

Harvest strategies for Western Australia’s (WA) aquatic resources are formal documents developed by the Department of Primary Industries and Regional Development (DPIRD, the Department) to support decision-making processes that ensure the outcomes are consistent with the principles of Ecologically Sustainable Development (ESD; Fletcher 2002a) and Ecosystem Based Fisheries Management (EBFM; Fletcher et al. 2012). Harvest strategies are a key component of all contemporary fishery management systems and a requirement for certification under the Marine Stewardship Council (MSC). The objectives of ESD are reflected in the objectives of the Fish Resources Management Act 1994 (FRMA).

This West Coast Deep Sea Crustacean …


Final 2022 Unreclaimed Sites Sampling: Ur-12 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Feb 2026

Final 2022 Unreclaimed Sites Sampling: Ur-12 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2022 Unreclaimed Sites Sampling: Ur-22 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Feb 2026

Final 2022 Unreclaimed Sites Sampling: Ur-22 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Supporting Data – Urban Stream, Cardinal Court, Isu, Normal, November 9, 2023 To May 1, 2025, Eric Wade Peterson, Ava Miller Feb 2026

Supporting Data – Urban Stream, Cardinal Court, Isu, Normal, November 9, 2023 To May 1, 2025, Eric Wade Peterson, Ava Miller

Faculty Publications - Geography, Geology, and the Environment

Between November 9, 2023 to May 1, 2025, water samples were collected upstream and downstream along a segment of a stream adjacent to Cardinal Court on the Illinois State University campus. At each location, samples were collected at the surface. In-situ measurements of Dissolved Oxygen, Specific Conductance, and Temperature were recorded with a YSI 85. Anion samples were analyzed using a Ion Chromatograph for fluoride (F-), chloride (Cl-), nitrate as nitrogen (NO3-N), phosphate (PO43-), and sulfate (SO42-). The available dataset provides the recorded field parameters and the analyzed ion concentrations.


Final 2022 Unreclaimed Sites Sampling: Ur-06 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Feb 2026

Final 2022 Unreclaimed Sites Sampling: Ur-06 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2022 Unreclaimed Sites Sampling: Ur-13 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Feb 2026

Final 2022 Unreclaimed Sites Sampling: Ur-13 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 32 – Corra 2 Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc. Feb 2026

Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 32 – Corra 2 Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 30 – Atlantic-1 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Feb 2026

Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 30 – Atlantic-1 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.