Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring Commons

Open Access. Powered by Scholars. Published by Universities.®

2025

Discipline
Institution
Keyword
Publication
Publication Type
File Type

Articles 61 - 90 of 516

Full-Text Articles in Environmental Monitoring

Advancing Environmental Monitoring At Verde River Headwaters State Park Through Integrated Remote Sensing Technologies, Ronny Schroeder, Noah Morales, Colton Weeks, Reiner Zimmermann, Erika Podest, Hank Vincent Nov 2025

Advancing Environmental Monitoring At Verde River Headwaters State Park Through Integrated Remote Sensing Technologies, Ronny Schroeder, Noah Morales, Colton Weeks, Reiner Zimmermann, Erika Podest, Hank Vincent

Sustainability Conference

The establishment of Verde River Headwaters State Park in Chino Valley, Arizona, marks a significant conservation milestone with the acquisition of 734 acres of the historic Del Rio Springs Ranch by the Trust for Public Land in March 2024. Now under the stewardship of Arizona State Parks & Trails (ASPT), this site encompasses Sullivan Lake, Del Rio Springs, critical riparian habitats, and historically significant landmarks including the 1863 Arizona territorial capital and 1920s Fred Harvey Farm structures. This initiative yields substantial benefits, including annual water savings within the Prescott Active Management Area, the extension of the Peavine National Recreation Trail, …


Elucidating The Relationship Between Water Quality And Antibiotic Resistance Of Rainwater Microbes Across Western Humboldt County, Theo P. Murphy, Eve Wendley, Justice Laskowski, Tyler Paredes Nov 2025

Elucidating The Relationship Between Water Quality And Antibiotic Resistance Of Rainwater Microbes Across Western Humboldt County, Theo P. Murphy, Eve Wendley, Justice Laskowski, Tyler Paredes

Humboldt Journal of Microbiology

Limited studies have been conducted regarding the fecal contamination and microbial dispersal through rainwater, with no known studies investigating the potential connection between antibiotic resistant microbes and water quality in rainwater. This study seeks to identify the presence of a correlation between water quality and incidence of antibiotic resistance in rainwater microbes. We hypothesize that there will be a correlation between these two variables. We additionally anticipate a high incidence of fecal contamination across rural and urban collection sites alike, with fecal contamination being more prevalent in rural areas than urban locals. To determine water quality, we measured the concentration …


Fisheries Science Update - Western Australian Shark Resource: 2024 Stock Assessment Outcomes, Department Of Primary Industries And Regional Development, Western Australia Nov 2025

Fisheries Science Update - Western Australian Shark Resource: 2024 Stock Assessment Outcomes, Department Of Primary Industries And Regional Development, Western Australia

Fisheries Science Updates

The Western Australian (WA) shark resource includes more than 100 species of sharks and rays.

Key shark species are sustainably harvested in two commercial shark fisheries that provide fresh, local, affordable seafood to the WA community.

The WA shark resource has been in recovery since the 1990s–2000s when stocks were found to be at risk.

The Department of Primary Industries and Regional Development (DPIRD) tracks stock status by undertaking periodic weight of evidence stock assessments of indicator species.

Gummy, whiskery, dusky whaler, and sandbar sharks, are the indicator species for the WA shark resource, and make up ~80% of the …


Living Shoreline Prioritization And Hydrodynamic Habitat Suitability Models For Restoration In The Indian River Lagoon And Lake Worth Lagoon, Florida, Kelly M. Kibler, Melinda J. Donnelly, Vincent Encomio, Madison Giuntoli, Manisha Thenuwara, Brice Bennett, Laura Andrade Barron, Mariam Sonbol, Wynter Raine Seppala, Namritha Ramakrishnan, Jennifer Jordan Báez, Beth Orlando, Irene Arpayoglou, Melissa Meisenburg Nov 2025

Living Shoreline Prioritization And Hydrodynamic Habitat Suitability Models For Restoration In The Indian River Lagoon And Lake Worth Lagoon, Florida, Kelly M. Kibler, Melinda J. Donnelly, Vincent Encomio, Madison Giuntoli, Manisha Thenuwara, Brice Bennett, Laura Andrade Barron, Mariam Sonbol, Wynter Raine Seppala, Namritha Ramakrishnan, Jennifer Jordan Báez, Beth Orlando, Irene Arpayoglou, Melissa Meisenburg

Indian River Lagoon Shorelines

The spatial dataset: UCF_shorelinemodel_IRL_LWL.shp, was created with support from the Indian River Lagoon National Estuaries Program and Florida Sea Grant. These projects cumulatively led to creation of a living shoreline restoration prioritization model and hydrodynamic habitat suitability models for 1,550 km (963 miles) of estuarine shorelines in Indian River Lagoon and Lake Worth Lagoon.

The dataset presented herein includes:

  1. shoreline data from >15,000 transects collected in the field,
  2. shoreline wave climate data created through hydrodynamic modeling and frequency analysis of historic data,
  3. categorization of potential risk for shoreline boat wake impact,
  4. persistence of seagrass within 210 m of the shoreline, …


Butte Priority Soils Operable Unit Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan (Qapp) Revision 0, Woodard & Curran Nov 2025

Butte Priority Soils Operable Unit Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan (Qapp) Revision 0, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan, Woodard & Curran Nov 2025

Draft 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft 2026 Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan, Woodard & Curran Nov 2025

Draft 2026 Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: 3rd Quarter 2025 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Oct 2025

Re: 3rd Quarter 2025 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Establishing A Framework Of Best Management Practices For Sustainable Water Quality: Integration Of Technology And Remote Sensing, Mason L. Marcantel Oct 2025

Establishing A Framework Of Best Management Practices For Sustainable Water Quality: Integration Of Technology And Remote Sensing, Mason L. Marcantel

LSU Master's Theses

Water quality security is a complex management issue that is constantly challenged by factors of seasonal variability in climate change, urban population growth, and agricultural intensification. These factors warrant the need for innovative technological adaptations to management practices that integrate remote monitoring, predictive modeling, and sustainable resource utilization. This study establishes a framework for sustainable water quality practices through the integration of remote sensing technology for urban wastewater treatment and agricultural irrigation systems. This dual-site research study explores seasonal water quality dynamics and technological interventions to create a more proactive approach to water quality security.

In the first study, water …


Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2024, Pioneer Technical Services, Inc. Oct 2025

Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2024, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2023, Pioneer Technical Services, Inc. Oct 2025

Revised Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2023, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Dramatic Biases In Terrestrial Nitrogen Fixation In Earth System Models Revealed By Natural Isotope Signatures, Maoyuan Fang, Shushi Peng, Philippe Ciais, Daniel S. Goll, Benjamin Z. Houlton, Ying-Ping Wang, Yilong Wang, Pan Liu, Joshua B. Fisher, Pierre Regnier Oct 2025

Dramatic Biases In Terrestrial Nitrogen Fixation In Earth System Models Revealed By Natural Isotope Signatures, Maoyuan Fang, Shushi Peng, Philippe Ciais, Daniel S. Goll, Benjamin Z. Houlton, Ying-Ping Wang, Yilong Wang, Pan Liu, Joshua B. Fisher, Pierre Regnier

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

Biological nitrogen fixation (BNF) is the primary input of new reactive nitrogen to natural terrestrial ecosystems. However, this flux is poorly constrained due to its unclear drivers and associated control mechanisms. Here, we extend the existing theory of nitrogen (N) isotope mass balance to estimate BNF rates and then use a Bayesian approach to constrain the BNF rates in natural terrestrial ecosystems by using measurements of natural N-isotope ratios (δ15N) in plants (δP) and soil (δS). Together with pairwise δP and δS measurements from 18 forest sites covering diverse climates and thousands …


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan (Dated August 29, 2025), Emma Rott Oct 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan (Dated August 29, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan Revision 0 (2025 Update) And Response To Epa Comments. (Dated September 16, 2025), Emma Rott Oct 2025

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan Revision 0 (2025 Update) And Response To Epa Comments. (Dated September 16, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-08 (Anderson Shaft) Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Oct 2025

Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-08 (Anderson Shaft) Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 32 – Corra 2 Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc. Oct 2025

Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 32 – Corra 2 Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 30 – Atlantic-1 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Oct 2025

Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 30 – Atlantic-1 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Letter Response To Butte Priority Soils Operable Unit (Bpsou) Continued Use Of The Approved Groundwater Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site (Dated September 15, 2025), Emma Rott Oct 2025

Re: Letter Response To Butte Priority Soils Operable Unit (Bpsou) Continued Use Of The Approved Groundwater Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site (Dated September 15, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Letter Response To Butte Priority Soils Operable Unit (Bpsou) Continued Use Of The Approved Surface Water Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site (Dated September 15, 2025), Emma Rott Oct 2025

Re: Letter Response To Butte Priority Soils Operable Unit (Bpsou) Continued Use Of The Approved Surface Water Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site (Dated September 15, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit Final Leak Infiltration Evaluation, Josh Bryson Oct 2025

Re: Butte Priority Soils Operable Unit Final Leak Infiltration Evaluation, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-13 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Oct 2025

Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-13 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Quantifying Single, Compound And Cascading Climate Extremes: Implications For Agricultural Resilience In California, Shahryar Fazli, Wenzhao Li, Rejoice Thomas, Surendra Maharjan, Mohammad Sina Jahangiri, Andre Daccache, Hesham Morgan, Mohamed Allali, Hesham El-Askary Oct 2025

Quantifying Single, Compound And Cascading Climate Extremes: Implications For Agricultural Resilience In California, Shahryar Fazli, Wenzhao Li, Rejoice Thomas, Surendra Maharjan, Mohammad Sina Jahangiri, Andre Daccache, Hesham Morgan, Mohamed Allali, Hesham El-Askary

Mathematics, Physics, and Computer Science Faculty Articles and Research

As climate change intensifies, extreme weather increasingly threatens California’s Central Valley (CV), a vital agricultural region exposed to rising risks from heatwaves (HW), droughts (DR), and compound extremes. These events disrupt crop productivity and broader processes like water demand, pest dynamics, and soil stability, posing systemic risks. This study examines the spatiotemporal dynamics of HW, coldwaves (CW), DR, excessive rainfall (ER), and their compound (e.g., HWDR) and cascading forms from 1951 to 2025, using NOAA nClimGrid-Daily data. We assessed trends in frequency, intensity, and duration over long-term (1951–2025) and mid-term (1981–2025) periods. Results show increasing HW and DR in the …


Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 37 – Josephine Shaft Site Evaluation Summary Report, Pioneer Technical Services, Inc. Oct 2025

Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 37 – Josephine Shaft Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 37 – Josephine Shaft Site Evaluation Summary Report, Pioneer Technical Services, Inc. Oct 2025

Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 37 – Josephine Shaft Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Draft Data Summary Report 2024 Surface Water, Groundwater, And Soil Characterization, Woodard & Curran Oct 2025

Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Draft Data Summary Report 2024 Surface Water, Groundwater, And Soil Characterization, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Microclimatic Conditions In Shulgan-Tash Cave (Southern Ural, Russia): Implications For The Preservation Of Eastern Europe’S Largest Paleolithic Art Collection, Olga Chervyatsova, Rayan Akhmedyanovb, Nailya Saifullina, Ludmila Kuzmina, Mihael Kotov, Yuri Dublyansky Oct 2025

Microclimatic Conditions In Shulgan-Tash Cave (Southern Ural, Russia): Implications For The Preservation Of Eastern Europe’S Largest Paleolithic Art Collection, Olga Chervyatsova, Rayan Akhmedyanovb, Nailya Saifullina, Ludmila Kuzmina, Mihael Kotov, Yuri Dublyansky

International Journal of Speleology

This study presents the results of a long-term investigation of the microclimatic conditions in Shulgan-Tash Cave (Southern Urals, Russia), which hosts the largest assemblage of Upper Paleolithic paintings (ca. 16.3–19.6 ka) in Eastern Europe. The cave exhibits two distinct seasonal ventilation regimes – winter and summer – differentially influence its two levels of galleries. In the Lower Level, which contains 83% of the images, near-atmospheric CO2 concentrations persist year-round, and temperature variations associated with seasonal infiltration events are minimal (1.0–1.3°C). By contrast, the Upper Level, including the decorated Hall of Paintings, is affected by downdrafts of CO2-rich …


Re: Comments On The Draft Final Butte Mine Waste Repository Geotechnical Investigation Work Plan (Dated September 23, 2025), Emma Rott Oct 2025

Re: Comments On The Draft Final Butte Mine Waste Repository Geotechnical Investigation Work Plan (Dated September 23, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soil Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 91 – Robert Emmett Dump, Mike Mcanulty Oct 2025

Re: Butte Priority Soil Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 91 – Robert Emmett Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soil Operable Unit (Bpsou) Final Bres No.94 – Rialto Dump Reclamation Improvement (Ri) Field Sampling Plan (Fsp), Mike Mcanulty Oct 2025

Re: Butte Priority Soil Operable Unit (Bpsou) Final Bres No.94 – Rialto Dump Reclamation Improvement (Ri) Field Sampling Plan (Fsp), Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2024 Residential Metals Abatement Program (Rmap) Baptist Student Union (Former Mckinley School) Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc. Oct 2025

Draft Final 2024 Residential Metals Abatement Program (Rmap) Baptist Student Union (Former Mckinley School) Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.