Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring Commons

Open Access. Powered by Scholars. Published by Universities.®

2025

Discipline
Institution
Keyword
Publication
Publication Type
File Type

Articles 391 - 420 of 516

Full-Text Articles in Environmental Monitoring

Technical Memorandum - Re: 2022 Butte Priority Soils Operable Unit (Bpsou) Groundwater Compliance Evaluation, Paddy Stoy Mar 2025

Technical Memorandum - Re: 2022 Butte Priority Soils Operable Unit (Bpsou) Groundwater Compliance Evaluation, Paddy Stoy

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Modelled Flooding Impacts On Lower Fish River Watershed, Sebastian Loschner Mar 2025

Modelled Flooding Impacts On Lower Fish River Watershed, Sebastian Loschner

Shelby Hall Graduate Research Forum Posters

This study investigates the impacts of compound flooding in the Lower Fish River watershed, Baldwin County, Alabama, with a focus on the potential effects of sea level rise due to climate change. Coastal flooding, particularly in smaller watersheds, is a growing concern as it results from the interaction of multiple factors, including rainfall, tidal changes, and extreme weather events. Compound flooding, which involves multiple flood drivers, is expected to worsen with climate change, as increased precipitation and rising sea levels create heightened flood risks. However, existing research on compound flooding predominantly focuses on large-scale watersheds, leaving a knowledge gap in …


Technical Memorandum - Re: 2022 Butte Priority Soils Operable Unit (Bpsou) Groundwater Compliance Evaluation, Paddy Stoy Mar 2025

Technical Memorandum - Re: 2022 Butte Priority Soils Operable Unit (Bpsou) Groundwater Compliance Evaluation, Paddy Stoy

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2024, Pioneer Technical Services, Inc. Mar 2025

Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2024, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2022 Unreclaimed Sites Sampling: Ur-22 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Mar 2025

Draft Final 2022 Unreclaimed Sites Sampling: Ur-22 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan (Dated December 10, 2024), Emma Rott Feb 2025

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan (Dated December 10, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – January 2025 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis Feb 2025

Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – January 2025 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comments On The Repository, Haul Route, And Pipeline Geotechnical Pre-Design Investigation Summary Report (Dated December 30, 2024), Emma Rott Feb 2025

Re: Comments On The Repository, Haul Route, And Pipeline Geotechnical Pre-Design Investigation Summary Report (Dated December 30, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2025 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Feb 2025

2025 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2025 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Feb 2025

2025 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report, Josh Bryson Feb 2025

Re: Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2025 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study, Pioneer Technical Services, Inc. Feb 2025

2025 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2025 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study, Pioneer Technical Services, Inc. Feb 2025

2025 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Perceived And Recorded Temperature In Aircraft Cabins During 143 Flights, Matthew Nicholls, Peter Vink Feb 2025

Perceived And Recorded Temperature In Aircraft Cabins During 143 Flights, Matthew Nicholls, Peter Vink

Journal of Aviation Technology and Engineering

This essay reports on the perceived and recorded temperature in aircraft cabins during 143 flights. In each flight, passengers reported their experience. They recorded temperature and humidity after boarding and one hour later. The reports show that fewer than half of the passengers perceived the temperature as “good.” Most passengers (39%) perceived it as hot, and some (17%) perceived it as cold. Comparing the temperatures with guidelines shows that 18% of the recorded temperatures in the cabin were empirically too hot and 2% empirically too cold. The differences between passengers in what they perceive as a good temperature are large, …


Draft Final 2025 Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) Annual Update (Non-Residential Parcels And Residential Daycares), Pioneer Technical Services, Inc. Feb 2025

Draft Final 2025 Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) Annual Update (Non-Residential Parcels And Residential Daycares), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2025 Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) Annual Update (Residential Parcels), Pioneer Technical Services, Inc. Feb 2025

Draft Final 2025 Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) Annual Update (Residential Parcels), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Reviews And Syntheses: Variable Inundation Across Earth’S Terrestrial Ecosystems, James Stegen, Amy J. Burgin, Michelle H. Busch, Joshua B. Fisher, Joshua Ladau, Jenna Abrahamson, Lauren Kinsman-Costello, Li Li, Xingyuan Chen, Thibault Datry, Nate Mcdowell, Corianne Tatariw, Anna Braswell, Jillian M. Deines, Julia A. Guimond, Peter Regler, Kenton Rod, Edward K. P. Bam, Etienne Fluet-Chouinard, Inke Forbrich, Kristin L. Jaeger, Teri O'Meara, Tim Scheibe, Erin Seybold, Jon N. Sweetman, Jianqiu Zheng, Daniel C. Allen, Elizabeth Herndon, Beth A. Middleton, Scott Painter, Kevin Roche, Julianne Scamardo, Ross Vander Vorste, Kristin Boye, Ellen Wohl, Margaret Zimmer, Kelly Hondula, Maggi Laan, Anna Marshall, Kaizad F. Patel Feb 2025

Reviews And Syntheses: Variable Inundation Across Earth’S Terrestrial Ecosystems, James Stegen, Amy J. Burgin, Michelle H. Busch, Joshua B. Fisher, Joshua Ladau, Jenna Abrahamson, Lauren Kinsman-Costello, Li Li, Xingyuan Chen, Thibault Datry, Nate Mcdowell, Corianne Tatariw, Anna Braswell, Jillian M. Deines, Julia A. Guimond, Peter Regler, Kenton Rod, Edward K. P. Bam, Etienne Fluet-Chouinard, Inke Forbrich, Kristin L. Jaeger, Teri O'Meara, Tim Scheibe, Erin Seybold, Jon N. Sweetman, Jianqiu Zheng, Daniel C. Allen, Elizabeth Herndon, Beth A. Middleton, Scott Painter, Kevin Roche, Julianne Scamardo, Ross Vander Vorste, Kristin Boye, Ellen Wohl, Margaret Zimmer, Kelly Hondula, Maggi Laan, Anna Marshall, Kaizad F. Patel

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

The structure, function, and dynamics of Earth's terrestrial ecosystems are profoundly influenced by how often (frequency) and how long (duration) they are inundated with water. A diverse array of natural and human-engineered systems experience temporally variable inundation whereby they fluctuate between inundated and non-inundated states. Variable inundation spans extreme events to predictable sub-daily cycles. Variably inundated ecosystems (VIEs) include hillslopes, non-perennial streams, wetlands, floodplains, temporary ponds, tidal systems, storm-impacted coastal zones, and human-engineered systems. VIEs are diverse in terms of inundation regimes, water chemistry and flow velocity, soil and sediment properties, vegetation, and many other properties. The spatial and temporal …


Re: January 2025 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister Feb 2025

Re: January 2025 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2022 Insufficiently Reclaimed Sites Sampling Bres No. 30 – Atlantic 1 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Feb 2025

Draft Final 2022 Insufficiently Reclaimed Sites Sampling Bres No. 30 – Atlantic 1 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Bpsou Draft Final Phase I Design Investigation Evaluation Report And Response To Comments, Blacktail Creek Riparian Actions (Dated January 24, 2025), Emma Rott Feb 2025

Re: Comment Letter For Bpsou Draft Final Phase I Design Investigation Evaluation Report And Response To Comments, Blacktail Creek Riparian Actions (Dated January 24, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek Butte Area Npl Site Fall Semi-Annual 2024 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson Feb 2025

Silver Bow Creek Butte Area Npl Site Fall Semi-Annual 2024 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Butte Priority Soils Operable Unit Subdrain Pump Station 30% Remedial Design Package Submittal (Dated January 31, 2025), Emma Rott Feb 2025

Re: Comment Letter For Butte Priority Soils Operable Unit Subdrain Pump Station 30% Remedial Design Package Submittal (Dated January 31, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Silver Bow Creek Butte Area Npl Site Fall Semi-Annual 2024 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson Feb 2025

Re: Silver Bow Creek Butte Area Npl Site Fall Semi-Annual 2024 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Draft Final Silver Bow Creek Conservation Area Repository Data Gap Data Summary Report (Dated January 3, 2025), Emma Rott Feb 2025

Re: Comment Letter For The Draft Final Silver Bow Creek Conservation Area Repository Data Gap Data Summary Report (Dated January 3, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Marine Heatwave Conditions In Western Australia Marine Waters - 20 February 2025, Department Of Primary Industries And Regional Development, Western Australia Feb 2025

Marine Heatwave Conditions In Western Australia Marine Waters - 20 February 2025, Department Of Primary Industries And Regional Development, Western Australia

Marine Heatwave Notification Reports

Marine heatwave (MHW) conditions across all Bioregions of Western Australia have eased over the last two weeks. MHW status no longer applies to the majority of the North Coast and West Coast Bioregions. MHW conditions in the Gascoyne and South Coast Bioregion have eased to Category 1 - Moderate.


Re: Comment Letter For Draft Blacktail Creek Groundwater Hydraulic Control System Preliminary 30% Remedial Design Report (Dated October 28, 2024), Emma Rott Feb 2025

Re: Comment Letter For Draft Blacktail Creek Groundwater Hydraulic Control System Preliminary 30% Remedial Design Report (Dated October 28, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Western Australia’S Marine Heatwave Update - 16 February 2025, Department Of Primary Industries And Regional Development, Western Australia Feb 2025

Western Australia’S Marine Heatwave Update - 16 February 2025, Department Of Primary Industries And Regional Development, Western Australia

Marine Heatwave Notification Reports

No abstract provided.


Draft Final 2021-2022 Residential Metals Abatement Program (Rmap) Butte School District No. 1 (West Elementary School And Butte High School) Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc. Feb 2025

Draft Final 2021-2022 Residential Metals Abatement Program (Rmap) Butte School District No. 1 (West Elementary School And Butte High School) Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2025 Draft Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Feb 2025

2025 Draft Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Towards More Sustainable Oceans: A Review Of The Pressing Challenges Posed By Marine Plastic Litter, Peter Yang Feb 2025

Towards More Sustainable Oceans: A Review Of The Pressing Challenges Posed By Marine Plastic Litter, Peter Yang

Faculty Scholarship

Marine littering is a global challenge and a significant threat to a sustainable planet, requiring comprehensive and effective mechanisms to address it in a comprehensive manner. This study reports on a bibliometric analysis that has identified the extent to which the topic has been explored in the international literature, by focusing on geographical scope, the emphasis on (micro)plastic litter and on policy measures. Additionally, as a complement to the assessment of the recent literature on marine plastic litter, this study reviews some case studies, identifying some trends on how to cope with this problem. The findings underscore the imperative for …