Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring Commons

Open Access. Powered by Scholars. Published by Universities.®

2024

Discipline
Institution
Keyword
Publication
Publication Type
File Type

Articles 121 - 150 of 577

Full-Text Articles in Environmental Monitoring

Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 158 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Nov 2024

Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 158 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Materials Management Plan Silver Bow Creek Conservation Area, Pioneer Technical Services, Inc. Nov 2024

Draft Final Materials Management Plan Silver Bow Creek Conservation Area, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2022 Unreclaimed Sites Sampling Ur-13 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Nov 2024

Draft Final 2022 Unreclaimed Sites Sampling Ur-13 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2024 Residential Metals Abatement Program (Rmap) Brown’S Gulch Borrow Submittal #1, Pioneer Technical Services, Inc. Nov 2024

Final 2024 Residential Metals Abatement Program (Rmap) Brown’S Gulch Borrow Submittal #1, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final West Side Soils Operable Unit Remedial Investigation Sampling Data Summary Report, Pioneer Technical Services, Inc. Nov 2024

Final West Side Soils Operable Unit Remedial Investigation Sampling Data Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


September 2024 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister Nov 2024

September 2024 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System, Josh Bryson Oct 2024

Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System, Josh Bryson Oct 2024

Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For Butte Reduction Works (Brw) Phase Ii Interim Demolition Plan Construction Drawings And Floodplain Encroachment Analysis (Dated September 3, 2024), Emma Rott Oct 2024

Comment Letter For Butte Reduction Works (Brw) Phase Ii Interim Demolition Plan Construction Drawings And Floodplain Encroachment Analysis (Dated September 3, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Carbon Restoration Potential On Global Land Under Water Resource Constraints, Shouzhang Peng, César Terrer, Benjamin Smith, Philippe Ciais, Qinggong Han, Jialan Nan, Joshua B. Fisher, Liang Chen, Lei Deng, Kailiang Yu Oct 2024

Carbon Restoration Potential On Global Land Under Water Resource Constraints, Shouzhang Peng, César Terrer, Benjamin Smith, Philippe Ciais, Qinggong Han, Jialan Nan, Joshua B. Fisher, Liang Chen, Lei Deng, Kailiang Yu

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

Ecosystem restoration is a critical nature-based solution to mitigate climate change. However, the carbon sequestration potential of restoration, defined as the maximum achievable carbon storage, has likely been overestimated because previous studies have not adequately accounted for the competition between ecosystem water demands for maximizing carbon sequestration and human water needs. Here we used a comprehensive process-based model combined with extensive land-use data and evaporation recycling accounting for land–atmosphere feedback to estimate the water requirements associated with ecosystem restoration. We found that achieving the carbon sequestration potential of restoration would significantly reduce global water availability per capita by 26%, posing …


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) (Dated September 27, 2024), Molly Roby Oct 2024

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) (Dated September 27, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – September 2024 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis Oct 2024

Re: Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – September 2024 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Of: Operations And Maintenance Manual, Horseshoe Bend Water Treatment Plant, Dated July 26, 2024., Jason Rappe Oct 2024

Re: Approval Of: Operations And Maintenance Manual, Horseshoe Bend Water Treatment Plant, Dated July 26, 2024., Jason Rappe

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comments On: Draft Final Horseshoe Bend Effluent Line (Hbel) Discharge Structure Surface Enhancements Work Plan, Dated August 26, 2024., Jason Rappe Oct 2024

Re: Comments On: Draft Final Horseshoe Bend Effluent Line (Hbel) Discharge Structure Surface Enhancements Work Plan, Dated August 26, 2024., Jason Rappe

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For Draft Final Bpsou Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2024 (Dated June 26, 2024), Emma Rott Oct 2024

Comment Letter For Draft Final Bpsou Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2024 (Dated June 26, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2022 (Dated July 3, 2024), Emma Rott Oct 2024

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2022 (Dated July 3, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Request For Change (Rfc-Rmap-2024-002) For The Soil Remedial Action At Mandan Park (Dated September 19, 2024), Molly Roby Oct 2024

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Request For Change (Rfc-Rmap-2024-002) For The Soil Remedial Action At Mandan Park (Dated September 19, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Residential Metals Abatement Program (Rmap) Revised Yard Submittals Round 2 (Dated August 30, 2024), Molly Roby Oct 2024

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Residential Metals Abatement Program (Rmap) Revised Yard Submittals Round 2 (Dated August 30, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Scaling Individual Tree Transpiration With Thermal Cameras Reveals Interspecies Differences To Drought Vulnerability, Mostafa Javadian, Donald M. Aubrecht, Joshua B. Fisher, Russell L. Scott, Sean P. Burns, Jen L. Diehl, J. William Munger, Andrew D. Richardson Oct 2024

Scaling Individual Tree Transpiration With Thermal Cameras Reveals Interspecies Differences To Drought Vulnerability, Mostafa Javadian, Donald M. Aubrecht, Joshua B. Fisher, Russell L. Scott, Sean P. Burns, Jen L. Diehl, J. William Munger, Andrew D. Richardson

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

Understanding tree transpiration variability is vital for assessing ecosystem water-use efficiency and forest health amid climate change, yet most landscape-level measurements do not differentiate individual trees. Using canopy temperature data from thermal cameras, we estimated the transpiration rates of individual trees at Harvard Forest and Niwot Ridge. PT-JPL model was used to derive latent heat flux from thermal images at the canopy-level, showing strong agreement with tower measurements (R2 = 0.70–0.96 at Niwot, 0.59–0.78 at Harvard at half-hourly to monthly scales) and daily RMSE of 33.5 W/m2 (Niwot) and 52.8 W/m2 (Harvard). Tree-level analysis revealed species-specific responses to …


2024 Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study, Pioneer Technical Services, Inc. Oct 2024

2024 Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Of: Berkeley Pit And Discharge Pilot Project Temperature Evaluation, 2023 Update, Dated June 28, 2024., Jason Rappe Oct 2024

Re: Approval Of: Berkeley Pit And Discharge Pilot Project Temperature Evaluation, 2023 Update, Dated June 28, 2024., Jason Rappe

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Of: Berkeley Pit And Discharge Pilot Project, Discharge System Operations And Maintenance Manual, 2024 Update , Dated April 23, 2024, Jason Rappe Oct 2024

Approval Of: Berkeley Pit And Discharge Pilot Project, Discharge System Operations And Maintenance Manual, 2024 Update , Dated April 23, 2024, Jason Rappe

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Oregon State Rank Assessment For Sheldon Tui Chub (Siphateles Bicolor Eurysoma), Eleanor P. Gaines Oct 2024

Oregon State Rank Assessment For Sheldon Tui Chub (Siphateles Bicolor Eurysoma), Eleanor P. Gaines

Institute for Natural Resources Publications

Oregon state conservation status assessment for Sheldon tui chub (Siphateles bicolor eurysoma) using NatureServe methodology, 2024.


Approval Of: Discharge System 2023 Annual Operations And Maintenance Report, Berkeley Pit And Discharge Pilot Project, Dated May 20, 2024, Jason Rappe Oct 2024

Approval Of: Discharge System 2023 Annual Operations And Maintenance Report, Berkeley Pit And Discharge Pilot Project, Dated May 20, 2024, Jason Rappe

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Of: Draft Final 2023 Annual Report, Operations & Maintenance Monitoring Report For The Rocker Timber Framing And Treating Plant Operable Unit; Dated April 10, 2024., Jason Rappe Oct 2024

Approval Of: Draft Final 2023 Annual Report, Operations & Maintenance Monitoring Report For The Rocker Timber Framing And Treating Plant Operable Unit; Dated April 10, 2024., Jason Rappe

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Challenges And Future Directions In Quantifying Terrestrial Evapotranspiration, Koong Yi, Gabriel B. Senay, Joshua B. Fisher, Lixin Wang, Kosana Suvočarev, Housen Chu, Georgianne W. Moore, Kimberly A. Novick, Mallory L. Barnes, Trevor F. Keenan, Kanishka Mallick, Xiangzhong Luo, Justine E. C. Missik, Kyle B. Delwiche, Jacob A. Nelson, Stephen P. Good, Xiangming Xiao, Steven A. Kannenberg, Arman Ahmadi, Tianxin Wang, Gil Bohrer, Marcy E. Litvak, David E. Reed, A. Christopher Oishi, Margaret S. Torn, Dennis Baldocchi Oct 2024

Challenges And Future Directions In Quantifying Terrestrial Evapotranspiration, Koong Yi, Gabriel B. Senay, Joshua B. Fisher, Lixin Wang, Kosana Suvočarev, Housen Chu, Georgianne W. Moore, Kimberly A. Novick, Mallory L. Barnes, Trevor F. Keenan, Kanishka Mallick, Xiangzhong Luo, Justine E. C. Missik, Kyle B. Delwiche, Jacob A. Nelson, Stephen P. Good, Xiangming Xiao, Steven A. Kannenberg, Arman Ahmadi, Tianxin Wang, Gil Bohrer, Marcy E. Litvak, David E. Reed, A. Christopher Oishi, Margaret S. Torn, Dennis Baldocchi

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

Terrestrial evapotranspiration is the second-largest component of the land water cycle, linking the water, energy, and carbon cycles and influencing the productivity and health of ecosystems. The dynamics of ET across a spectrum of spatiotemporal scales and their controls remain an active focus of research across different science disciplines. Here, we provide an overview of the current state of ET science across in situ measurements, partitioning of ET, and remote sensing, and discuss how different approaches complement one another based on their advantages and shortcomings. We aim to facilitate collaboration among a cross-disciplinary group of ET scientists to overcome the …


Final 2024 Residential Metals Abatement Program (Rmap) Walkerville Park (Alley Of North Main And Alley Of West Daly) Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Oct 2024

Final 2024 Residential Metals Abatement Program (Rmap) Walkerville Park (Alley Of North Main And Alley Of West Daly) Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 181 – Mountain Con-3 Dump And Responses To Agency Comments, Mike Mcanulty Oct 2024

Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 181 – Mountain Con-3 Dump And Responses To Agency Comments, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Oregon State Rank Assessment For Goose Lake Tui Chub (Siphateles Bicolor Thalassinus), Jesse Laney Oct 2024

Oregon State Rank Assessment For Goose Lake Tui Chub (Siphateles Bicolor Thalassinus), Jesse Laney

Institute for Natural Resources Publications

Oregon state conservation status assessment for Goose Lake tui chub (Siphateles bicolor thalassinus) using NatureServe methodology, 2024.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Residential Metals Abatement Program (Rmap) Revised 2024 Walkerville Park (Alley Of North Main & Alley Of West Daly) Soil Remedial Action Work Plan (Rawp) (Dated September 18, 2024), Molly Roby Oct 2024

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Residential Metals Abatement Program (Rmap) Revised 2024 Walkerville Park (Alley Of North Main & Alley Of West Daly) Soil Remedial Action Work Plan (Rawp) (Dated September 18, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.