Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring Commons

Open Access. Powered by Scholars. Published by Universities.®

2022

Discipline
Institution
Keyword
Publication
Publication Type
File Type

Articles 91 - 120 of 753

Full-Text Articles in Environmental Monitoring

Final Bpsou Subdrain Pump Station Remedial Design (Rd) Work Plan, Pioneer Technical Services, Inc. Oct 2022

Final Bpsou Subdrain Pump Station Remedial Design (Rd) Work Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Urban Flooding Accelerates The Affordable Housing Shortage: A Case Study In Columbia, South Carolina, Mary Hannah Lindsay Oct 2022

Urban Flooding Accelerates The Affordable Housing Shortage: A Case Study In Columbia, South Carolina, Mary Hannah Lindsay

Theses and Dissertations

The state of South Carolina stands at the corner where climate change and the housing crisis meet. The affordable housing stock across South Carolina continues to deplete as its major cities experience urban flooding events due to outdated and weakened infrastructure, compounded by an intensification of storm systems brought on by a changing climate. Lower income communities are forced to accept lesser living conditions and less resilient housing options because these options are more affordable. Renters are often met with more challenges when navigating disaster recovery compared to homeowners. Using a case study established in Columbia, South Carolina of the …


Comment Letter For: Quality Assurance Project Plan: Long-Term Operation And Maintenance Of Railroad Assets, For Bnsf Railway Company And Union Pacific Railroad, Butte Priority Soils Operable Unit (Dated May 2022), Nikia Greene Sep 2022

Comment Letter For: Quality Assurance Project Plan: Long-Term Operation And Maintenance Of Railroad Assets, For Bnsf Railway Company And Union Pacific Railroad, Butte Priority Soils Operable Unit (Dated May 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Sep 2022

2022 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Revised Butte Reduction Works (Brw) Phase I Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Sep 2022

Final Revised Butte Reduction Works (Brw) Phase I Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For Draft Blacktail Creek (Btc) Groundwater Hydraulic Control System Remedial Design Work Plan (Rdwp) (Dated July 22, 2022), Nikia Greene Sep 2022

Comment Letter For Draft Blacktail Creek (Btc) Groundwater Hydraulic Control System Remedial Design Work Plan (Rdwp) (Dated July 22, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 34 – Eveline, Mike Mcanulty Sep 2022

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 34 – Eveline, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 34 – Eveline And Response To Agency Comments, Mike Mcanulty Sep 2022

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 34 – Eveline And Response To Agency Comments, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 8 – Belle Of Butte (Dated August 2, 2022), Nikia Greene Sep 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 8 – Belle Of Butte (Dated August 2, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 38 – Sister Dump (Dated June 16, 2022), Nikia Greene Sep 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 38 – Sister Dump (Dated June 16, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For: Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoons System – Second Quarter 2021 (Dated July 20, 2022), Nikia Greene Sep 2022

Approval Letter For: Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoons System – Second Quarter 2021 (Dated July 20, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Concurrence And Comments On: Sd Response To The Agencies Proposed Raar Path Forward Letter, Dated March 28, 2022 And Pilot Project Annual Update Letter, Dated July 1, 2022, Nikia Greene Sep 2022

Concurrence And Comments On: Sd Response To The Agencies Proposed Raar Path Forward Letter, Dated March 28, 2022 And Pilot Project Annual Update Letter, Dated July 1, 2022, Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For: Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoons System – Third Quarter 2021 (Dated July 20, 2022), Nikia Greene Sep 2022

Approval Letter For: Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoons System – Third Quarter 2021 (Dated July 20, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Request For Change (Rfc) To The Butte Priority Soils Operable Unit (Bpsou) Request For Change (Rfc) No. 1 To The Final 2022 Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp) (Dated August 31, 2022), Nikia Greene Sep 2022

Approval Letter For The Request For Change (Rfc) To The Butte Priority Soils Operable Unit (Bpsou) Request For Change (Rfc) No. 1 To The Final 2022 Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp) (Dated August 31, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Btl O&M Events Log, Pioneer Technical Services, Inc. Sep 2022

2022 Btl O&M Events Log, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 3q Btl Chemical Dump, Pioneer Technical Services, Inc. Sep 2022

2022 3q Btl Chemical Dump, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Wastewater-Informed Public Health Intervention Playbook Sep 2022

Wastewater-Informed Public Health Intervention Playbook

Sustain Magazine

As the SARS-CoV-2 pandemic quickly spread from country to country and continent to continent in 2020, governments and scientists needed a way to track COVID-19 through populations in order to position public health interventions in the most impactful locations. Having a decision-based risk framework may help to guide policy creation that could minimize or prevent possible outbreaks and surges of infection within communities. The University of Louisville in partnership with Louisville’s Department of Public Health and Wellness tested this strategy in 2021 and 2022. This Wastewater-Informed Public Health Intervention Playbook describes the decisions and actions of that academic and public …


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Residential Metals Abatement Program (Rmap) Field Sampling Plan (Fsp) – Indoor Dust – Group 1, Revision 1 (Dated September 8, 2022), Nikia Greene Sep 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Residential Metals Abatement Program (Rmap) Field Sampling Plan (Fsp) – Indoor Dust – Group 1, Revision 1 (Dated September 8, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Revision No. 1, Residential Metals Abatement Program (Rmap), Quality Assurance Project Plan (Qapp), Non-Residential Parcels – Indoor Dust (Dated September 9, 2022), Nikia Greene Sep 2022

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Revision No. 1, Residential Metals Abatement Program (Rmap), Quality Assurance Project Plan (Qapp), Non-Residential Parcels – Indoor Dust (Dated September 9, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Annual Quality Assurance Project Plan For Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site; Phase I Brw Quality Assurance Project Plan (Dated July 20, 2022), Nikia Greene Sep 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Annual Quality Assurance Project Plan For Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site; Phase I Brw Quality Assurance Project Plan (Dated July 20, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Residential Metals Abatement Program (Rmap) Field Sampling Plan (Fsp) – Indoor Dust – Group 5, Revision 1 (Dated September 8, 2022), Nikia Greene Sep 2022

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Residential Metals Abatement Program (Rmap) Field Sampling Plan (Fsp) – Indoor Dust – Group 5, Revision 1 (Dated September 8, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Residential Metals Abatement Program (Rmap) Field Sampling Plan (Fsp) – Indoor Dust – Group 4, Revision 1 (Dated September 8, 2022), Nikia Greene Sep 2022

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Residential Metals Abatement Program (Rmap) Field Sampling Plan (Fsp) – Indoor Dust – Group 4, Revision 1 (Dated September 8, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments On The Butte Priority Soils Operable Unit (Bpsou) Annual Quality Assurance Project Plan For Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site; Phase Iii Brw Quality Assurance Project Plan (Dated June 29, 2022), Nikia Greene Sep 2022

Comments On The Butte Priority Soils Operable Unit (Bpsou) Annual Quality Assurance Project Plan For Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site; Phase Iii Brw Quality Assurance Project Plan (Dated June 29, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments For The Draft Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling Ur-39 Site Evaluation Summary Report (June 15, 2022), Nikia Greene Sep 2022

Comments For The Draft Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling Ur-39 Site Evaluation Summary Report (June 15, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Residential Metals Abatement Program (Rmap) Field Sampling Plan (Fsp) – Indoor Dust – Group 6, Revision 1 (Dated September 8, 2022), Nikia Greene Sep 2022

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Residential Metals Abatement Program (Rmap) Field Sampling Plan (Fsp) – Indoor Dust – Group 6, Revision 1 (Dated September 8, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Residential Metals Abatement Program (Rmap) Field Sampling Plan (Fsp) – Indoor Dust – Group 3, Revision 1 (Dated September 8, 2022), Nikia Greene Sep 2022

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Residential Metals Abatement Program (Rmap) Field Sampling Plan (Fsp) – Indoor Dust – Group 3, Revision 1 (Dated September 8, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Street And Snow Management Plan, Mike Mcanulty Sep 2022

Butte Priority Soils Operable Unit (Bpsou) Final Street And Snow Management Plan, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 158 - Waste Rock Dump, Mike Mcanulty Sep 2022

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 158 - Waste Rock Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments For The Draft Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling Ur-35 Site Evaluation Summary Report (June 15, 2022), Nikia Greene Sep 2022

Comments For The Draft Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling Ur-35 Site Evaluation Summary Report (June 15, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments For The Draft Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling Ur-38 Site Evaluation Summary Report (June 8, 2022), Nikia Greene Sep 2022

Comments For The Draft Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling Ur-38 Site Evaluation Summary Report (June 8, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.