Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring Commons

Open Access. Powered by Scholars. Published by Universities.®

2022

Discipline
Institution
Keyword
Publication
Publication Type
File Type

Articles 241 - 270 of 753

Full-Text Articles in Environmental Monitoring

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 32 – Corra-2 Dumps (Dated June 20, 2022), Nikia Greene Jun 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 32 – Corra-2 Dumps (Dated June 20, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 93 – Soudan Dump (Dated June 23, 2022), Nikia Greene Jun 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 93 – Soudan Dump (Dated June 23, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) Draft Surface Water Surface Water Compliance And Interpretation Technical Memorandum (Dated May 12, 2022), Nikia Greene Jun 2022

Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) Draft Surface Water Surface Water Compliance And Interpretation Technical Memorandum (Dated May 12, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2021 Draft Site- Wide Surface Water Monitoring Data Summary Report (Dated April 4, 2022), Nikia Greene Jun 2022

Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2021 Draft Site- Wide Surface Water Monitoring Data Summary Report (Dated April 4, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp, Pioneer Technical Services, Inc. Jun 2022

Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Revised Butte Reduction Works (Brw) Phase Iii Qapp, Nikia Greene, Pioneer Technical Services, Inc. Jun 2022

Final Revised Butte Reduction Works (Brw) Phase Iii Qapp, Nikia Greene, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval On The Draft Butte Priority Soils Operable Unit (Bpsou) Blacktail Creek Piezometer Installation And Monitoring Well Repair Plan (Dated June 10, 2022), Nikia Greene Jun 2022

Approval On The Draft Butte Priority Soils Operable Unit (Bpsou) Blacktail Creek Piezometer Installation And Monitoring Well Repair Plan (Dated June 10, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2022 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #6 [Covering Stodden Park, Baptist Student Union, Minor Park, Blacktail Lane, Earth Lane, Fleecer Drive, Boulevard (Josette), Boulevard (Lasalle), And Sesame- Sage], Pioneer Technical Services, Inc. Jun 2022

Final 2022 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #6 [Covering Stodden Park, Baptist Student Union, Minor Park, Blacktail Lane, Earth Lane, Fleecer Drive, Boulevard (Josette), Boulevard (Lasalle), And Sesame- Sage], Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2022, Pioneer Technical Services, Inc. Jun 2022

Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2022, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


The Ddt-Induced Decline Influenced Genetic Diversity In Naturally Recovered Peregrine Falcons (Falco Peregrinus) Nesting Within The Alaska Arctic And Eastern Interior, Sarah A. Sonsthagen,, Ted Swem, Skip Ambrose, Melanie J. Flamme, Clayton M. White, George K. Sage, Sandra L. Talbot Jun 2022

The Ddt-Induced Decline Influenced Genetic Diversity In Naturally Recovered Peregrine Falcons (Falco Peregrinus) Nesting Within The Alaska Arctic And Eastern Interior, Sarah A. Sonsthagen,, Ted Swem, Skip Ambrose, Melanie J. Flamme, Clayton M. White, George K. Sage, Sandra L. Talbot

Nebraska Cooperative Fish and Wildlife Research Unit: Staff Publications

We assessed the influence of the severe mid-20th century population decline on genetic diversity in nonaugmented Peregrine Falcon Falco peregrinus populations nesting within the Alaska Arctic and eastern Interior. Microsatellite and mitochondrial DNA (mtDNA) data were analysed for Peregrine Falcons sampled from three periods: pre-decline, decline and post-decline. The influence of the decline on genetic diversity differed between the two locales. The Alaska Arctic was characterized by shifts in mtDNA haplotype frequencies, increased inbreeding coefficient, reduction in effective population size and increase in private haplotypes, and a signature of post-decline population growth was detected; by contrast, the eastern Interior showed …


2022 - Final Revised - Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Ii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Jun 2022

2022 - Final Revised - Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Ii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Reclaimed Areas Maintenance And Monitoring Plan (Dated June 15, 2022), Nikia Greene Jun 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Reclaimed Areas Maintenance And Monitoring Plan (Dated June 15, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 93 – Soudan Dump., Mike Mcanulty Jun 2022

Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 93 – Soudan Dump., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments On The Butte Priority Soils Operable Unit (Bpsou) Revised Retention And Detention Discharge Management Report (Dated April 1, 2022), Nikia Greene Jun 2022

Comments On The Butte Priority Soils Operable Unit (Bpsou) Revised Retention And Detention Discharge Management Report (Dated April 1, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 96 – Washoe Dump, Mike Mcanulty Jun 2022

Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 96 – Washoe Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Multi-Sectoral Impact Assessment Of An Extreme African Dust Episode In The Eastern Mediterranean In March 2018, Alexandra Monteiro, Sara Basart, Stelios Kazadzis, Antonis Gkikas, Sophie Vandenbussche, Aurelio Tobias, Carla Gama, Carlos Pérez García-Pando, Enric Tarradellas, George Notas, Nick Middleton, Jonilda Kushta, Vassilis Amiridis, Kostas Lagouvardos, Panagiotis G. Kosmopoulos, Vasiliki Kotroni, Maria Kanakidou, Nikos Mihalopoulos, Nikos Kalivitis, Pavla Daggson-Waldhauserová, Hesham El-Askary, Klaus Sievers, T. Giannaros, Lucia Mona, Marcus Hirtl, Paul Skomorowski, Slobodan Nickovic, Athanasios Votsis, Timo H. Virtanen, Theodoros Christoudias, Biagio Di Mauro, Serena Trippetta, Stanislav Kutuzov, Outi Meinander Jun 2022

Multi-Sectoral Impact Assessment Of An Extreme African Dust Episode In The Eastern Mediterranean In March 2018, Alexandra Monteiro, Sara Basart, Stelios Kazadzis, Antonis Gkikas, Sophie Vandenbussche, Aurelio Tobias, Carla Gama, Carlos Pérez García-Pando, Enric Tarradellas, George Notas, Nick Middleton, Jonilda Kushta, Vassilis Amiridis, Kostas Lagouvardos, Panagiotis G. Kosmopoulos, Vasiliki Kotroni, Maria Kanakidou, Nikos Mihalopoulos, Nikos Kalivitis, Pavla Daggson-Waldhauserová, Hesham El-Askary, Klaus Sievers, T. Giannaros, Lucia Mona, Marcus Hirtl, Paul Skomorowski, Slobodan Nickovic, Athanasios Votsis, Timo H. Virtanen, Theodoros Christoudias, Biagio Di Mauro, Serena Trippetta, Stanislav Kutuzov, Outi Meinander

Mathematics, Physics, and Computer Science Faculty Articles and Research

In late March 2018, a large part of the Eastern Mediterranean experienced an extraordinary episode of African dust, one of the most intense in recent years, here referred to as the “Minoan Red” event. The episode mainly affected the Greek island of Crete, where the highest aerosol concentrations over the past 15 yeas were recorded, although impacts were also felt well beyond this core area. Our study fills a gap in dust research by assessing the multi-sectoral impacts of sand and dust storms and their socioeconomic implications. Specifically, we provide a multi-sectoral impact assessment of Crete during the occurrence of …


Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp) Bres No. 50 – Zelia, Mike Mcanulty Jun 2022

Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp) Bres No. 50 – Zelia, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #5 [Covering Longfellow Ball Fields, Peace Park, Rocker Park, Racetrack Park, C Street, Jfk Park, And Rickey Park] (Dated June 14, 2022)., Nikia Greene Jun 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #5 [Covering Longfellow Ball Fields, Peace Park, Rocker Park, Racetrack Park, C Street, Jfk Park, And Rickey Park] (Dated June 14, 2022)., Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Final Residential Metals Abatement Program (Rmap), Quality Assurance Project Plan (Qapp), Non-Residential Parcels (Dated June 13, 2022), Nikia Greene Jun 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Final Residential Metals Abatement Program (Rmap), Quality Assurance Project Plan (Qapp), Non-Residential Parcels (Dated June 13, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #3 [Covering Koprivica Park, Mcgruff Park, Skate Park, Belmont Park, Rock Park, And Hanna Park] (Dated June 14, 2022)., Nikia Greene Jun 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #3 [Covering Koprivica Park, Mcgruff Park, Skate Park, Belmont Park, Rock Park, And Hanna Park] (Dated June 14, 2022)., Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2022 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #4 [Covering Tot Lot, Clark Park, Huron Tennis Courts, Father Sheehan Park, Community Garden, And Lexington Gardens], Pioneer Technical Services, Inc. Jun 2022

Final 2022 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #4 [Covering Tot Lot, Clark Park, Huron Tennis Courts, Father Sheehan Park, Community Garden, And Lexington Gardens], Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2022 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #5 [Covering Longfellow Ball Fields, Peace Park, Rocker Park, Racetrack Park, C Street, Jfk Park, And Rickey Park], Pioneer Technical Services, Inc. Jun 2022

Final 2022 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #5 [Covering Longfellow Ball Fields, Peace Park, Rocker Park, Racetrack Park, C Street, Jfk Park, And Rickey Park], Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #6 [Covering Stodden Park, Baptist Student Union (Former Mckinley School), Minor Park, Blacktail Lane, Earth Lane, Fleecer Drive, Boulevard (Josette), Boulevard (Lasalle), And Sesame-Sage (Golden Estates #3) (Dated June 14, 2022), Nikia Greene Jun 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #6 [Covering Stodden Park, Baptist Student Union (Former Mckinley School), Minor Park, Blacktail Lane, Earth Lane, Fleecer Drive, Boulevard (Josette), Boulevard (Lasalle), And Sesame-Sage (Golden Estates #3) (Dated June 14, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #1 [Covering Walkerville Ball Park, Antimony Ball Field, Walkerville Park (Walkerville Drive & Ryan Road), Walkerville Park (5th & Transit), And Walkerville Park (Alley Of North Main & Alley Of West Daly)] (Dated June 14, 2022), Nikia Greene Jun 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #1 [Covering Walkerville Ball Park, Antimony Ball Field, Walkerville Park (Walkerville Drive & Ryan Road), Walkerville Park (5th & Transit), And Walkerville Park (Alley Of North Main & Alley Of West Daly)] (Dated June 14, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2022 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #2 [Covering Scown Field, Cherokee Park, Copper/Emmet, West Side Subdivision Park, Chester Steele Park, And Cinders Field], Pioneer Technical Services, Inc. Jun 2022

Final 2022 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #2 [Covering Scown Field, Cherokee Park, Copper/Emmet, West Side Subdivision Park, Chester Steele Park, And Cinders Field], Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2022 Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Non-Residential Parcels), Mike Mcanulty Jun 2022

Final 2022 Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Non-Residential Parcels), Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2022 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #1 [Covering Walkerville Ball Park, Antimony Ball Field, Walkerville Park (Walkerville Drive & Ryan Road), Walkerville Park (5th & Transit), & Walkerville Park (Alley Of North Main & Alley Of West Daly)], Pioneer Technical Services, Inc. Jun 2022

Final 2022 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #1 [Covering Walkerville Ball Park, Antimony Ball Field, Walkerville Park (Walkerville Drive & Ryan Road), Walkerville Park (5th & Transit), & Walkerville Park (Alley Of North Main & Alley Of West Daly)], Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2022 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #3 [Covering Koprivica Park, Mcgruff Park, Skate Park, Belmont Park, Rock Park, And Hanna Park], Pioneer Technical Services, Inc. Jun 2022

Final 2022 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #3 [Covering Koprivica Park, Mcgruff Park, Skate Park, Belmont Park, Rock Park, And Hanna Park], Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #4 [Covering Tot Lot, Clark Park, Huron Tennis Courts, Father Sheehan Park, Community Garden, And Lexington Gardens] (Dated June 14, 2022), Nikia Greene Jun 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #4 [Covering Tot Lot, Clark Park, Huron Tennis Courts, Father Sheehan Park, Community Garden, And Lexington Gardens] (Dated June 14, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #2 [Covering Scown Field, Cherokee Park, Copper/Emmet, West Side Subdivision Park, Chester Steele Park, And Cinders Field] (Dated June 14, 2022), Nikia Greene Jun 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #2 [Covering Scown Field, Cherokee Park, Copper/Emmet, West Side Subdivision Park, Chester Steele Park, And Cinders Field] (Dated June 14, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.