Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring Commons™

Open Access. Powered by Scholars. Published by Universities.®

Environmental Indicators and Impact Assessment

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 961 - 990 of 4599

Full-Text Articles in Environmental Monitoring

Seasonal Dynamics In Land Surface Temperature In Response To Land Use Land Cover Changes Using Google Earth Engine, Lei Feng, Sajjad Hussain, Narcisa G. Pricope, Sana Arshad, Aqil Tariq, Li Feng, Muhammad Mubeen, Rana Waqar Aslam, Mohammed S. Fnais, Wenzhao Li, Hesham El-Askary Sep 2024

Seasonal Dynamics In Land Surface Temperature In Response To Land Use Land Cover Changes Using Google Earth Engine, Lei Feng, Sajjad Hussain, Narcisa G. Pricope, Sana Arshad, Aqil Tariq, Li Feng, Muhammad Mubeen, Rana Waqar Aslam, Mohammed S. Fnais, Wenzhao Li, Hesham El-Askary

Mathematics, Physics, and Computer Science Faculty Articles and Research

Changes in land use and land cover (LULC) are critical for evaluating global spatiotemporal trends, especially regarding climate change and urbanization. This study investigates the dynamics of Landsat surface temperature (LST) in response to LULC changes and their effects on the seasonal microclimate in Kasur District, Pakistan. Using the Google Earth Engine platform, we employed a random forest algorithm to detect LULC changes (cropland, forest, built-up, fallow, barren, and water) and analyze seasonal spectral indices from Landsat imagery for 1988, 2002, and 2022. Significant LULC changes were observed, including a 9.8% increase in built-up areas, a 4.2% decrease in cropland, …


2024 Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Sep 2024

2024 Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Effects Of Microplastic Biofilms On An Anthropogenically Impacted Suburban Lake, Paris M. Velasquez Sep 2024

Effects Of Microplastic Biofilms On An Anthropogenically Impacted Suburban Lake, Paris M. Velasquez

Masters Theses

Plastics have been observed in every location on the planet, and their prevalence in the environment is due in part to their strong resistance to degradation. Inland lakes are susceptible to plastic pollution by highway runoff, which contains plastic fragments of brake pads, car tires, litter, and road paint. These plastics eventually enter freshwater environments and degrade into microplastics (


Re: Comment Letter For Draft Bpsou 2023 Groundwater Data Summary Report (Dated May 31, 2024), Emma Rott Sep 2024

Re: Comment Letter For Draft Bpsou 2023 Groundwater Data Summary Report (Dated May 31, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


A Generalized Machine Learning Model For Long-Term Coral Reef Monitoring In The Red Sea, Justin J. Gapper, Surendra Maharjan, Wenzhao Li, Erik Linstead, Surya Prakash Tiwari, Mohamed A. Qurban, Hesham El-Askary Sep 2024

A Generalized Machine Learning Model For Long-Term Coral Reef Monitoring In The Red Sea, Justin J. Gapper, Surendra Maharjan, Wenzhao Li, Erik Linstead, Surya Prakash Tiwari, Mohamed A. Qurban, Hesham El-Askary

Mathematics, Physics, and Computer Science Faculty Articles and Research

Coral reefs, despite covering less than 0.2 % of the ocean floor, harbor approximately 35 % of all known marine species, making their conservation critical. However, coral bleaching, exacerbated by climate change and phenomena such as El Niño, poses a significant threat to these ecosystems. This study focuses on the Red Sea, proposing a generalized machine learning approach to detect and monitor changes in coral reef cover over an 18-year period (2000–2018). Using Landsat 7 and 8 data, a Support Vector Machine (SVM) classifier was trained on depth-invariant indices (DII) derived from the Gulf of Aqaba and validated against ground …


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 78 – Original Mine Yard, Mike Mcanulty Sep 2024

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 78 – Original Mine Yard, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 34e – Eveline Dump East, Mike Mcanulty Sep 2024

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 34e – Eveline Dump East, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 52 – Moscow Dump, Mike Mcanulty Sep 2024

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 52 – Moscow Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Request For Change (Rfc-Rmap-2024-002), Mike Mcanulty Sep 2024

Request For Change (Rfc-Rmap-2024-002), Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Request For Change (Rfc-Rmap-2024-002), Mike Mcanulty, Eric Hassler Sep 2024

Request For Change (Rfc-Rmap-2024-002), Mike Mcanulty, Eric Hassler

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Revised 2024 Residential Metals Abatement Program (Rmap) Walkerville Park (Alley Of North Main And Alley Of West Daly) Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Sep 2024

Draft Final Revised 2024 Residential Metals Abatement Program (Rmap) Walkerville Park (Alley Of North Main And Alley Of West Daly) Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report, Stantec Consulting Services, Inc. Sep 2024

Draft Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report, Stantec Consulting Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Field Sampling Plans (Fsps) And Response To Agency Comments – Bres No. 34e Eveline Dump East, Bres No. 52 Moscow Dump (Dated August 13, 2024) And The Bres No. 78 Original Mine Yard (Updated On September 6, 2024), Molly Roby Sep 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Field Sampling Plans (Fsps) And Response To Agency Comments – Bres No. 34e Eveline Dump East, Bres No. 52 Moscow Dump (Dated August 13, 2024) And The Bres No. 78 Original Mine Yard (Updated On September 6, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Draft Bpsou 2023 Site-Wide Surface Water Data Summary Report (Dated May 31, 2024), Emma Rott Sep 2024

Re: Comment Letter For Draft Bpsou 2023 Site-Wide Surface Water Data Summary Report (Dated May 31, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Groundwater Model Technical Memorandum, Stantec Consulting Services, Inc. Sep 2024

Groundwater Model Technical Memorandum, Stantec Consulting Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Blacktail Creek (Btc) Pumping Test Interpretation Technical Memorandum, Stantec Consulting Services, Inc. Sep 2024

Blacktail Creek (Btc) Pumping Test Interpretation Technical Memorandum, Stantec Consulting Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Response To Agency Comments On The Butte Priority Soils Operable Unit (Bpsou) Draft Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report Prepared For Atlantic Richfield Company By Stantec Consulting Services, Inc. Dated September 12, 2024 Date Of Comments: February 1, 2024, Stantec Consulting Services, Inc. Sep 2024

Response To Agency Comments On The Butte Priority Soils Operable Unit (Bpsou) Draft Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report Prepared For Atlantic Richfield Company By Stantec Consulting Services, Inc. Dated September 12, 2024 Date Of Comments: February 1, 2024, Stantec Consulting Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou), Draft Residential Metals Abatement Program Construction Completion Report (Non‐Residential Parcels – Indoor Dust) –East Middle School (Dated March 29, 2024), Molly Roby Sep 2024

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou), Draft Residential Metals Abatement Program Construction Completion Report (Non‐Residential Parcels – Indoor Dust) –East Middle School (Dated March 29, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Reduction Works (Brw) Phase Iii Quality Assurance Project Plan (Qapp) Request For Change Brw-2024-01, Josh Bryson Sep 2024

Re: Butte Reduction Works (Brw) Phase Iii Quality Assurance Project Plan (Qapp) Request For Change Brw-2024-01, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp), Molly Roby Sep 2024

Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) For Bres No. 181 – Mountain Con-3 Dump, Molly Roby Sep 2024

Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) For Bres No. 181 – Mountain Con-3 Dump, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Butte Reduction Works (Brw) Phase Iii Quality Assurance Project Plan (Qapp) Request Of Change Brw-2024-01 (Dated August 30, 2024)., Emma Rott Sep 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Butte Reduction Works (Brw) Phase Iii Quality Assurance Project Plan (Qapp) Request Of Change Brw-2024-01 (Dated August 30, 2024)., Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Methane Fluxes In Tidal Marshes Of The Conterminous United States, Ariane Arias-Ortiz, Jaxine Wolfe, Scott D. Bridgham, Sara Knox, Gavin Mcnicol, Brian A. Needelman, Julie Shahan, Ellen J. Stuart-Haëntjens, Lisamarie Windham-Myers, Patty Y. Oikawa, Dennis D. Baldocchi, Joshua S. Caplan, Margaret Capooci, Kenneth M. Czapla, R. Kyle Derby, Heida L. Diefenderfer, Inke Forbrich, Gina Groseclose, Jason K. Keller, Cheryl Kelley, Amir E. Keshta, Helena S. Kleiner, Ken W. Krauss, Robert R. Lane, Sarah Mack, Serena Moseman-Valtierra, Thomas J. Mozdzer, Peter Mueller, Scott C. Neubauer, Genevieve Noyce, Katrina V. R. Schäfer, Rebecca Sanders-Demott, Charles A. Schutte, Rodrigo Vargas, Nathaniel B. Weston, Benjamin Wilson, J. Patrick Megonigal, James R. Homquist Sep 2024

Methane Fluxes In Tidal Marshes Of The Conterminous United States, Ariane Arias-Ortiz, Jaxine Wolfe, Scott D. Bridgham, Sara Knox, Gavin Mcnicol, Brian A. Needelman, Julie Shahan, Ellen J. Stuart-Haëntjens, Lisamarie Windham-Myers, Patty Y. Oikawa, Dennis D. Baldocchi, Joshua S. Caplan, Margaret Capooci, Kenneth M. Czapla, R. Kyle Derby, Heida L. Diefenderfer, Inke Forbrich, Gina Groseclose, Jason K. Keller, Cheryl Kelley, Amir E. Keshta, Helena S. Kleiner, Ken W. Krauss, Robert R. Lane, Sarah Mack, Serena Moseman-Valtierra, Thomas J. Mozdzer, Peter Mueller, Scott C. Neubauer, Genevieve Noyce, Katrina V. R. Schäfer, Rebecca Sanders-Demott, Charles A. Schutte, Rodrigo Vargas, Nathaniel B. Weston, Benjamin Wilson, J. Patrick Megonigal, James R. Homquist

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

Methane (CH4) is a potent greenhouse gas (GHG) with atmospheric concentrations that have nearly tripled since pre-industrial times. Wetlands account for a large share of global CH4 emissions, yet the magnitude and factors controlling CH4 fluxes in tidal wetlands remain uncertain. We synthesized CH4 flux data from 100 chamber and 9 eddy covariance (EC) sites across tidal marshes in the conterminous United States to assess controlling factors and improve predictions of CH4 emissions. This effort included creating an open-source database of chamber-based GHG fluxes (https://doi.org/10.25573/serc.14227085). Annual fluxes across chamber and EC sites averaged 26 ± 53 g CH4 …


Re: Approved Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan Request For Change To Install Additional Test Pits And Perform Material Characterization, Josh Bryson Sep 2024

Re: Approved Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan Request For Change To Install Additional Test Pits And Perform Material Characterization, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Comments On Bpsou “Diggings East 60% Remedial Design Package” Received From British Petroleum - Atlantic Richfield Company (Bp-Ar) On 4/23/2024, Jim Ford Sep 2024

Draft Comments On Bpsou “Diggings East 60% Remedial Design Package” Received From British Petroleum - Atlantic Richfield Company (Bp-Ar) On 4/23/2024, Jim Ford

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approved Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan Request For Change To Install Additional Test Pits And Perform Material Characterization, Josh Bryson Sep 2024

Approved Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan Request For Change To Install Additional Test Pits And Perform Material Characterization, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Reduction Works Interim Demolition Plan Phase Ii Encroachment Analysis, Pioneer Technical Services, Inc. Sep 2024

Butte Reduction Works Interim Demolition Plan Phase Ii Encroachment Analysis, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Reduction Works (Brw) Phase Ii Interim Demolition Plan Construction Drawings And Floodplain Encroachment Analysis, Josh Bryson Sep 2024

Butte Reduction Works (Brw) Phase Ii Interim Demolition Plan Construction Drawings And Floodplain Encroachment Analysis, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Root Lesion And Burrowing Nematodes And Their Management, Department Of Primary Industries And Regional Development, Western Australia Sep 2024

Root Lesion And Burrowing Nematodes And Their Management, Department Of Primary Industries And Regional Development, Western Australia

Grains and other field crops factsheets

Nematodes are common soil pests that feed on the roots of a wide range of crops in all agricultural areas of Western Australia, resulting in significant crop yield loss. Root lesion nematode can be managed but not eradicated.

This factsheet summarises the biology of the root lesion nematode (RLN, Pratylenchus spp.) and burrowing nematode (Radopholus spp.) species that damage Western Australian (WA) crops, and their diagnosis and management.


Revised Draft Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Sep 2024

Revised Draft Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.