Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring Commons

Open Access. Powered by Scholars. Published by Universities.®

Environmental Indicators and Impact Assessment

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 391 - 420 of 4584

Full-Text Articles in Environmental Monitoring

Macroinvertebrate Taxonomic And Functional Diversity In The Spokane River Watershed, Kaitlin L. Abell Jan 2026

Macroinvertebrate Taxonomic And Functional Diversity In The Spokane River Watershed, Kaitlin L. Abell

EWU Masters Thesis Collection

Changes in land use, such as agricultural expansion, have impacted stream systems by modifying discharge, substrate diversity, channel morphology, and nutrient inputs. The Spokane River Watershed is heavily impacted by human activity, including urban and agricultural development. Rehabilitation efforts are being organized to reintroduce Salmonidae species in the Spokane River Watershed. The first step of this reintroduction is to perform habitat studies to inform allocation of restoration efforts. As part of this effort, I performed benthic macroinvertebrate surveys throughout the watershed.

The objective of my research was to use the macroinvertebrate community as a biological indicator to determine which habitat …


A Geospatial Assessment Of Groundwater Salinization In A Multi-Aquifer System: Durango, Mexico, Juan Lopez-Sierra Jan 2026

A Geospatial Assessment Of Groundwater Salinization In A Multi-Aquifer System: Durango, Mexico, Juan Lopez-Sierra

Graduate Theses/Dissertations

Groundwater salinization poses a critical environmental concern for water resource sustainability in arid and semi-arid regions. This study evaluates spatial and temporal patterns of groundwater salinity across the state of Durango, Mexico, using total dissolved solids (TDS), sodium adsorption ratio (SAR), as salinity indicators and nitrate-nitrogen (NO₃–N) as an anthropogenic indicator. Groundwater quality data were obtained from (CONAGUA), a Mexican water agency. To assess salinity variations with respect to time, while minimizing interannual sampling bias, two multi-year sampling periods were selected: 2012-2013, and 2020-2021. Final datasets consisted of 122 wells for 2012–2013 and 131 wells for 2020–2021. The wells were …


Swimming In Uncertainty: Filling Data Gaps And Providing An Educational Platform For Beach Water Quality At Tybee Island, Georgia, Lukas Roberson Jan 2026

Swimming In Uncertainty: Filling Data Gaps And Providing An Educational Platform For Beach Water Quality At Tybee Island, Georgia, Lukas Roberson

College of Graduate Studies: Theses & Dissertations

@font-face {font-family:"Cambria Math"; panose-1:2 4 5 3 5 4 6 3 2 4; mso-font-charset:0; mso-generic-font-family:roman; mso-font-pitch:variable; mso-font-signature:-536870145 1107305727 0 0 415 0;}p.MsoNormal, li.MsoNormal, div.MsoNormal {mso-style-unhide:no; mso-style-qformat:yes; mso-style-parent:""; margin:0in; mso-pagination:widow-orphan; font-size:12.0pt; font-family:"Times New Roman",serif; mso-fareast-font-family:"Times New Roman";}.MsoChpDefault {mso-style-type:export-only; mso-default-props:yes; mso-font-kerning:0pt; mso-ligatures:none;}div.WordSection1 {page:WordSection1;}

Swimming in beaches water contaminated with high levels of bacteria can make you sick. Current monitoring at the public beaches on Tybee Island consists of weekly monitoring and enumeration of fecal indicator bacteria that takes 24 hours for results. If the number of bacteria exceed regulatory limits, a public health advisory is issued, and affected waters are retested until …


Using Low-Cost Sensors For Source Attribution And Health Assessment: An Air Quality Study In Brownsville, Texas, Sai Deepak Pinakana, Kabir Bahadur Shah, Daniel Jaffe, Juan L. Gonzalez, Owen Temby, Gabriel Ibarra-Mejia, Amit U. Raysoni Jan 2026

Using Low-Cost Sensors For Source Attribution And Health Assessment: An Air Quality Study In Brownsville, Texas, Sai Deepak Pinakana, Kabir Bahadur Shah, Daniel Jaffe, Juan L. Gonzalez, Owen Temby, Gabriel Ibarra-Mejia, Amit U. Raysoni

School of Earth, Environmental, & Marine Sciences Faculty Publications

Air quality monitoring remains a challenge in areas lacking or having sparse federal monitoring infrastructure, posing significant barriers to public health research. This study demonstrates the usage of low-cost sensors in addressing gaps in air quality monitoring, source attribution, and health risk assessment in a Brownsville, TX neighborhood impacted by emissions from a barite and celestite mineral processing unit. PM2.5 concentrations were measured using PurpleAir sensors deployed across three residential locations, with the site nearest to the processing unit recording a 24-h averaged PM2.5 concentration of 25.12 μg/m3—approximately 2.79 times higher than the nearest Texas Commission of Environmental Quality (TCEQ) …


2024 Annual Operations And Maintenance Report - 2024 Bres Annual Summary Report For Work Completed In Quadrant 4, Butte-Silver Bow Department Of Reclamation And Environmental Services Jan 2026

2024 Annual Operations And Maintenance Report - 2024 Bres Annual Summary Report For Work Completed In Quadrant 4, Butte-Silver Bow Department Of Reclamation And Environmental Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2023, Pioneer Technical Services, Inc. Jan 2026

Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2023, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2024 Annual Operations And Maintenance Report 2024 Bres Annual Summary Report For Work Completed In Quadrant 4, Butte-Silver Bow Department Of Reclamation And Environmental Services Jan 2026

2024 Annual Operations And Maintenance Report 2024 Bres Annual Summary Report For Work Completed In Quadrant 4, Butte-Silver Bow Department Of Reclamation And Environmental Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-20 Site Evaluation Summary Report (Dated October 24, 2025), Molly Roby Dec 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-20 Site Evaluation Summary Report (Dated October 24, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 32 – Corra 2 Dump Site Evaluation Summary Report (Dated October 24, 2025), Molly Roby Dec 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 32 – Corra 2 Dump Site Evaluation Summary Report (Dated October 24, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-13 Site Evaluation Summary Report (Dated October 22, 2025), Molly Roby Dec 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-13 Site Evaluation Summary Report (Dated October 22, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 38 – Sister Dump Site Evaluation Summary Report (Dated September 30, 2025), Molly Roby Dec 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 38 – Sister Dump Site Evaluation Summary Report (Dated September 30, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval For The Butte Priority Soils Operable Unit (Bpsou) Revised Unreclaimed Sites Ur-08 (Anderson Shaft) – Remedial Action Work Plan (Rawp) (Dated October 24, 2025), Molly Roby Dec 2025

Re: Conditional Approval For The Butte Priority Soils Operable Unit (Bpsou) Revised Unreclaimed Sites Ur-08 (Anderson Shaft) – Remedial Action Work Plan (Rawp) (Dated October 24, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Experiences Of Bukidnon Farmers On The Use Of Carbonized Rice Hulls (Crh) Waste From Biomass Boilers As A Soil Conditioner, Dash Constantine S. Chamen, Queen Loraine D. Ban, Michael Justin O. Eluna, Pole Honson B. Gabitano, Ian Jay P. Saldo, Jhovel Roy D. Calo Dec 2025

Experiences Of Bukidnon Farmers On The Use Of Carbonized Rice Hulls (Crh) Waste From Biomass Boilers As A Soil Conditioner, Dash Constantine S. Chamen, Queen Loraine D. Ban, Michael Justin O. Eluna, Pole Honson B. Gabitano, Ian Jay P. Saldo, Jhovel Roy D. Calo

Sinaya: A Philippine Journal for Senior High School Teachers and Students

The long-term use of agricultural products that adversely affect soil is a significant issue for farmers. This study explored the potential of carbonized rice hulls (CRH) waste from biomass boilers as a sustainable soil conditioner. The research investigated the specific soil conditioning properties of CRH and explored the lived experiences of nine (9) Bukidnon farmers to correlate their observations with the material’s chemical profile. The composition analysis identified a high silica content and essential micronutrients, such as calcium and magnesium, which act as nutrient restorers and pH regulators. The thematic analysis of semi-structured interviews, four themes emerged to summarize the …


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 30 – Atlantic-1 Site Evaluation Summary Report (Dated October 24, 2025), Molly Roby Dec 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 30 – Atlantic-1 Site Evaluation Summary Report (Dated October 24, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 37 – Josephine Shaft Site Evaluation Summary Report (Dated October 16, 2025), Molly Roby Dec 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 37 – Josephine Shaft Site Evaluation Summary Report (Dated October 16, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Third Quarter 2025, Pioneer Technical Services, Inc. Dec 2025

Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Third Quarter 2025, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp) (Dated November 24, 2025), Emma Rott Dec 2025

Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp) (Dated November 24, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp) (Dated November 18, 2025), Emma Rott Dec 2025

Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp) (Dated November 18, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Revised Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System - 2023 (Dated October 29, 2025), Emma Rott Dec 2025

Re: Approval Letter For The Revised Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System - 2023 (Dated October 29, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Revised Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Annual Operations, Maintenance, And Monitoring (Om&M) Plan – 2023 (Dated October 29, 2025), Emma Rott Dec 2025

Re: Approval Letter For The Revised Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Annual Operations, Maintenance, And Monitoring (Om&M) Plan – 2023 (Dated October 29, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


A Predictive Model For Multi- Week Respiratory Risk From Red Tide On Florida’S Gulf Coast., Elmer S. Ochaeta Dec 2025

A Predictive Model For Multi- Week Respiratory Risk From Red Tide On Florida’S Gulf Coast., Elmer S. Ochaeta

Computer Science and Engineering Faculty Publications

Florida’s Gulf Coast red tide (Karenia brevis) can put toxins into the air, making people cough, irritating the throat, and worsening asthma or other breathing problems especially when winds blow from the ocean toward the beach. Right now, most public updates don’t really help with the question people actually ask when planning a weekend or vacation: “Will going to or close to the beach be risky in the next few weeks?”.

In this project, I build a weekly early warning system that estimates respiratory risk for specific beaches and predicts that risk 2 to 4 weeks ahead. The study covers …


Final Butte Mine Waste Repository Geotechnical Investigation Work Plan, Pioneer Technical Services, Inc. Dec 2025

Final Butte Mine Waste Repository Geotechnical Investigation Work Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Butte Mine Waste Repository Geotechnical Investigation Work Plan, Pioneer Technical Services, Inc. Dec 2025

Final Butte Mine Waste Repository Geotechnical Investigation Work Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Greenhouse Gas Accounting For Western Australian Agriculture 2023, Johnny Machon, Christophe D'Abbadie Dec 2025

Greenhouse Gas Accounting For Western Australian Agriculture 2023, Johnny Machon, Christophe D'Abbadie

Climate Science Published Reports

This report presents new modelling of the greenhouse gas emissions attributable to Western Australia’s agricultural industries and provides an overview of sequestration at the state level. The report updates the estimates from previous technical reports by the Department of Primary Industries and Regional Development (DPIRD). It presents not only emissions from agricultural activities in Western Australia (WA) but also from the production of agricultural inputs and energy use. This broader picture of emissions aligns with frameworks for emissions reporting at the business and product level.

Total on-farm and pre-farm emissions are estimated to have been about 12.6–13.3 million tonnes of …


Solar Powered Conservation: The Effects Of Solar Photovoltaic Facilities On Avian Community Composition, Michael Christopher Ferrara Dec 2025

Solar Powered Conservation: The Effects Of Solar Photovoltaic Facilities On Avian Community Composition, Michael Christopher Ferrara

Graduate Theses and Dissertations

The expansion of solar photovoltaic energy infrastructure is transforming landscapes worldwide. Increasingly, facilities are planted with native vegetation, yet how vegetation characteristics and landscape variables shape wildlife communities in solar facilities remains poorly understood. Because avian populations have been in decline and are sensitive to habitat changes, understanding how solar facilities influence avian communities is important. In Chapter 1, we used autonomous recording units, local vegetation measurements, and land use and land cover data to quantify how avian community occupancy is influenced by solar cover in solar facilities and comparable reference sites. We used a Bayesian multi-species occupancy model to …


Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 96 – Washoe Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc. Dec 2025

Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 96 – Washoe Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-22 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Dec 2025

Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-22 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 16 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Dec 2025

Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 16 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2024, Pioneer Technical Services, Inc. Dec 2025

Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2024, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Final Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Quarterly Operation And Maintenance Report – Quarter 1 2024 (Dated August 14, 2025), Emma Rott Dec 2025

Re: Approval Letter For The Final Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Quarterly Operation And Maintenance Report – Quarter 1 2024 (Dated August 14, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.