Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring Commons™

Open Access. Powered by Scholars. Published by Universities.®

Environmental Indicators and Impact Assessment

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 2431 - 2460 of 4599

Full-Text Articles in Environmental Monitoring

Biodiversity Scale-Dependence And Opposing Multi-Level Correlations Underlie Differences Among Taxonomic, Phylogenetic And Functional Diversity, Nadejda A. Mirochnitchenko, Erica F. Stuber, Joseph J. Fontaine Dec 2021

Biodiversity Scale-Dependence And Opposing Multi-Level Correlations Underlie Differences Among Taxonomic, Phylogenetic And Functional Diversity, Nadejda A. Mirochnitchenko, Erica F. Stuber, Joseph J. Fontaine

Nebraska Cooperative Fish and Wildlife Research Unit: Staff Publications

Aim: Biodiversity is a multidimensional property of biological communities that represents different information depending on how it is measured, but how dimensions relate to one another and under what conditions is not well understood. We explore how taxonomic, phylogenetic, and functional diversity can differ in scale-of-effect dependence and habitat-biodiversity relationships, and subsequently how spatial differences among biodiversity dimensions may arise. Location: Nebraska, United States. Taxon: Birds. Methods: Across 2016 and 2017, we conducted 2,641 point counts at 781 sites. We modeled the occupancy of 141 species using Bayesian Bernoulli-Bernoulli hierarchical logistic regressions. We calculated species richness (SR), phylogenetic diversity (PD), …


Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites - Field Sampling And Investigation Plan (Fsp) Bres No. 104 - Colorado Dump – Final, Revision 1, Mike Mcanulty Dec 2021

Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites - Field Sampling And Investigation Plan (Fsp) Bres No. 104 - Colorado Dump – Final, Revision 1, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Longleaf Pine Restoration In The South Carolina Sandhills Wiregrass Gap, Jacob W. Murray Dec 2021

Longleaf Pine Restoration In The South Carolina Sandhills Wiregrass Gap, Jacob W. Murray

All Theses

Longleaf pine restoration has been a topic of great concern and intrigue in the southeast and has taken on new fervor in recent decades as restoration methods continue to develop. Many landowners and forest managers are now pursuing ecological forestry and restoration ecology in great numbers as a new form of land management. However, niche regions can often be overlooked, as is the case with the Carolina Sandhills Wiregrass Gap, an area devoid of wiregrass and one that is on the outskirt regions of the historical longleaf pine range. Field studies were conducted pre- and post-harvest during two growing seasons …


Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 154 – Clark Mill Tailings Ne., Mike Mcanulty Dec 2021

Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 154 – Clark Mill Tailings Ne., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Silver Bow Snow Management Plan, Mike Mcanulty, Eric Hassler Dec 2021

Butte Silver Bow Snow Management Plan, Mike Mcanulty, Eric Hassler

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) 2021- Unreclaimed Areas Quality Assurance Project Plan (Qapp), Request For Change (Rfc)-01, Mike Mcanulty Nov 2021

Butte Priority Soils Operable Unit (Bpsou) 2021- Unreclaimed Areas Quality Assurance Project Plan (Qapp), Request For Change (Rfc)-01, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site, Trec Inc., A Woodard And Curran Company Nov 2021

Silver Bow Creek/Butte Area Npl Site, Trec Inc., A Woodard And Curran Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site, Trec Inc., A Woodard And Curran Company Nov 2021

Silver Bow Creek/Butte Area Npl Site, Trec Inc., A Woodard And Curran Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek Butte Area Npl Site 2022 Draft Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Qapp. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson Nov 2021

Silver Bow Creek Butte Area Npl Site 2022 Draft Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Qapp. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Atlantic Richfield Response To Approval Letter For The Final Butte Priority Soils Operable Unit (Bpsou), 2022 Draft Interim Site-Wide Groundwater Monitoring, Quality Assurance Project Plan (Qapp) (Dated November 23, 2021), Atlantic Richfield Company Nov 2021

Atlantic Richfield Response To Approval Letter For The Final Butte Priority Soils Operable Unit (Bpsou), 2022 Draft Interim Site-Wide Groundwater Monitoring, Quality Assurance Project Plan (Qapp) (Dated November 23, 2021), Atlantic Richfield Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Epa Region 8 Qa Document Review Crosswalk, Nikia Greene Nov 2021

Epa Region 8 Qa Document Review Crosswalk, Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site, Trec Inc., A Woodard And Curran Company Nov 2021

Silver Bow Creek/Butte Area Npl Site, Trec Inc., A Woodard And Curran Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan For Microbial Analysis And Biotreatability Study, Josh Bryson Nov 2021

Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan For Microbial Analysis And Biotreatability Study, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Spatial Distribution Of Pm2.5-Related Premature Mortality In China, Sheng Zheng, Uwe Schlink, Kin-Fai Ho, Ramesh P. Singh, Andrea Pozzer Nov 2021

Spatial Distribution Of Pm2.5-Related Premature Mortality In China, Sheng Zheng, Uwe Schlink, Kin-Fai Ho, Ramesh P. Singh, Andrea Pozzer

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

PM2.5 is a major component of air pollution in China and has a serious threat to public health. It is very important to quantify spatial characteristics of the health effects caused by outdoor PM2.5 exposure. This study analyzed the spatial distribution of PM2.5 concentration (45.9 μg/m3 national average in 2016) and premature mortality attributed to PM2.5 in cities at the prefectural level and above in China in 2016. Using the Global Exposure Mortality Model (GEMM), the total premature mortality in China was estimated to be 1.55 million persons, and the per capita mortality was 11.2 …


Spatial Distribution Of Pm2.5-Related Premature Mortality In China, Sheng Zheng, Uwe Schlink, Kin-Fai Ho, Ramesh P. Singh, Andrea Pozzer Nov 2021

Spatial Distribution Of Pm2.5-Related Premature Mortality In China, Sheng Zheng, Uwe Schlink, Kin-Fai Ho, Ramesh P. Singh, Andrea Pozzer

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

PM2.5 is a major component of air pollution in China and has a serious threat to public health. It is very important to quantify spatial characteristics of the health effects caused by outdoor PM2.5 exposure. This study analyzed the spatial distribution of PM2.5 concentration (45.9 μg/m3 national average in 2016) and premature mortality attributed to PM2.5 in cities at the prefectural level and above in China in 2016. Using the Global Exposure Mortality Model (GEMM), the total premature mortality in China was estimated to be 1.55 million persons, and the per capita mortality was 11.2 …


Response To Comments For 2020 Bpsou Uao Submittal: Revised Final Multi-Pathway Residential Metals Abatement Program Plan (Received January 21, 2021), Mike Mcanulty Nov 2021

Response To Comments For 2020 Bpsou Uao Submittal: Revised Final Multi-Pathway Residential Metals Abatement Program Plan (Received January 21, 2021), Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Butte Priority Soils Operable Unit Community Engagement Plan For Remedial Work, Josh Bryson, Eric Hassler Nov 2021

Final Butte Priority Soils Operable Unit Community Engagement Plan For Remedial Work, Josh Bryson, Eric Hassler

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Making Agriculture Carbon Neutral Amid A Changing Climate: The Case Of South-Western Australia, Ross Kingwell Nov 2021

Making Agriculture Carbon Neutral Amid A Changing Climate: The Case Of South-Western Australia, Ross Kingwell

Climate Science Research Articles

Making Australian agriculture carbon neutral by 2050 is a goal espoused by several agricultural organisations in Australia. How costly might it be to attain that goal, especially when adverse climate change projections apply to agriculture in southern Australia? This study uses scenario analysis to examine agricultural emissions and their abatement via reforestation in south-western Australia under projected climate change. Most scenarios include the likelihood of agricultural emissions being reduced in the coming decades. However, the impact of projected adverse climate change on tree growth and tree survival means that the cost of achieving agricultural carbon neutrality via reforestation is forecast …


2022 Final Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan, Trec Inc., A Woodard And Curran Company Nov 2021

2022 Final Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan, Trec Inc., A Woodard And Curran Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site, Trec Inc., A Woodard And Curran Company Nov 2021

Silver Bow Creek/Butte Area Npl Site, Trec Inc., A Woodard And Curran Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek Butte Area Npl Site 2022 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson Nov 2021

Silver Bow Creek Butte Area Npl Site 2022 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Sbc/Butte Area Npl Site Final Bpsou Interim Site-Wide Surface Water Monitoring Qapp 2020 And 2021 Monitoring Period, 10/14/20, Nikia Greene Nov 2021

Sbc/Butte Area Npl Site Final Bpsou Interim Site-Wide Surface Water Monitoring Qapp 2020 And 2021 Monitoring Period, 10/14/20, Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Epa Region 8 Qa Document Review Crosswalk, Nikia Greene Nov 2021

Epa Region 8 Qa Document Review Crosswalk, Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp), Trec Inc., A Woodard And Curran Company Nov 2021

2022 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp), Trec Inc., A Woodard And Curran Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site 2022 Draft Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp), 11/16/21, Nikia Greene Nov 2021

Silver Bow Creek/Butte Area Npl Site 2022 Draft Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp), 11/16/21, Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


California Drought Outlooks Based On Climate Change Models’ Effects On Water Availability, Lauren Lynam, Thomas Piechota Nov 2021

California Drought Outlooks Based On Climate Change Models’ Effects On Water Availability, Lauren Lynam, Thomas Piechota

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

Future streamflow in California is evaluated based on eight climate projections models and the effects on water availability. The unimpaired projected streamflow for eleven California rivers, collected from Cal-Adapt, are compared with unimpaired historical flows (1950–2015) using eight climate model projections (2020–2099) identified as representative as possible future scenarios; Warm Dry RCP 4.5, Average RCP 4.5, Cool Wet RCP 4.5, Other RCP 4.5, Warm Dry RCP 8.5, Average RCP 8.5, Cool Wet RCP 8.5, and Other RCP 8.5. Projected drought deficits (or magnitudes), durations, and intensities are statistically tested against historical values to determine significance of differences between past streamflow …


Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Pioneer Technical Services, Inc. Nov 2021

Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


10587273 Edd, Pioneer Technical Services, Inc. Nov 2021

10587273 Edd, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


10586986 Edd, Pioneer Technical Services, Inc. Nov 2021

10586986 Edd, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments For: Draft Residential Metals Abatement Program Quality Assurance Project Plan (Non-Residential Parcels), Atlantic Richfield Company And Butte- Silver Bow County, Dated October 8, 2021, Nikia Greene Nov 2021

Comments For: Draft Residential Metals Abatement Program Quality Assurance Project Plan (Non-Residential Parcels), Atlantic Richfield Company And Butte- Silver Bow County, Dated October 8, 2021, Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.