Open Access. Powered by Scholars. Published by Universities.®
- Institution
-
- Montana Tech Library (1793)
- University of Nebraska - Lincoln (763)
- University of Kentucky (588)
- Department of Primary Industries and Regional Development, Western Australia (305)
- Chapman University (198)
-
- University of Nevada, Las Vegas (160)
- Portland State University (51)
- Old Dominion University (44)
- University of Louisville (43)
- University of Arkansas, Fayetteville (29)
- Eastern Kentucky University (28)
- Seattle University School of Law (26)
- California Polytechnic State University, San Luis Obispo (24)
- City University of New York (CUNY) (22)
- University of Southern Maine (19)
- SIT Graduate Institute/SIT Study Abroad (18)
- Western Kentucky University (14)
- Molloy University (13)
- University of Dayton (13)
- Central Washington University (12)
- Nova Southeastern University (12)
- Stony Brook University (12)
- Wilfrid Laurier University (12)
- Center for the Blue Economy (11)
- Colby College (11)
- Bemidji State University (10)
- Stephen F. Austin State University (10)
- University of Connecticut (10)
- Claremont Colleges (9)
- The University of San Francisco (9)
- Keyword
-
- Priority Soils (384)
- Gas (251)
- And Energy; Structural Materials; Sustainability (248)
- Energy Systems; Environmental Indicators and Impact Assessment; Environmental Monitoring; Mining Engineering; Oil (248)
- Metals Abatement (228)
-
- Western Australia (189)
- Unreclaimed Sites (145)
- Groundwater (141)
- Field Sampling (129)
- Consent Decree (121)
- Quality Assurance (121)
- Water quality (108)
- Drought (103)
- Insufficiently Reclaimed Sites (100)
- Indoor Dust (74)
- United States (74)
- Berkeley Pit (67)
- Salinity (64)
- Soil Sampling (62)
- Butte Treatment Lagoon (56)
- Climate change (56)
- Lead (55)
- Stormwater (54)
- Sustainability (53)
- Groundwater Monitoring (52)
- Smelter Area (52)
- Lake Mead (Ariz. and Nev.) (51)
- Blacktail Creek (49)
- Environment (49)
- Arsenic (48)
- Publication Year
- Publication
-
- Silver Bow Creek/Butte Area Superfund Site (1793)
- World of Coal Ash Proceedings (579)
- United States Agricultural Commodities in Drought Archive (219)
- Nebraska Cooperative Fish and Wildlife Research Unit: Staff Publications (166)
- National Drought Mitigation Center: Faculty Publications (135)
-
- Mathematics, Physics, and Computer Science Faculty Articles and Research (98)
- Publications (WR) (85)
- Biology, Chemistry, and Environmental Sciences Faculty Articles and Research (74)
- DroughtScape: Quarterly Newsletter of the National Drought Mitigation Center (2007–2023) (68)
- High Plains Regional Climate Center: Staff Publications (64)
- Resource management technical reports (64)
- Natural resources published reports (59)
- Sustain Magazine (41)
- Irrigated Agricultural Development in the North (39)
- EKU Faculty and Staff Scholarship (28)
- Environmental Science and Management Faculty Publications and Presentations (25)
- SITIE Symposiums (25)
- Status and Trends for Virginia Chesapeake Bay (23)
- Wildlife Monitoring (23)
- Fisheries Research Reports (21)
- Prairie Post: Quarterly Newsletter of the High Plains Regional Climate Center (21)
- Biosecurity factsheets (20)
- Graduate Theses and Dissertations (17)
- Nebraska Department of Environmental Quality: Reports (16)
- Independent Study Project (ISP) Collection (15)
- Elizabeth River Reports (14)
- Electronic Theses and Dissertations (13)
- Environmental Science and Management Professional Master's Project Reports (13)
- Master of Science in Environmental Sciences and Management Projects (13)
- The Coastal Monitor (13)
- Publication Type
Articles 241 - 270 of 4567
Full-Text Articles in Environmental Monitoring
2024 Annual Operations And Maintenance Report 2024 Bres Annual Summary Report For Work Completed In Quadrant 4, Butte-Silver Bow Department Of Reclamation And Environmental Services
2024 Annual Operations And Maintenance Report 2024 Bres Annual Summary Report For Work Completed In Quadrant 4, Butte-Silver Bow Department Of Reclamation And Environmental Services
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan, Woodard & Curran
Draft Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan, Woodard & Curran
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Silver Bow Creek Conservation Area Materials Management Plan, Pioneer Technical Services, Inc.
Final Silver Bow Creek Conservation Area Materials Management Plan, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Revised Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap), Pioneer Technical Services, Inc.
Final Revised Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Construction Impacts On Nutrient Loads In An Urban Stream In The Ozark Highlands, Matthew B. Wilson
Construction Impacts On Nutrient Loads In An Urban Stream In The Ozark Highlands, Matthew B. Wilson
Crop, Soil and Environmental Sciences Undergraduate Honors Theses
Degradation of water quality is primarily caused by human activity, including urbanization. Urban stream syndrome can be characterized as a stream that has undergone physical, chemical, and biological changes as a result of urbanization, which can include an influx of nutrients that can drive unwanted plant and algae growth. It is known that construction can result in untreated nutrients entering a stream; however, it is not understood how construction affects downstream nutrient transport. The objective of this study was to understand the impacts of construction on urban water quality in Tanglewood Branch in Fayetteville, Arkansas, in the Ozark Highlands, which …
Enhancing Walleye (Ogaa) Recruitment: Evaluating Assisted Reproduction As A Mitigation Strategy, Douglass Keiser
Enhancing Walleye (Ogaa) Recruitment: Evaluating Assisted Reproduction As A Mitigation Strategy, Douglass Keiser
Biology Graduate Theses
Over the past several decades, cold- and cool-water fish populations across the Upper Midwest, including Minnesota and Wisconsin, have shown troubling signs of decline. Among the most affected is the walleye/Ogaa (Sander vitreus), a species deeply embedded in the ecological balance, cultural identity, and economic vitality of the region, and central to the lifeways, treaty-reserved rights, and resource stewardship of Tribal Nations, including Ojibwe communities across the Upper Midwest. Despite ongoing stocking efforts and harvest regulations, many lake systems have experienced persistent declines in natural recruitment, prompting resource agencies to investigate the underlying causes. One such system is …
Draft Final 2024 Reclamation Improvement Sampling: Bres No. 78 – Original Mine Yard Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Draft Final 2024 Reclamation Improvement Sampling: Bres No. 78 – Original Mine Yard Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For Draft Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Dated April 17, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For The Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Bres No. 30 – Atlantic 1 Remedial Action Work Plan (Rawp) (Dated March 24, 2026), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Joesphine Shaft (Bres No. 37) – Remedial Action Work Plan (Rawp) (Dated March 24, 2026), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #7: Ur-01, Ur-12, Ur-03, Ur-04, Ur-15, And Ur-17 Amendment (Dated April 28, 2026), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #7: Ur-01, Ur-12, Ur-03, Ur-04, Ur-15, And Ur-17 Amendment, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Whitehall Borrow Submittal #3 (Dated March 27, 2026), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Uniform Federal Policyquality Assurance Project Plan Addendum, Hydrogeologic, Inc.
Draft Uniform Federal Policyquality Assurance Project Plan Addendum, Hydrogeologic, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operably Unit (Bpsou) Revised Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System (Btl) Second Quarter 2025 (Dated April 10, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The 2024 Butte Priority Soils Operable Unit (Bpsou) Stormwater Evaluation And Maintenance Report (Dated April 8, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Conditional Approval Letter For Diggings East 95 % Remedial Design Package Submittal (Dated March 25, 2006), The Silver Bow Creek Conservation Area (Sbcca) – 95 Percent Programmatic Technical Specifications Submittal (Dated March 25, 2026), The Butte Priority Soils Operable Unit (Bpsou) Sbcca Operations And Maintenance (O&M) Plan (Dated March 24, 2026), And The Sbcca Final Principles For A Greener Cleanup Report (Dated February 4, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The 2022 Butte Priority Soils Operable Unit (Bpsou) Stormwater Evaluation And Maintenance Report (Dated April 8, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The 2023 Butte Priority Soils Operable Unit (Bpsou) Stormwater Evaluation And Maintenance Report (Dated April 8, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites New And Mahoney (Ur-23) Construction Completion Report (Ccr), Pioneer Technical Services, Inc.
Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites New And Mahoney (Ur-23) Construction Completion Report (Ccr), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites New And Mahoney (Ur-23) Construction Completion Report (Ccr), Pioneer Technical Services, Inc.
Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites New And Mahoney (Ur-23) Construction Completion Report (Ccr), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For The Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, 60% Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System (Dated March 2, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 96 – Washoe Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 96 – Washoe Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites: Ur-03 Construction Completion Report, Pioneer Technical Services, Inc.
Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites: Ur-03 Construction Completion Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites: Ur-03 Construction Completion Report, Pioneer Technical Services, Inc.
Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites: Ur-03 Construction Completion Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Brown Pelican (Pelecanus Occidentalis) Groundings On A Four-Lane Divided Highway In South Texas: A Comparative Study Using Citizen Science, Bradley Evan Beer, Kevin W. Ryer, Md. Saydur Rahman, John H. Young Jr., Richard J. Kline
Brown Pelican (Pelecanus Occidentalis) Groundings On A Four-Lane Divided Highway In South Texas: A Comparative Study Using Citizen Science, Bradley Evan Beer, Kevin W. Ryer, Md. Saydur Rahman, John H. Young Jr., Richard J. Kline
School of Integrative Biological & Chemical Sciences Faculty Publications
The population of the once-endangered brown pelican (Pelecanus occidentalis) has increased over the past several decades and is now considered fully recovered. However, in south Texas, the combined effects of weather patterns, transportation infrastructure, and brown pelican biology have led to road mortalities on State Highway 48 (SH 48) at the Carl “Joe” Gayman Bridge. To mitigate these mortalities, the Texas Department of Transportation modified traffic barriers on SH 48. We aimed to examine the effect of the barrier change and determine which weather variables influence brown pelican groundings on SH 48. Citizen scientists monitored sections of SH …
Butte Priority Soils Operable Unit (Bpsou) 2026 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
2024 Bpsou Stormwater Evaluation And Maintenance Report Annual Stormwater Report For Bpsou Stormwater Structures, Butte-Silver Bow Department Of Reclamation And Environmental Services
2024 Bpsou Stormwater Evaluation And Maintenance Report Annual Stormwater Report For Bpsou Stormwater Structures, Butte-Silver Bow Department Of Reclamation And Environmental Services
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.