Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring Commons™

Open Access. Powered by Scholars. Published by Universities.®

Environmental Indicators and Impact Assessment

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 1951 - 1980 of 4686

Full-Text Articles in Environmental Monitoring

Comments For The Draft Final Butte Priority Soils Operable Unit, Draft Final 2021 Unreclaimed Sites Sampling Ruby Street (Ur-05) Site Evaluation Summary Report (May 2022), Nikia Greene Aug 2022

Comments For The Draft Final Butte Priority Soils Operable Unit, Draft Final 2021 Unreclaimed Sites Sampling Ruby Street (Ur-05) Site Evaluation Summary Report (May 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Overall Data Summary, Pioneer Technical Services, Inc., Environmental Protection Agency Aug 2022

Overall Data Summary, Pioneer Technical Services, Inc., Environmental Protection Agency

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Q2 Bpsou Sw, Environmental Protection Agency, Pioneer Technical Services, Inc. Aug 2022

2022 Q2 Bpsou Sw, Environmental Protection Agency, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Tables A1, A2, A3, A4, A5 2021, Pioneer Technical Services, Inc., Environmental Protection Agency Aug 2022

Tables A1, A2, A3, A4, A5 2021, Pioneer Technical Services, Inc., Environmental Protection Agency

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2021 Second Quarter Laboratory Edd, Environmental Protection Agency, Pioneer Technical Services, Inc. Aug 2022

2021 Second Quarter Laboratory Edd, Environmental Protection Agency, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Electronic Data Wssou For Dsr, Environmental Protection Agency, Pioneer Technical Services, Inc. Aug 2022

Electronic Data Wssou For Dsr, Environmental Protection Agency, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2019 - 2021 Wsssou Data For Gis, Pioneer Technical Services, Inc. Aug 2022

2019 - 2021 Wsssou Data For Gis, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2021 2q Btl Chem Dump, Environmental Protection Agency, Pioneer Technical Services, Inc. Aug 2022

2021 2q Btl Chem Dump, Environmental Protection Agency, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2021 2q Btl Daily Pts Field Dump, Environmental Protection Agency, Pioneer Technical Services, Inc. Aug 2022

2021 2q Btl Daily Pts Field Dump, Environmental Protection Agency, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2021 3q Laboratory Edds, Pioneer Technical Services, Inc., Environmental Protection Agency Aug 2022

2021 3q Laboratory Edds, Pioneer Technical Services, Inc., Environmental Protection Agency

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


10578145, Pioneer Technical Services, Inc., Environmental Protection Agency Aug 2022

10578145, Pioneer Technical Services, Inc., Environmental Protection Agency

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


10585806 Edd, Pioneer Technical Services, Inc., Environmental Protection Agency Aug 2022

10585806 Edd, Pioneer Technical Services, Inc., Environmental Protection Agency

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2021 3q Btl Chemdump, Pioneer Technical Services, Inc., Environmental Protection Agency Aug 2022

2021 3q Btl Chemdump, Pioneer Technical Services, Inc., Environmental Protection Agency

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


10577877 Edd, Environmental Protection Agency, Pioneer Technical Services, Inc. Aug 2022

10577877 Edd, Environmental Protection Agency, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2021 3q Btl Daily Pts Field Dump, Environmental Protection Agency, Pioneer Technical Services, Inc. Aug 2022

2021 3q Btl Daily Pts Field Dump, Environmental Protection Agency, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2021 Btl O&M Events Log / 2021 Daily Log, Pioneer Technical Services, Inc., Environmental Protection Agency Aug 2022

2021 Btl O&M Events Log / 2021 Daily Log, Pioneer Technical Services, Inc., Environmental Protection Agency

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 16 - Curry., Mike Mcanulty Aug 2022

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 16 - Curry., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Removal Of Selenium And Heavy Metals From Coal Combustion Residuals Wastewater Using Surface Modified Iron Based Media, Madan Tandukar, Alex Korff, Andrew Vincent, Chris Hardin Aug 2022

Removal Of Selenium And Heavy Metals From Coal Combustion Residuals Wastewater Using Surface Modified Iron Based Media, Madan Tandukar, Alex Korff, Andrew Vincent, Chris Hardin

World of Coal Ash Proceedings

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2022 Street & Snow Management Plan (Dated July 29, 2022), Nikia Greene Aug 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2022 Street & Snow Management Plan (Dated July 29, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments For The Draft Final Butte Priority Soils Operable Unit, Draft Final 2021 Unreclaimed Sites Sampling – Minnie Irvine (Ur-01) Site Evaluation Summary Report (May 24, 2022), Nikia Greene Aug 2022

Comments For The Draft Final Butte Priority Soils Operable Unit, Draft Final 2021 Unreclaimed Sites Sampling – Minnie Irvine (Ur-01) Site Evaluation Summary Report (May 24, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For: Butte Priority Soils Operable Unit (Bpsou) Draft Final 2021 Bpsou Subdrain Data Summary Report (Dated May 4, 2022), Nikia Greene Aug 2022

Comment Letter For: Butte Priority Soils Operable Unit (Bpsou) Draft Final 2021 Bpsou Subdrain Data Summary Report (Dated May 4, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments For The Butte Priority Soils Operable Unit, Insufficiently Reclaimed Site – Clark Mill Tailings Ne (Bres No. 154) Evaluation Summary Report (May 4, 2022), Nikia Greene Aug 2022

Comments For The Butte Priority Soils Operable Unit, Insufficiently Reclaimed Site – Clark Mill Tailings Ne (Bres No. 154) Evaluation Summary Report (May 4, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 96 – Washoe Dump, Mike Mcanulty Aug 2022

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 96 – Washoe Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Silver Bow Creek Butte Area Npl Site Spring Semi-Annual 2022 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson Aug 2022

Re: Silver Bow Creek Butte Area Npl Site Spring Semi-Annual 2022 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 93 – Soudan Dump, Mike Mcanulty Aug 2022

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 93 – Soudan Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 30 – Atlantic-1, Mike Mcanulty Aug 2022

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 30 – Atlantic-1, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 133 – Dexter Mill, Mike Mcanulty Aug 2022

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 133 – Dexter Mill, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Spatio-Temporal Changes In Vegetation In The Last Two Decades (2001–2020) In The Beijing–Tianjin–Hebei Region, Yuan Zou, Wei Chen, Siliang Li, Tiejun Wang, Le Yu, Min Xu, Ramesh P. Singh, Cong-Qiang Liu Aug 2022

Spatio-Temporal Changes In Vegetation In The Last Two Decades (2001–2020) In The Beijing–Tianjin–Hebei Region, Yuan Zou, Wei Chen, Siliang Li, Tiejun Wang, Le Yu, Min Xu, Ramesh P. Singh, Cong-Qiang Liu

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

In terrestrial ecosystems, vegetation is sensitive to climate change and human activities. Its spatial-temporal changes also affect the ecological and social environment. In this paper, we considered the Beijing–Tianjin–Hebei region to study the spatio-temporal vegetation patterns. The detailed analysis of a moderate-resolution imaging spectroradiometer (MODIS) data were carried out through the Google Earth Engine (GEE) platform. Our results show a slow and tortuous upward trend in the average leaf area index (LAI) in the study region for the periods 2001–2020. Specifically, Beijing had the highest LAI value, with an average of 1.64 over twenty years, followed by Hebei (1.30) and …


Draft Final 2021 Unreclaimed Sites Sampling Ur-36 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Aug 2022

Draft Final 2021 Unreclaimed Sites Sampling Ur-36 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments For The Butte Priority Soils Operable Unit, 2018 Unreclaimed Sites Sampling Ur- 09 Site Evaluation Summary Report (February 18, 2022), Nikia Greene Aug 2022

Comments For The Butte Priority Soils Operable Unit, 2018 Unreclaimed Sites Sampling Ur- 09 Site Evaluation Summary Report (February 18, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.