Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring Commons™

Open Access. Powered by Scholars. Published by Universities.®

Environmental Indicators and Impact Assessment

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 1891 - 1920 of 4600

Full-Text Articles in Environmental Monitoring

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 93 – Soudan Dump, Mike Mcanulty Aug 2022

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 93 – Soudan Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 133 – Dexter Mill, Mike Mcanulty Aug 2022

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 133 – Dexter Mill, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Spatio-Temporal Changes In Vegetation In The Last Two Decades (2001–2020) In The Beijing–Tianjin–Hebei Region, Yuan Zou, Wei Chen, Siliang Li, Tiejun Wang, Le Yu, Min Xu, Ramesh P. Singh, Cong-Qiang Liu Aug 2022

Spatio-Temporal Changes In Vegetation In The Last Two Decades (2001–2020) In The Beijing–Tianjin–Hebei Region, Yuan Zou, Wei Chen, Siliang Li, Tiejun Wang, Le Yu, Min Xu, Ramesh P. Singh, Cong-Qiang Liu

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

In terrestrial ecosystems, vegetation is sensitive to climate change and human activities. Its spatial-temporal changes also affect the ecological and social environment. In this paper, we considered the Beijing–Tianjin–Hebei region to study the spatio-temporal vegetation patterns. The detailed analysis of a moderate-resolution imaging spectroradiometer (MODIS) data were carried out through the Google Earth Engine (GEE) platform. Our results show a slow and tortuous upward trend in the average leaf area index (LAI) in the study region for the periods 2001–2020. Specifically, Beijing had the highest LAI value, with an average of 1.64 over twenty years, followed by Hebei (1.30) and …


Draft Final 2021 Unreclaimed Sites Sampling Ur-36 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Aug 2022

Draft Final 2021 Unreclaimed Sites Sampling Ur-36 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments For The Butte Priority Soils Operable Unit, 2018 Unreclaimed Sites Sampling Ur- 09 Site Evaluation Summary Report (February 18, 2022), Nikia Greene Aug 2022

Comments For The Butte Priority Soils Operable Unit, 2018 Unreclaimed Sites Sampling Ur- 09 Site Evaluation Summary Report (February 18, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Low Levels Of Hybridization Between Sympatric Cold-Water-Adapted Arctic Cod And Polar Cod In The Beaufort Sea Confirm Genetic Distinctiveness, Robert E. Wilson, Sarah A. Sonsthagen, Philip Lavretsky, Andrew Majewski, Einar Árnason, Katrín Halldórsdóttir, Axel W. Einarsson, Kate Wedemeyer, Sandra L. Talbot Aug 2022

Low Levels Of Hybridization Between Sympatric Cold-Water-Adapted Arctic Cod And Polar Cod In The Beaufort Sea Confirm Genetic Distinctiveness, Robert E. Wilson, Sarah A. Sonsthagen, Philip Lavretsky, Andrew Majewski, Einar Árnason, Katrín Halldórsdóttir, Axel W. Einarsson, Kate Wedemeyer, Sandra L. Talbot

Nebraska Cooperative Fish and Wildlife Research Unit: Staff Publications

As marine ecosystems respond to climate change and other stressors, it is necessary to evaluate current and past hybridization events to gain insight on the outcomes and drivers of such events. Ancestral introgression within the gadids has been suggested to allow cod to inhabit a variety of habitats. Little attention has been given to contemporary hybridization, especially within cold-water-adapted cod (Boreogadus saida Lepechin, 1774 and Arctogadus glacialis Peters, 1872). We used whole-genome, restriction-site associated, and mitochondrial sequence data to explore the degree and direction of hybridization between these species where previous hybridization had not been reported. Although nearly identical …


Final Bpsou Insufficiently Reclaimed Sites Colorado Dump-West Lot Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Aug 2022

Final Bpsou Insufficiently Reclaimed Sites Colorado Dump-West Lot Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2021 Unreclaimed Sites Sampling Ur-03 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Aug 2022

Draft Final 2021 Unreclaimed Sites Sampling Ur-03 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling And Investigation Plan (Fsp) Bres No. 50 – Zelia, Mike Mcanulty Aug 2022

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling And Investigation Plan (Fsp) Bres No. 50 – Zelia, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Colorado Dump – West Lot Remedial Action Work Plan (Rawp) (Dated July 29, 2022), Nikia Greene Aug 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Colorado Dump – West Lot Remedial Action Work Plan (Rawp) (Dated July 29, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Blacktail Creek Pumping Test Quality Assurance Project Plan (Qapp) (Dated July 5, 2022), Nikia Greene Aug 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Blacktail Creek Pumping Test Quality Assurance Project Plan (Qapp) (Dated July 5, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 34 – Eveline (Dated July 22, 2022), Nikia Greene Aug 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 34 – Eveline (Dated July 22, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling And Investigation Plan (Fsp) Bres No. 08 – Belle Of Butte, Mike Mcanulty Aug 2022

Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling And Investigation Plan (Fsp) Bres No. 08 – Belle Of Butte, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Analysis Of Seismicity And Related Seismic Risk In Muslim Countries: Case Studies From Afghanistan And Pakistan, Ikramuddin Bahram Aug 2022

Analysis Of Seismicity And Related Seismic Risk In Muslim Countries: Case Studies From Afghanistan And Pakistan, Ikramuddin Bahram

Graduate Theses and Dissertations

How communities respond to a natural hazard is influenced by how they perceive it. This dissertation evaluated the gap between intent and action regarding earthquake hazards in Muslim countries with a focus on Afghanistan and Pakistan. Cultural biases provided predictions of risk perceptions and risk-taking preferences that were often more powerful than measures of knowledge and experience. In Muslim communities, perception of risk was influenced by the teachings of Islam and related rituals, traditions, and culture.

This study evaluated the seismicity and earthquake hazard in Afghanistan and Pakistan. Assessments of seismic risk and perception of danger were conducted to examine …


Application Of A 14c-Assay To Assess Methanotrophic Biodegradation Of Tce In Low Ph Groundwater, Evan Groome Aug 2022

Application Of A 14c-Assay To Assess Methanotrophic Biodegradation Of Tce In Low Ph Groundwater, Evan Groome

All Theses

Current biological strategies for remediating trichloroethylene (TCE) in low pH aquifers (i.e., pH14C-TCE assay was developed to determine pseudo first-order rate constants for the degradation of TCE in microcosms containing soil and groundwater from the Boeing Michigan Aeronautical Research Center (BOMARC) superfund site, where the pH ranges from 4.1 to 4.9. The 14C-TCE assay was also adapted to calculate soil-normalized rate constants for data from this site, as well as data that Szwast21 collected from the Beltsville Agricultural Research Center (BARC). In addition to natural attenuation, biostimulation through amendments of methane and nutrients were also assessed. This treatment …


Epbc 2010/5491: Weaber Plain Development Project Annual Environmental Report - 1st May 2021 To 30th April 2022, Department Of Primary Industries And Regional Development, Western Australia, Kimberley Boab Consulting Aug 2022

Epbc 2010/5491: Weaber Plain Development Project Annual Environmental Report - 1st May 2021 To 30th April 2022, Department Of Primary Industries And Regional Development, Western Australia, Kimberley Boab Consulting

Irrigated Agricultural Development in the North

This Weaber Plain Development Project EPBC Annual Environment Report for the period 1 May 2021 to 30 April 2022 has been developed in accordance with Condition 3 of the Commonwealth Environmental Approval for the Weaber Plain Development Project, EPBC 2010/5491, issued under the Environment Protection and Biodiversity Conservation (EPBC) Act 1999.

The Western Australian Government, Kimberley Agricultural Investment Pty Ltd (KAI) and the Yawoorroong Miriuwung Gajerrong Yirrgeb Noong Dawang Aboriginal Corporation (MG Corp) are completing farm development and conducting irrigated agriculture across the Weaber Plain, north of Kununurra in the eastern Kimberley region of WA.

This report has been prepared …


Final Butte Reclaimed Areas Maintenance And Monitoring (M&M) Plan In Accordance With Butte Reclamation Evaluation System (Bres), Pioneer Technical Services, Inc. Aug 2022

Final Butte Reclaimed Areas Maintenance And Monitoring (M&M) Plan In Accordance With Butte Reclamation Evaluation System (Bres), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Solid Media Management Program Plan, Pioneer Technical Services, Inc. Aug 2022

Revised Draft Final Solid Media Management Program Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 37 – Josephine Shaft, Mike Mcanulty Jul 2022

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 37 – Josephine Shaft, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Jul 2022

2022 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Revised Final Residential Metals Abatement Program (Rmap) Plan, Mike Mcanulty Jul 2022

Butte Priority Soils Operable Unit (Bpsou) Revised Final Residential Metals Abatement Program (Rmap) Plan, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Response To Comments For Butte Priority Soils Operable Unit (Bpsou) Draft Final Street And Snow Management Plan (Received December 15, 2021), Mike Mcanulty Jul 2022

Response To Comments For Butte Priority Soils Operable Unit (Bpsou) Draft Final Street And Snow Management Plan (Received December 15, 2021), Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 32 – Corra-2 Dumps, Mike Mcanulty Jul 2022

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 32 – Corra-2 Dumps, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Jul 2022

2022 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Bpsou Insufficiently Reclaimed Sites Colorado Dump-West Lot Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Jul 2022

Final Bpsou Insufficiently Reclaimed Sites Colorado Dump-West Lot Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Revised Final Residential Metals Abatement Program (Rmap) Plan, Mike Mcanulty Jul 2022

Re: Butte Priority Soils Operable Unit (Bpsou) Revised Final Residential Metals Abatement Program (Rmap) Plan, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final 2022 Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp) (Dated July 12, 2022), Nikia Greene Jul 2022

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final 2022 Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp) (Dated July 12, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For: Bpsou Draft 2021 Stormwater Evaluation And Maintenance Report, (Dated July 14, 2022), Nikia Greene Jul 2022

Comment Letter For: Bpsou Draft 2021 Stormwater Evaluation And Maintenance Report, (Dated July 14, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2021 Unreclaimed Sites Sampling Ur-24 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Jul 2022

Draft Final 2021 Unreclaimed Sites Sampling Ur-24 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Medical Monitoring Working Group Meeting Minutes, Mike Mcanulty Jul 2022

Medical Monitoring Working Group Meeting Minutes, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.