Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring Commons™

Open Access. Powered by Scholars. Published by Universities.®

Environmental Indicators and Impact Assessment

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 1471 - 1500 of 4599

Full-Text Articles in Environmental Monitoring

Integrating Sensor Development, Risk Assessment, And Community Engagement To Support Environmental Justice In The Rural Community Of El Tiple, Colombia, David Bahamon Pinzon Aug 2023

Integrating Sensor Development, Risk Assessment, And Community Engagement To Support Environmental Justice In The Rural Community Of El Tiple, Colombia, David Bahamon Pinzon

All Dissertations

In Colombia, ethnic communities have traditionally been responsible stewards of natural resources. They recognize the importance of these resources for their livelihood, as well as their ancestral and cultural heritage. El Tiple, a rural Afro-Colombian community, has been affected by the incursion of private corporations that promoted the expansion of sugarcane monocrops in their territory. Since the introduction of the monoculture industry, local freshwater sources have been depleted due to intensive water use for irrigation of the sugarcane crops. Additionally, the intensive usage of agrochemicals has been linked with loss of native flora, damages to family farms, and pollution of …


Epbc 2010/5491: Weaber Plain Development Project Compliance Report - 1st May 2022 To 30th April 2023, Department Of Primary Industries And Regional Development, Western Australia Aug 2023

Epbc 2010/5491: Weaber Plain Development Project Compliance Report - 1st May 2022 To 30th April 2023, Department Of Primary Industries And Regional Development, Western Australia

Irrigated Agricultural Development in the North

The Weaber Plain Development Project (Goomig Project) was approved on 13 September 2011. The approval reference is EPBC 2010/5491 (the Approval).

The Goomig Project comprises irrigated farmland, associated infrastructure, and a buffer area on the Weaber Plain located about 30km north-northeast of Kununurra in Western Australia. Figure 1 shows the location and layout of the Goomig Project and interface with other projects including the Knox Creek Plain Irrigation Development (EPBC 2014/7143), Sorby Hills Silver Lead Zinc mining project, and Ord River Irrigation Area (ORIA) Stage 1 'Cave Springs' farms.

The Department of Primary Industries and Regional Development is the Goomig …


High-Energy Storm Events And Their Impacts On Carbon Storage In Tidal Wetlands Of South Carolina, Gavin Gleasman Aug 2023

High-Energy Storm Events And Their Impacts On Carbon Storage In Tidal Wetlands Of South Carolina, Gavin Gleasman

All Dissertations

Atmospheric carbon dioxide (CO2) concentrations have been increasing at an accelerating rate for the past two centuries, profoundly impacting global climate change. Atmospheric CO2 concentrations are influenced by the global carbon cycle through physical and biogeochemical pathways. Tidal wetland environments play a vital role in the global carbon cycle by offsetting atmospheric CO2 concentrations through their natural physiochemical processes of high autotrophic productivity, allochthonous organic matter deposition, anoxic soils, and continuous accretion which promotes carbon sequestration with long-term storage at the land-ocean margin. The Intergovernmental Panel on Climate Change (IPCC) and United States Global Change Research …


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised 2023 Residential Metals Abatement Program (Rmap) Field Sampling Plan (Fsp) – Indoor Dust – Group 8 – Gold Hill Lutheran Church (Creativity Factory Preschool) And United Congregational (Crayon Academy Preschool) (Dated July 26, 2023), Nikia Greene Aug 2023

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised 2023 Residential Metals Abatement Program (Rmap) Field Sampling Plan (Fsp) – Indoor Dust – Group 8 – Gold Hill Lutheran Church (Creativity Factory Preschool) And United Congregational (Crayon Academy Preschool) (Dated July 26, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Final Multi-Pathway Residential Metals Abatement Program Plan, Atlantic Richfield Company, Butte Silver Bow Aug 2023

Revised Final Multi-Pathway Residential Metals Abatement Program Plan, Atlantic Richfield Company, Butte Silver Bow

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Site- Wide Surface Water Monitoring Data Summary Report (Dated April 7, 2023), Nikia Greene Jul 2023

Re: Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Site- Wide Surface Water Monitoring Data Summary Report (Dated April 7, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Conditional Approval For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) 2021 Annual Operations And Maintenance (O&M) Report, 2021 Bres Annual Summary Report For Work Completed In Quadrant 1 (Dated November 18, 2022), Nikia Greene Jul 2023

Conditional Approval For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) 2021 Annual Operations And Maintenance (O&M) Report, 2021 Bres Annual Summary Report For Work Completed In Quadrant 1 (Dated November 18, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Site- Wide Surface Water Monitoring Data Summary Report (Dated April 7, 2023), Nikia Greene Jul 2023

Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Site- Wide Surface Water Monitoring Data Summary Report (Dated April 7, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 84 – Mandan Park Play Area, Mike Mcanulty Jul 2023

Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 84 – Mandan Park Play Area, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #12 [Aldersgate United Methodist Church], Pioneer Technical Services, Inc. Jul 2023

Draft Final 2023 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #12 [Aldersgate United Methodist Church], Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) 2021 Annual Operations And Maintenance (O&M) Report, 2021 Bres Annual Summary Report For Work Completed In Quadrant 1 (Dated November 18, 2022), Nikia Greene Jul 2023

Re: Conditional Approval For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) 2021 Annual Operations And Maintenance (O&M) Report, 2021 Bres Annual Summary Report For Work Completed In Quadrant 1 (Dated November 18, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2023 Final Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp), Woodard & Curran Jul 2023

2023 Final Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp), Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2023 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #11 [Montana Technological University (North Campus)], Pioneer Technical Services, Inc. Jul 2023

Final 2023 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #11 [Montana Technological University (North Campus)], Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Field Sampling Plan (Fsp) Submittal #11 [Covering Montana Technological University – North Campus] (Dated July 23, 2023), Nikia Greene Jul 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Field Sampling Plan (Fsp) Submittal #11 [Covering Montana Technological University – North Campus] (Dated July 23, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Field Sampling Plan (Fsp) Submittal #11 [Covering Montana Technological University – North Campus] (Dated July 23, 2023), Nikia Greene Jul 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Field Sampling Plan (Fsp) Submittal #11 [Covering Montana Technological University – North Campus] (Dated July 23, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2023 Final Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp), Woodard & Curran Jul 2023

2023 Final Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp), Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments For The Draft Residential Metals Abatement Program – Interior School Dust – Investigation Summary Report – West Elementary School (May 22, 2023), Nikia Greene Jul 2023

Comments For The Draft Residential Metals Abatement Program – Interior School Dust – Investigation Summary Report – West Elementary School (May 22, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments For The Draft Residential Metals Abatement Program – Interior School Dust – Investigation Summary Report – West Elementary School (May 22, 2023), Nikia Greene Jul 2023

Comments For The Draft Residential Metals Abatement Program – Interior School Dust – Investigation Summary Report – West Elementary School (May 22, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 48 – Old Glory West, Mike Mcanulty Jul 2023

Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 48 – Old Glory West, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 134 – Star West Dump, Mike Mcanulty Jul 2023

Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 134 – Star West Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 66 – West Ruby Dump, Mike Mcanulty Jul 2023

Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 66 – West Ruby Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 31 – Waste Dump #5, Mike Mcanulty Jul 2023

Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 31 – Waste Dump #5, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 174 – Buffalo South And Bres No 174 – Buffalo Ditch, Mike Mcanulty Jul 2023

Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 174 – Buffalo South And Bres No 174 – Buffalo Ditch, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 17 – Paymaster, Mike Mcanulty Jul 2023

Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 17 – Paymaster, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Residential Metals Abatement Program (Rmap) School Soil Sampling Field Sampling Plan (Fsp) Submittal #11 [Montana Technological University (North Campus)], Pioneer Technical Services, Inc. Jul 2023

Draft Final 2023 Residential Metals Abatement Program (Rmap) School Soil Sampling Field Sampling Plan (Fsp) Submittal #11 [Montana Technological University (North Campus)], Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) Buffalo Gulch 60 Percent Design (Dated December 9, 2022), Nikia Greene Jul 2023

Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) Buffalo Gulch 60 Percent Design (Dated December 9, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed (Ir) Sites Colorado Dump – West Lot Construction Completion Report (Ccr), Pioneer Technical Services, Inc. Jul 2023

Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed (Ir) Sites Colorado Dump – West Lot Construction Completion Report (Ccr), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) Buffalo Gulch 60 Percent Design (Dated December 9, 2022), Nikia Greene Jul 2023

Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) Buffalo Gulch 60 Percent Design (Dated December 9, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) Buffalo Gulch 60 Percent Design (Dated December 9, 2022), Nikia Greene Jul 2023

Re: Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) Buffalo Gulch 60 Percent Design (Dated December 9, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Waterbody Size Predicts Bank- And Boat-Angler Efforts, Derek S. Kane, Kevin L. Pope, Keith D. Koupal, Mark A. Pegg, Christopher J. Chizinski, Mark A. Kaemingk Jul 2023

Waterbody Size Predicts Bank- And Boat-Angler Efforts, Derek S. Kane, Kevin L. Pope, Keith D. Koupal, Mark A. Pegg, Christopher J. Chizinski, Mark A. Kaemingk

Nebraska Cooperative Fish and Wildlife Research Unit: Staff Publications

Bank- and boat-angler efforts are logistically difficult and costly to estimate, preventing landscape-scale estimates that are required to address current and future challenges (e.g., climate change, invasive species) for inland recreational fisheries. Using a large Nebraska, USA, recreational fishery dataset (N = 67 waterbodies), we demonstrate that waterbody size can be used to predict bank- and boat-angler efforts across a heterogeneous landscape of extra small (< 104 ha) and large (> 647 ha) waterbodies. Bank and boat anglers respond to waterbody size, however these relationships appear to be unique between the two angler types. Boat-angler efforts increased as a function of waterbody size, whereas bank-angler …