Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring Commons™

Open Access. Powered by Scholars. Published by Universities.®

Environmental Indicators and Impact Assessment

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 1141 - 1170 of 4599

Full-Text Articles in Environmental Monitoring

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plans (Fsps) And Final Unreclaimed Sites Fsps Request For Change Ur/Ir 2024-001, Mike Mcanulty Apr 2024

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plans (Fsps) And Final Unreclaimed Sites Fsps Request For Change Ur/Ir 2024-001, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2021-2022 Residential Metals Abatement Program (Rmap) Aware Early Head Start Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc. Apr 2024

Draft Final 2021-2022 Residential Metals Abatement Program (Rmap) Aware Early Head Start Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2024 Residential Metals Abatement Program (Rmap) Baptist Student Union (Former Mckinley School) Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Apr 2024

Final 2024 Residential Metals Abatement Program (Rmap) Baptist Student Union (Former Mckinley School) Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plans (Fsps) And Final Unreclaimed Sites Fsps Request For Change Ur/Ir 2024-001, Mike Mcanulty Apr 2024

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plans (Fsps) And Final Unreclaimed Sites Fsps Request For Change Ur/Ir 2024-001, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2021 Residential Metals Abatement Program (Rmap) Head Start (Former Lincoln School) Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc. Apr 2024

Draft Final 2021 Residential Metals Abatement Program (Rmap) Head Start (Former Lincoln School) Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Berkely Pit Repository Cost Comparison, Josh Bryson Apr 2024

Berkely Pit Repository Cost Comparison, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek Conservation Area (Sbcca) 60% Technical Specifications Submittal, Josh Bryson Apr 2024

Silver Bow Creek Conservation Area (Sbcca) 60% Technical Specifications Submittal, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites Final Ur Field Sampling Plan (Fsp) Submittal #4 – Request For Change (Rfc) -Ur Fsp #4-001., Mike Mcanulty Apr 2024

Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites Final Ur Field Sampling Plan (Fsp) Submittal #4 – Request For Change (Rfc) -Ur Fsp #4-001., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites Final Ur Field Sampling Plan (Fsp) Submittal #4 – Request For Change (Rfc) -Ur Fsp #4-001., Mike Mcanulty Apr 2024

Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites Final Ur Field Sampling Plan (Fsp) Submittal #4 – Request For Change (Rfc) -Ur Fsp #4-001., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Diggings East 60% Remedial Design Package Submittal, Josh Bryson Apr 2024

Butte Priority Soils Operable Unit Diggings East 60% Remedial Design Package Submittal, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) Silver Bow Montessori, Christopher Berg, Thomas J. Beckman, Environmental Resource Management (Erm) Apr 2024

Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) Silver Bow Montessori, Christopher Berg, Thomas J. Beckman, Environmental Resource Management (Erm)

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Residential Metals Abatement Program – Interior School Dust – Investigation Summary Report – After The Bell Child Care Center, Thomas J. Beckman, Christopher Berg, Environmental Resource Management (Erm) Apr 2024

Residential Metals Abatement Program – Interior School Dust – Investigation Summary Report – After The Bell Child Care Center, Thomas J. Beckman, Christopher Berg, Environmental Resource Management (Erm)

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Residential Metals Abatement Program Construction Completion Report Kennedy Elementary, Christopher Berg, Thomas J. Beckman, Environmental Resource Management (Erm) Apr 2024

Residential Metals Abatement Program Construction Completion Report Kennedy Elementary, Christopher Berg, Thomas J. Beckman, Environmental Resource Management (Erm)

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comments On The Repository And Haul Route Geotechnical Pre-Design Investigation Work Plan (Dated March 29, 2024), Repository And Proposed Haul Route – Silver Bow Creek Conservation Area Quality Assurance Project Plan (Dated March 29, 2024), And Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan (Dated March 22, 2024), Emma Rott Apr 2024

Re: Comments On The Repository And Haul Route Geotechnical Pre-Design Investigation Work Plan (Dated March 29, 2024), Repository And Proposed Haul Route – Silver Bow Creek Conservation Area Quality Assurance Project Plan (Dated March 29, 2024), And Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan (Dated March 22, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) Small World Day Care, Environmental Resource Management (Erm) Apr 2024

Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) Small World Day Care, Environmental Resource Management (Erm)

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Examination Of The Effects Of Ultraviolet Radiation On The Toxicity Of An Array Of Pesticides, Polyaromatic Hydrocarbons, And Pharmaceuticals Via In-Vitro Bioassays, Jessica R. Stephens Apr 2024

Examination Of The Effects Of Ultraviolet Radiation On The Toxicity Of An Array Of Pesticides, Polyaromatic Hydrocarbons, And Pharmaceuticals Via In-Vitro Bioassays, Jessica R. Stephens

LSU Master's Theses

Chemicals are often released via anthropogenic means both intentionally and unintentionally into aquatic environments. The chemical fate of these compounds can vary greatly depending on numerous factors that can include but are not limited to salinity, pH, dissolved oxygen, and exposure to ultraviolet radiation. The goal of this study was to investigate the effect of UV radiation on the level of toxicity of different chemicals over time. Chemicals were selected based on previous studies of the toxicity of both parent and metabolites formed as a result of photolysis. Anthracene, phenanthrene, anthraquinone, dicloran, chlorothalonil, hydroxy chlorothalonil, benzobicyclon hydrolysate, and sertraline were …


Final 2024 Butte Priority Soils Operable Unit Helehan Borrow Submittal #2, Pioneer Technical Services, Inc. Apr 2024

Final 2024 Butte Priority Soils Operable Unit Helehan Borrow Submittal #2, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


United Congregational Church (Crayon Academy Preschool), Environmental Resource Management (Erm) Apr 2024

United Congregational Church (Crayon Academy Preschool), Environmental Resource Management (Erm)

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #10: Ur-44, Ur-45, Ur-46, Ur-47, And Ur-48, Mike Mcanulty Apr 2024

Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #10: Ur-44, Ur-45, Ur-46, Ur-47, And Ur-48, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) United Congregational Church (Crayon Academy Preschool), Environmental Resource Management (Erm) Apr 2024

Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) United Congregational Church (Crayon Academy Preschool), Environmental Resource Management (Erm)

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Technical Specifications - Silver Bow Creek Conservation Area - 60% Submittal April 2024, Atlantic Richfield Company Apr 2024

Technical Specifications - Silver Bow Creek Conservation Area - 60% Submittal April 2024, Atlantic Richfield Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Blacktail Creek Remediation And Contaminated Groundwater Hydraulic Control Site Pumping Test Data Summary Report (Dsr), Pioneer Technical Services, Inc. Apr 2024

Final Blacktail Creek Remediation And Contaminated Groundwater Hydraulic Control Site Pumping Test Data Summary Report (Dsr), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Repository And Haul Route Geotechnical Pre-Design Investigation (Pdi) Work Plan, Jacobs Engineering Group Mar 2024

Repository And Haul Route Geotechnical Pre-Design Investigation (Pdi) Work Plan, Jacobs Engineering Group

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments For The Butte Priority Soils (Bpsou) Residential Metals Abatement Program (Rmap) – Interior School Dust – Investigation Summary Report – Gold Hill Lutheran (Dated February 5, 2024), Molly Roby Mar 2024

Comments For The Butte Priority Soils (Bpsou) Residential Metals Abatement Program (Rmap) – Interior School Dust – Investigation Summary Report – Gold Hill Lutheran (Dated February 5, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) East Middle School, Christopher Berg, Thomas J. Beckman Mar 2024

Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) East Middle School, Christopher Berg, Thomas J. Beckman

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2023, Pioneer Technical Services, Inc. Mar 2024

Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2023, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Enhancing Landslide Susceptibility Modelling Through A Novel Non-Landslide Sampling Method And Ensemble Learning Technique, Chao Zhou, Yue Wang, Ying Cao, Ramesh P. Singh, Bayes Ahmed, Mahdi Motagh, Yang Wang, Ling Chen, Guangchao Tan, Shanshan Li Mar 2024

Enhancing Landslide Susceptibility Modelling Through A Novel Non-Landslide Sampling Method And Ensemble Learning Technique, Chao Zhou, Yue Wang, Ying Cao, Ramesh P. Singh, Bayes Ahmed, Mahdi Motagh, Yang Wang, Ling Chen, Guangchao Tan, Shanshan Li

Mathematics, Physics, and Computer Science Faculty Articles and Research

In recent years, several catastrophic landslide events have been observed throughout the globe, threatening to lives and infrastructures. To minimize the impact of landslides, the need of landslide susceptibility map is important. The study aims to extract high-quality non-landslide samples and improve the accuracy of landslide susceptibility modelling (LSM) outcomes by applying a coupled method of ensemble learning and Machine Learning (ML). The Zigui-Badong section of the Three Gorges Reservoir area (TGRA) in China was considered in the present study. Twelve influencing factors were selected as inputs for LSM, and the relationship between each causal factor and landslide spatial development …


Epa Remedial Project Manager Change, Rocker Operable Unit Of The Silver Bow Creek/Butte Are, Civil Action No 89-39-Bu-Pgh, Jason Rappe Mar 2024

Epa Remedial Project Manager Change, Rocker Operable Unit Of The Silver Bow Creek/Butte Are, Civil Action No 89-39-Bu-Pgh, Jason Rappe

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) Butte Career Center / Webster Garfield, Christopher Berg, Thomas J. Beckman Mar 2024

Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) Butte Career Center / Webster Garfield, Christopher Berg, Thomas J. Beckman

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Residential Metals Abatement Program Construction Completion Report Butte Career Center / Webster Gar􀏐Ield, Christopher Berg, Thomas J. Beckman, Environmental Resource Management (Erm) Mar 2024

Residential Metals Abatement Program Construction Completion Report Butte Career Center / Webster Gar􀏐Ield, Christopher Berg, Thomas J. Beckman, Environmental Resource Management (Erm)

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.