Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring Commons™

Open Access. Powered by Scholars. Published by Universities.®

Environmental Health and Protection

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 211 - 240 of 3056

Full-Text Articles in Environmental Monitoring

Re: 1st Quarter 2026 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson May 2026

Re: 1st Quarter 2026 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek Conservation Area Approved Final Principles For A Greener Cleanup Report, Woodard & Curran May 2026

Silver Bow Creek Conservation Area Approved Final Principles For A Greener Cleanup Report, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Bpsou Blacktail Creek Riparian Actions Uniform Federal Policy Quality Assurance Project Plan Addendum (Dated April 24, 2026), Emma Rott May 2026

Re: Comment Letter For Bpsou Blacktail Creek Riparian Actions Uniform Federal Policy Quality Assurance Project Plan Addendum (Dated April 24, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Butte Reduction Works Smelter Area Intermediate 60% Remedial Design Submittal, Pioneer Technical Services, Inc., Atlantic Richfield Company May 2026

Butte Priority Soils Operable Unit Butte Reduction Works Smelter Area Intermediate 60% Remedial Design Submittal, Pioneer Technical Services, Inc., Atlantic Richfield Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2024 Unreclaimed Sites Sampling: Ur-21 Site Evaluation Summary Report, Pioneer Technical Services, Inc. May 2026

Draft Final 2024 Unreclaimed Sites Sampling: Ur-21 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Subject: Quarterly Operations And Maintenance Report Grove Gulch Sedimentation Bay For Fourth Quarter 2025 And First Quarter 2026 Silver Bow Creek/Butte Area Npl Site – Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson May 2026

Subject: Quarterly Operations And Maintenance Report Grove Gulch Sedimentation Bay For Fourth Quarter 2025 And First Quarter 2026 Silver Bow Creek/Butte Area Npl Site – Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2026 Revised Draft Final Bpsou Backfill And Cover Material Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. May 2026

2026 Revised Draft Final Bpsou Backfill And Cover Material Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2025, Pioneer Technical Services, Inc. May 2026

Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2025, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Old Butte Silver Bow Landfill/Clark Tailings Consolidated Waste Management Area (Ctcwma) Remedy Effectiveness Evaluation Phase I (Conceptual Site Model) (Dated February 27, 2026), Emma Rott May 2026

Re: Comment Letter For Old Butte Silver Bow Landfill/Clark Tailings Consolidated Waste Management Area (Ctcwma) Remedy Effectiveness Evaluation Phase I (Conceptual Site Model) (Dated February 27, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Butte Mine Waste Repository Operation And Maintenance (O&M) Plan, Pioneer Technical Services, Inc. May 2026

Draft Final Butte Mine Waste Repository Operation And Maintenance (O&M) Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Quality Assurance Project Plan (Qapp) (Dated April 16, 2026), Emma Rott May 2026

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Quality Assurance Project Plan (Qapp) (Dated April 16, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) 2026 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Josh Bryson May 2026

Butte Priority Soils Operable Unit (Bpsou) 2026 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For Draft Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Dated May 6, 2026), Emma Rott May 2026

Re: Conditional Approval Letter For Draft Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Dated May 6, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Quarterly Operation And Maintenance Report: Butte Treatment Lagoons (Btl) System– Fourth Quarter 2025 (Dated March 30, 2026), Emma Rott May 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Quarterly Operation And Maintenance Report: Butte Treatment Lagoons (Btl) System– Fourth Quarter 2025 (Dated March 30, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For Draft Final Silver Bow Creek Conservation Area Materials Management Plan Revision 1 (Dated March 24, 2026), Emma Rott May 2026

Re: Conditional Approval Letter For Draft Final Silver Bow Creek Conservation Area Materials Management Plan Revision 1 (Dated March 24, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For Final Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan And Draft Final Silver Bow Creek Conservation Area (Sbcca) Construction Monitoring Quality Assurance Project Plan (Dated April 7, 2026), Emma Rott May 2026

Re: Conditional Approval Letter For Final Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan And Draft Final Silver Bow Creek Conservation Area (Sbcca) Construction Monitoring Quality Assurance Project Plan (Dated April 7, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2024 Annual Operations And Maintenance Report 2024 Bres Annual Summary Report For Work Completed In Quadrant 4, Butte-Silver Bow Department Of Reclamation And Environmental Services May 2026

2024 Annual Operations And Maintenance Report 2024 Bres Annual Summary Report For Work Completed In Quadrant 4, Butte-Silver Bow Department Of Reclamation And Environmental Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan, Woodard & Curran May 2026

Draft Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2024 Reclamation Improvement Sampling: Bres No. 78 – Original Mine Yard Site Evaluation Summary Report, Pioneer Technical Services, Inc. May 2026

Draft Final 2024 Reclamation Improvement Sampling: Bres No. 78 – Original Mine Yard Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2026 Workshop On Bridging The Gaps: Tackling Microplastics And Nanoplastics Challenges In Coastal Ecosystems, Shenghua Wu, Kaushik Venkiteshwaran, Melike Dizbay-Onat, Alexandra Stenson, Jinhui Wang, Tina Miller-Way, Ebenezer Nyadjro, Bhuvnesh Bharti, John Weinstein, Yi Bao, Shihui Shen, Valerie Longa, Shenghua Zha, John Cleary, Marty Lind May 2026

2026 Workshop On Bridging The Gaps: Tackling Microplastics And Nanoplastics Challenges In Coastal Ecosystems, Shenghua Wu, Kaushik Venkiteshwaran, Melike Dizbay-Onat, Alexandra Stenson, Jinhui Wang, Tina Miller-Way, Ebenezer Nyadjro, Bhuvnesh Bharti, John Weinstein, Yi Bao, Shihui Shen, Valerie Longa, Shenghua Zha, John Cleary, Marty Lind

Workshops

This report presents the findings from the 2026 Workshop on Tackling Microplastics and Nanoplastics (MNPs) in Coastal Ecosystems, which took place in Mobile, Alabama. More than 140 experts from universities, government, industry, and community organizations gathered to address the increasing issue of MNPs in coastal regions.


Enhancing Walleye (Ogaa) Recruitment: Evaluating Assisted Reproduction As A Mitigation Strategy, Douglass Keiser May 2026

Enhancing Walleye (Ogaa) Recruitment: Evaluating Assisted Reproduction As A Mitigation Strategy, Douglass Keiser

Biology Graduate Theses

Over the past several decades, cold- and cool-water fish populations across the Upper Midwest, including Minnesota and Wisconsin, have shown troubling signs of decline. Among the most affected is the walleye/Ogaa (Sander vitreus), a species deeply embedded in the ecological balance, cultural identity, and economic vitality of the region, and central to the lifeways, treaty-reserved rights, and resource stewardship of Tribal Nations, including Ojibwe communities across the Upper Midwest. Despite ongoing stocking efforts and harvest regulations, many lake systems have experienced persistent declines in natural recruitment, prompting resource agencies to investigate the underlying causes. One such system is …


Final Silver Bow Creek Conservation Area Materials Management Plan, Pioneer Technical Services, Inc. May 2026

Final Silver Bow Creek Conservation Area Materials Management Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Revised Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap), Pioneer Technical Services, Inc. May 2026

Final Revised Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Silver Bow Creek Conservation Area (Sbcca) Draft Final Leak Detection Monitoring Plan, Stantec Consulting Services, Inc. May 2026

Butte Priority Soils Operable Unit (Bpsou) Silver Bow Creek Conservation Area (Sbcca) Draft Final Leak Detection Monitoring Plan, Stantec Consulting Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2025, Pioneer Technical Services, Inc. May 2026

Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2025, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #7: Ur-01, Ur-12, Ur-03, Ur-04, Ur-15, And Ur-17 Amendment (Dated April 28, 2026), Molly Roby Apr 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #7: Ur-01, Ur-12, Ur-03, Ur-04, Ur-15, And Ur-17 Amendment (Dated April 28, 2026), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Joesphine Shaft (Bres No. 37) – Remedial Action Work Plan (Rawp) (Dated March 24, 2026), Molly Roby Apr 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Joesphine Shaft (Bres No. 37) – Remedial Action Work Plan (Rawp) (Dated March 24, 2026), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Bres No. 30 – Atlantic 1 Remedial Action Work Plan (Rawp) (Dated March 24, 2026), Molly Roby Apr 2026

Re: Comment Letter For The Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Bres No. 30 – Atlantic 1 Remedial Action Work Plan (Rawp) (Dated March 24, 2026), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Draft Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Dated April 17, 2026), Emma Rott Apr 2026

Re: Comment Letter For Draft Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Dated April 17, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Ai-Driven Multispectral Drone Monitoring For Afforestation In Arid Environments, Hesham Morgan, Ali Elgendy, Brandon Tran, Tamer Ismail, Mohamed M. Moursy, Yehya Kh. Shehadeh, Ahmed Elgharib, Ahmed Abdullah Al-Dughairi, Ali El Mubarak, Khaled Allam Harhash, Hesham El-Askary Apr 2026

Ai-Driven Multispectral Drone Monitoring For Afforestation In Arid Environments, Hesham Morgan, Ali Elgendy, Brandon Tran, Tamer Ismail, Mohamed M. Moursy, Yehya Kh. Shehadeh, Ahmed Elgharib, Ahmed Abdullah Al-Dughairi, Ali El Mubarak, Khaled Allam Harhash, Hesham El-Askary

Mathematics, Physics, and Computer Science Faculty Articles and Research

Monitoring large-scale afforestation projects in arid and semi-arid environments requires accurate, high-resolution, and repeatable methods to assess tree survival and growth. In this study, we integrated unmanned aerial vehicle (UAV) multispectral imaging with an advanced object detection framework to evaluate vegetation establishment in the Shuayb Al-Budai afforestation site, part of the Imam Turki bin Abdullah Royal Natural Reserve, Kingdom of Saudi Arabia (KSA). Multispectral datasets were acquired using a MicaSense Altum-PT sensor and processed through a masked Region-based Convolutional Neural Network (RCNN) with two backbone architectures: ResNet-101 and VGG19-BN. The Mask R-CNN–ResNet-101 model achieved superior performance, with an overall accuracy …