Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring Commons™

Open Access. Powered by Scholars. Published by Universities.®

Environmental Health and Protection

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 1891 - 1920 of 3056

Full-Text Articles in Environmental Monitoring

2021 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study, Pioneer Technical Services, Inc. Jan 2022

2021 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Final Multi-Pathway Residential Metals Abatement Program Plan (Dated November 19, 2021), Nikia Greene Jan 2022

Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Final Multi-Pathway Residential Metals Abatement Program Plan (Dated November 19, 2021), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Revised Butte Reclamation Evaluation System (Bres) Field Manual (Dated July 2021), Nikia Greene Jan 2022

Approval Letter For The Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Revised Butte Reclamation Evaluation System (Bres) Field Manual (Dated July 2021), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Final Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp), Trec Inc., A Woodard And Curran Company Jan 2022

2022 Final Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp), Trec Inc., A Woodard And Curran Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site 2022 Final Butte Priority Soils Operable Unit Interim Sitewide Groundwater Monitoring Qapp, Trec Inc., A Woodard And Curran Company Jan 2022

Silver Bow Creek/Butte Area Npl Site 2022 Final Butte Priority Soils Operable Unit Interim Sitewide Groundwater Monitoring Qapp, Trec Inc., A Woodard And Curran Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek Butte Area Npl Site 2022 Draft Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Qapp. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Trec Inc., A Woodard And Curran Company Jan 2022

Silver Bow Creek Butte Area Npl Site 2022 Draft Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Qapp. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Trec Inc., A Woodard And Curran Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 30 – Atlantic-1, Mike Mcanulty Jan 2022

Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 30 – Atlantic-1, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For: Butte Priority Soils Operable Unit (Bpsou) Draft Final Blacktail Creek Remediation And Contaminated Groundwater Hydraulic Control Site, Pumping Test Quality Assurance Project Plan (Dated October 20, 2021), Nikia Greene Jan 2022

Comment Letter For: Butte Priority Soils Operable Unit (Bpsou) Draft Final Blacktail Creek Remediation And Contaminated Groundwater Hydraulic Control Site, Pumping Test Quality Assurance Project Plan (Dated October 20, 2021), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Pioneer Technical Services, Inc. Jan 2022

Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Nebraska Water Center Annual Report 2022, Nebraska Water Center, Daugherty Water For Food Global Institute Jan 2022

Nebraska Water Center Annual Report 2022, Nebraska Water Center, Daugherty Water For Food Global Institute

Nebraska Water Center: Administrative Materials

CONTENTS

Overview: The Nebraska Water Center (https://watercenter.unl.edu)

Fast Facts: NWC 2022 Snapshot

Our Work

Water Sciences Lab Sees Rapid Growth in 2022 (https://watercenter.unl.edu/water-sciences-laboratory2)

WSL is Key to AltEn Contamination Monitoring (https://go.unl.edu/mead)

Know Your Well Project Enters Third Phase (https://knowyourwell.unl.edu)

Computer Science Students Build New Platform for Know Your Well Data Collection

Water Sciences Laboratory Helps Nebraska Tackle Nitrate (https://watercenter.unl.edu/water-sciences-laboratory2)

Nebraska Rural Poll Includes Water Quality Questions (https://ruralpoll.unl.edu and https://go.unl.edu/nitrate_strategy)

NWC Holds Platte River Basin Conference (https://watercenter.unl.edu/2022-nebraska-water-conference)

Spring Seminar Series (https://watercenter.unl.edu/spring-seminar-series)

Water Center Undergoes Five-Year …


Spatial And Temporal Variability Of Mercury In Upper And Lower Red Lake Walleye, Tyler Orgon Jan 2022

Spatial And Temporal Variability Of Mercury In Upper And Lower Red Lake Walleye, Tyler Orgon

Biology Graduate Theses

Mercury is a global pollutant that is released into our environment by natural and anthropogenic processes resulting in extensive studies conducted on mercury cycling in aquatic ecosystems which has led to the issuance of human-health-based fish-consumption advisories. We examined total mercury concentrations in Walleye Sander vitreus from Upper and Lower Red Lakes, located in north central Minnesota, between 2019 and 2020. Upper and Lower Red Lake form a contiguous water body consisting of two large (483.1 and 665.6 km2, respectively) basins that are naturally connected by a 1.4 km-wide strait. Both basins are important fisheries for recreation, subsistence, and commercial …


Estimating Transport Of Diesel Particulate Emissions In The Portland Metro Using Lagrangian-Based Dispersion Modeling, Andrew Mckinley Rogers Jan 2022

Estimating Transport Of Diesel Particulate Emissions In The Portland Metro Using Lagrangian-Based Dispersion Modeling, Andrew Mckinley Rogers

Environmental Science and Management Professional Master's Project Reports

Air pollution from diesel combustion is a well-known and serious problem which adversely impacts human and environmental health throughout the world. One of the primary pollutants of concern from diesel combustion are the solid particles formed as a byproduct of the incomplete combustion of the diesel, also known as diesel particulate matter. As a result of the ubiquitous use of diesel-fired engines in urban environments, understanding the transport of diesel particulate matter from the exhaust is paramount in assessing human exposure to this toxic pollutant. Air dispersion modeling is one method to study how diesel particulate matter is transported and …


Atlantic Richfield Response To Comments Bpsou Draft Final Data Management Plan, Atlantic Richfield Company Jan 2022

Atlantic Richfield Response To Comments Bpsou Draft Final Data Management Plan, Atlantic Richfield Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Application Of Artificial Intelligence For Co2 Storage In Saline Aquifer (Smart Proxy For Snap-Shot In Time), Marwan Mohammed Alnuaimi Jan 2022

Application Of Artificial Intelligence For Co2 Storage In Saline Aquifer (Smart Proxy For Snap-Shot In Time), Marwan Mohammed Alnuaimi

Graduate Theses, Dissertations, and Problem Reports (ETD)

In recent years, artificial intelligence (AI) and machine learning (ML) technology have grown in popularity. Smart Proxy Models (SPM) are AI/ML based data-driven models which have proven to be quite crucial in petroleum engineering domain with abundant data, or operations in which large surface/ subsurface volume of data is generated. Climate change mitigation is one application of such technology to simulate and monitor CO2 injection into underground formations.

The goal of the SPM developed in this study is to replicate the results (in terms of pressure and saturation outputs) of the numerical reservoir simulation model (CMG) for CO2 injection into …


Zebra Mussel Length-Weight Relationships Across Various Substrate Types In Lake Bemidji, Mitch Kehne Jan 2022

Zebra Mussel Length-Weight Relationships Across Various Substrate Types In Lake Bemidji, Mitch Kehne

Journal of Earth and Life Science

As of November 2021, zebra mussels were confirmed in 270 Minnesotan lakes with another 232 lakes listed as infested due to their connection or proximity to where zebra mussels have been found. With lack of effective treatments to impede their spread, zebra mussels continue to colonize new areas causing ecological as well as economic harm. The goal of this study was to establish a length-weight relationship for the zebra mussel population in Lake Bemidji using shell length (SL) and wet weight (WW), as well as to assess substrate type and log transformed shell length as predictors of log transformed zebra …


Carli Creek Regional Water Quality Project: Assessing Water Quality Improvement At An Urban Stormwater Constructed Wetland, Christopher L. Desiderati Jan 2022

Carli Creek Regional Water Quality Project: Assessing Water Quality Improvement At An Urban Stormwater Constructed Wetland, Christopher L. Desiderati

Environmental Science and Management Professional Master's Project Reports

Stormwater management is an ongoing challenge in the United States and the world at-large. As state and municipal agencies grapple with conflicting interests like encouraging land development, complying with permits to control stormwater discharges, “urban stream syndrome” effects, and charges to steward natural resources for the long-term, some agencies may turn to constructed wetlands (CWs) as aesthetically pleasing and functional natural analogs for attenuating pollution delivered by stormwater runoff to rivers and streams. Constructed wetlands retain pollutants via common physical, physicochemical, and biological principles such as settling, adsorption, or plant and algae uptake. The efficacy of constructed wetlands for pollutant …


Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Pioneer Technical Services, Inc. Jan 2022

Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek Butte Area Npl Site 2022 Draft Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Qapp. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson Dec 2021

Silver Bow Creek Butte Area Npl Site 2022 Draft Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Qapp. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site, Trec Inc., A Woodard And Curran Company Dec 2021

Silver Bow Creek/Butte Area Npl Site, Trec Inc., A Woodard And Curran Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site, Trec Inc., A Woodard And Curran Company Dec 2021

Silver Bow Creek/Butte Area Npl Site, Trec Inc., A Woodard And Curran Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site 2022 Draft Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp), 11/16/21, Nikia Greene Dec 2021

Silver Bow Creek/Butte Area Npl Site 2022 Draft Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp), 11/16/21, Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Development And Validation Of A New Scale To Assess Air Quality Knowledge (Aqiq), Alessandro Del Ponte, Lina Ang, Lianjun Li, Noah Lim, Wilson Wai San Tam, Wei Jie Seow Dec 2021

Development And Validation Of A New Scale To Assess Air Quality Knowledge (Aqiq), Alessandro Del Ponte, Lina Ang, Lianjun Li, Noah Lim, Wilson Wai San Tam, Wei Jie Seow

Political Science Faculty Articles and Research

Background

Air pollution is a leading public health concern around the world. Assessing the public's knowledge about air quality is critical to calibrate public health interventions. However, previous efforts to measure knowledge about air quality (AQIQ) have not relied on consistent and validated measures, thus precluding cross-country comparisons. We aimed to develop a robust scale to assess AQIQ and tested it in multiple countries.

Methods

To evaluate the psychometric properties and select the best performing items out of 10 AQIQ questions, we used methods from classical test theory and item response theory. We evaluated the scales using several scalability measures, …


Silver Bow Creek/Butte Area Npl Site, Trec Inc., A Woodard And Curran Company Dec 2021

Silver Bow Creek/Butte Area Npl Site, Trec Inc., A Woodard And Curran Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Response To Agency Comments Received December 15 On Silver Bow Creek Butte Area Npl Site 2022 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson Dec 2021

Response To Agency Comments Received December 15 On Silver Bow Creek Butte Area Npl Site 2022 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Sbc/Butte Area Npl Site Final Bpsou Interim Site-Wide Surface Water Monitoring Qapp 2020 And 2021 Monitoring Period, 10/14/20, Nikia Greene Dec 2021

Sbc/Butte Area Npl Site Final Bpsou Interim Site-Wide Surface Water Monitoring Qapp 2020 And 2021 Monitoring Period, 10/14/20, Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Request For Change (Rfc) To The Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp) (Rfc-Brw-2021-03), Josh Bryson Dec 2021

Request For Change (Rfc) To The Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp) (Rfc-Brw-2021-03), Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Epa Region 8 Qa Document Review Crosswalk, Nikia Greene Dec 2021

Epa Region 8 Qa Document Review Crosswalk, Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Residential Metals Abatement Program Quality Assurance Project Plan (Non-Residential Parcels - Indoor Dust), Environmental Resource Management (Erm), Elsie King, Christopher Berg, Thomas J. Beckman Dec 2021

Residential Metals Abatement Program Quality Assurance Project Plan (Non-Residential Parcels - Indoor Dust), Environmental Resource Management (Erm), Elsie King, Christopher Berg, Thomas J. Beckman

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Residential Metals Abatement Program Quality Assurance Project Plan (Non-Residential Parcels - Indoor Dust), Elsie King, Christopher Berg, Thomas J. Beckman Dec 2021

Draft Residential Metals Abatement Program Quality Assurance Project Plan (Non-Residential Parcels - Indoor Dust), Elsie King, Christopher Berg, Thomas J. Beckman

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites – Field Sampling And Investigation Plan (Fsp) Bres No. 154 – Clark Mill Tailings Ne, Mike Mcanulty Dec 2021

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites – Field Sampling And Investigation Plan (Fsp) Bres No. 154 – Clark Mill Tailings Ne, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.